ML20212A133

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Oct 1986
ML20212A133
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/31/1986
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20211R016 List:
References
NUDOCS 8612220288
Download: ML20212A133 (2)


Text

,

UNIT SHUTD0lMS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME catawba 1

  • REVISION 1 DATE 12/15/86 REPORT 90 NTH october 1986 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "s_o

'5 o,y License y

Cause & Corrective eSO "e

35E g

pg Event h

p, No.

Date

%g Action to o

S Report #

hb bb Prevent Recurrence o

t

  • 14 86-10-01 S

576.00 C

4 RC FUEL.XX End of Cycle 1 Refueling Outage Continuing 15 86-10-25 S

169.00 C

4 RC RUELXX Refueling Outage Extension Due to Planned Work Requiring More Time to Couplete than Expected s

}i3 86 8612220 PDR AD PDR I

1 2

3 4

Reason:

Method:

Exhibit G - Instructions

[

A-Equipment Failure (Explain) 1-Manual for Pr ration of Data ed B-Maintenance or Test 2-Manual Scram Entry

.ts for Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (MREG-0161)

E-Operator Training 6 License Ermination F-Achainistrative 5

G-Operational Error (Explain)

Exhibit I - Same Source H-Other (Explain)

(0/77)

a CATAWBA NUCLEAR STATION NONTHLY OPERATING STATUS REPORT 1.

Personnel Exposure For the month of October, 1 individual exceeded 10 percent of their allowable annual radiation dose limit with the highest dose being 1.480 rom, which represents approximately 12.3% of that person's l

allowable annual limit.

2.

The total station liquid release for October has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for October has been compared with the Technical Specifications maximum annual dose connitment and was less than 10 percent of this limit.

-