Text
r-
.
-
'
'
JUL 2 31986
In Reply P,efer To:
Dockets:
50-313/86-15.
'
50-368/86-15
,
4
<
,
..
s,
,
,
'
~
,
,
.
.
t
'
Arkansas Power & Light. Company
ATTN:
Mr. Gene' Campbell
-
_Vice President, Nuclear
.
.0perations
P.'O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
s
This refers to the inspection conducted by Messrs. W. D. Johnson,
D. M. Hunnicutt, R. C. Stewart and C. C. Harbuck of this office during the
period May 1-31, 1986, of activities authorized by NRC Operating
Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2, and to the
discussion of our findings with Mr. J. M. Levine, and other members of your
staff at the conclusion of various segments of the inspection.
Areas examined during the inspection included operational safety verification,
maintenance, surveillance, followup on previously identified items, followup on
licensee event report, implementation of vendor operation and maintenance
recommendations, receiving inspection and procurement control, procurement
document control, and condensate storage tank construction.
Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the
inspectors.
The findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
Five unresolved items are identified in paragraph 11 of the enclosed inspection
report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
RIV:RP /
C:RPB
C:RPB #
[
MEMurph tw
DRHunter
JEGaglifdo
'
r//p /86
Q/ ((/86
7 /14/E
8607280098 860723
ADOCK 05000313
4 ,4
e
gor
. _
_ .
-
-.
-
l
,
'
Arkansas Power & Light Company
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed bys
'J. E. G AG LI ARDO"
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A -_ Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/86-15
50-368/86-15
cc w/ enclosure:
J. M. Levine, Director
Site Nuclear Operations
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas 72801
Arkansas Radiation Control Program Director
bcc to DMB (IE01)
bec distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA
- EP&RPB
- Section Chief (RP8/B)
- D. Weiss, LFMB (AR-2015)
- RIV File
E. H. Johnson, DRS&P
- D. M. Hunnicutt
- MIS SYSTEM
- RSTS Operator
- R. C. Stewart
- w/766
.