Text
tmtlu
.
JUL 211996
Docket Nos. 50-424, 50-425
License Nos. CPPR-108, CPPR-109
Georgia Power Company
ATTN: Mr. J. H. Miller, Jr.
President.
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-424/86-55 AND 50-425/86-28
,
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. R. Wiseman on June 23-27, 1986.
The inspection included a review of activi-
ties authorized for your Vogtle facility.
At the conclusion of the inspection,
the findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection Report
cc w/ enc 1:
(Seepage 2)
ge18
0
s
O
ft:W
l
8
..
._ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _
JUL 21 1996
,
.,
,
Georgia Power Company
2
cc w/ encl:
J.,A, O'Reilly, Senior Vice . President
$ttlear Operations
V. E. Conway, Senior Vice President &
d . ject Director
Pro
Foster, Vice President, Project
SuDrort
t M r. Rice, Vice President, Project
[ JEneering
r. H. Pinson, Vice President, Project
, Cjnstruction
V. T. Beckliam, Vice President &
Ge ral Manager - Operations
R.
Tiiomas, Vice President,
.
J censing
D. S. Read, General Manager,
uality Assurance
. W. Hayes, Vogtle Quality.
Assurance Manager
WRamsey, Manager -
3eadiness Review
W. B. Bockt.old, General Manager,
Juclear Operations
E. Gucwa, Manager, Nuclear Safety
and Licensing
M k Googe, Project
ConJtruction Manager
E.t E. Groover, Quality
Assurance Site Manager -
pstruction
J. A. Bailey, Project Licensing
M
Gkyger
Trowbridge, Esq. , St.aw,
r.
Pittman, Potts and Tjr wbridge
B. W. Ctiurctiill, Es
Jttman, Potts 4t(q., Stiaw,
d W owbridge
L. Blake, Jr. , Esq. , Straw,
E.NTtman, Fotts and9fowbridge
W Joiner, Troutman, Sanders,
'L ckerman and Astmore
3
V. G. Ledbetter, Commissioner,
De rtment of Human Resources
Badger, Office of Planning
.
.
'and Budget
LD/Kirkland, III, Counsel,
Office of trie Consumer's Utility
Co ncil
Teper, Georgians Against
.
Nuclear Energy
.
(cc w/ enc 1 cont'd - see page 3)
I
i
..
_
-.
. _
_ _
.
'.
jut 21 #
.
Georgia Power Company
3
(cc
encl cont'd)
W.
. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
Panel
M H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
p.Parde, Citizens Clinic, Director
Government Accountability Project
b
w/ encl:
Reis, ELD
.J. Hill,IE
[W. Miller,NRR
.Jrach, ED0
W Sinkule, RII
dChristnot,RII
%AEHtEsident Inspector
Document Control Desk
-
State of Georgia
f
RII
RII ,
RII
GRWiseman:lb
T onlon
AHerdt
07///86
if/[-
4
07/i /86
07/ /86
f
,