I VERMONT YA*EE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 86-11 FOR THE K) NTH OF NOVEMBER,1986 i
i J
t VYDPF 0411 pth*2*aM #!!!$P
/y' 9?
p R
?!
OPERATING 04TA REPORT DOCKET NO.
50-271 DRTE 861210 COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711 OPERATING STATUS 1.
Unit Name:
Vermont Yankee 2.
Reporting Period:
November 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe).
504 8.
If changes occur in capacity ratings (Items Number 3 throuch 7) since last report, give reasons.
N/A 9.
Power level to which restricted, if any (Net MWe). N/A
- 10. Reasons for restrictions, if any.
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720.00 8016.00
- 12. Number of Hours Reactor was Critical 720.00 3615.67 96726.73
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 720.00 3516.34 94234.69
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1130763.00 5394385.50 137504016.50
- 17. Gross Electrical Energy Generated (MWH) 383671.00 1775176.00 45731078.00
- 18. Net Electrical Energy Generated (MWH) 368202.00 1676695.00 43376945.00
- 19. Unit Service Factor 100.00 43.87 75.74
- 20. Unit Availability Factor 100.00 43.87 75.74
- 21. Unit Capacity Factor (using MDC Net) 101.47 41.50 69.17
- 22. Unit Capacity Factor (using DER Net) 99.49 40.69 67.83
- 23. Unit Forced Outage Rate 0.00 1.71 6.74
- 24. Shutdowns scheduled over next 6 months (Type. Date and Duration of Each).
NA
- 25. If shut down at end of report period, estimated date of startup.
NA
- 26. Units in Test Status (prior to commercial operation). N/A Forecast Achieved INITIAL CRITICALITY VYDPF 0411.01 INITIAL ELECTRICITY Original COMMERCIAL OPERATION
'~ *'
i, -
AVERAGE MILY LNIT POWER LEVEL DOCKET 10. -
50-271 f _'
UNIT Vermont Yankee DATE 861210 CO WLETED BY
_G.A. Wallin TELEPIONE (802) 257-7711 MONTH: November DAY " AVERAGE DAILY POWER LEVEL mY -
AVER 4GE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 398 17 519 2
453 18 519 3
515 19 519 4
520 20 518 5
519 21 519 6
519 22 519 7
519 23 515 8
517 24 519 9
503
'25 519 10 518 26 519 11 519 27 519 12 519 28 519 13-519 29 519 14 518 30 512 15 519 31 16 516 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole mecawatt.
VYDPF 0411.02 O riginal
DOCKET 2.
50-271 UNIT f6ME V rmont Yankee.
UNIT SiUTDOWNS AND POWER REDUCTIONS
[ RTE 861210 COMPLETED BY G. A. Wallin REPORT ENTH November TELEPK)NE (802) 257-7711 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
86-10 861101 S
0.00 B,H*
4 N/A E
CONROD Power reduction for control rod Power pattern exchange and surveillance Reduction testing.
1 2
3 4
F-Forced A-Equipment Failure (Explain)
Method.
Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refuelino 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
VYDPF 0411.03 G-Operational Error (Explain)
Exhibit I - Same Source Original
- H-Other (Explain)- Control Rod Pattern Exchange e
DOCKET NJ..
50-271 UNIT Varmont Yankee (N TE 861210 COWLETED BY G.A. Wallin TELEPHONE (802) 257-7711 REPORT MONTH November SIMERY OF OPERATING EXPERIENCES Hiahlights Vermont Yankee operated at 98.6% of rated thermal power for the month.
Gross electrical generation was 383,671 MWH or 98.7% of design e
electrical capacity.
Operatino Summary, The following is a chronological description of plant operations includino other pertinent items of interest for the month:
At the beginning of the reportina period the plant was operating at 78.7% of rated thermal power.
861101 At 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />, reduced power to 76% to perform Control Rod (See Unit Shutdowns and Power exercising)and Turbine surveillance.
Reductions 861101 At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, initiated a Red Pattern Exchange at minumum recirculation flow.
861101 At 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />, completed the Rod Pattern Exchange.
861101 At 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />, a return to full power was started.
At the end of the reporting period the plant was operating at 98.5% of rated thermal power.
VYDPF 0411.04 Original
r VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR HUNT ROAD VERNON, VERMONT 05354 VYV 86-392 December 10, 1986 U. S. Nuclear Reoulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555 Dear Sire Submitted herewith is the Monthly Statistical Repo' t for the Vermont Yankee Nuclear Power Station for the month of November,1986.
Very truly yours.
VERMONT YAWEE NUCLEAR POWER CORP.
Warren. Murphy Vice President and Manager of Operations WPM / RAW /lat:MSR1.1ASR VYDFF 0411 Original 7