o N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 12/3/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901 j

-OPERATING STATUS

1. Unit Name D. C. Cook Unit 1
2. Reporting Period NOV 86 l notes l
3. Licensed Thermal Power (MWt) 3250 l l

4.

Name Plate Rating (Gross MWe) 1152 l l

S. Design Electrical Rating (Net MWe) 1030 l l

6. Maximum Dependable Capacity (GROSS MWe) 1056 l l

p

7. Maximum Dependable Capacity (Net MWe) 1020 -----------------------

)

8.

If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe)

10. Reasons For Restrictions. If Any:

[

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 720.0 8016.0 104448.0
12. No. of Hrs. Reactor Was Critical 698.1 6792.4 75081.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 691.6 6722.0 73574.6
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2004755 19442613 214438296
17. Gross Elect. Energy Gen. (MWH) 646100 6203490 70181030
18. Net Elect. Energy Gen. (MWH) 621007 5962516 67509673
19. Unit Service Factor 96.1 83.9 71.8
20. Unit Availability Factor 96.1 83.9 71.8
21. Unit Capacity Factor (MDC Not) 84.6 72.9 64.6
22. Unit Capacity Factor (DER Net) 83.7 72.2 62.3
23. Unit Forced Outage Rate 3.9 16.1 8.6
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 0703030082 861130 ADOCK0500gU PDH R

I

/f d(

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-315 UNIT ONE DATE 12/3/86 COMPLETED BY CLIMER TELEPHONE 616-465-5901 MONTH DEC 86 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1

901 17 913 2

904 18 912 3

903 19 911 4

908 20 915 5

900 21 913 6

903 22 28 7

902 23 360 8

908 24 908 9

909 25 919 10 909 26 916 11 911 27 918 12 911 28 916 13 912 29 916 14 912 30 915 15 910 31 0

16 914

/

R Y

i

/

J t

-e s.

N.,

N iN 50-315 N

L IMW:KEl NO. - D.C. Cook-Unit 1 llNil'Silllih0WNS AND Powl:H HliDIN'IIONS UNil' NAhf E s

DAIE 12-8-86 runsPI ETI:n ny B.A. Svensson i

HI'POH1&lDNilg November, 1986 1El.I PiloNE 616/465-5901 d

g i

.E E

}

II I icensee

[ *,

h 1, Cause & Cansetsive e.o, pO A Is.us e..

s..

n.se e.

n g

a Iss.

Psevent itecunence

$I c"c - j ;y, g Repois

  • m e

g d

257 861122 F

28.4 A

3 (Later)

HA XXXXX The unit automatically tripped from l

90% reactor power due to operation of the main turbine thrust bearing failure trip.

The. trip occurred i

concurrently with routine testing of the main turbine control valves.

I The trip occurred due to a shift in j

the thrust bearing wear detector position. The thrust bearing wear detector device position was ad-justed and the unit returned to service on 861123.

90% reactor power was reached on 861124.

i I

1 1

2

.I 4

17: I:ented Heason:

blesto.J:

I?mliilite G-Insteucci.ms S: Stheilnicil A liainipaneni I;ailuse (i.mplain) 4 -klanpal fos Picpasatiini of Data II hiaintenance of Test 2 Manual Scsans, linisy Sliccis fus Ikensee C Hefueling

.1-Anansnatic Si sans.

liven: Hepos e ll i'Ri ltilc lNilHI G-

[

i D Hegulaiosy Resisiction 4 Othes Ilimplaini 0161)

(

l' Openalos Isa6ning& thense I maminailun 12 Ailminisisalive 5

G Opesainmal 5:ssus ll!xplaint liinbis 1 - Same Sousic l

P8/17) 11 Othes Ilimplain) i

s 1

Docket No.:

50-315 Unit Names D.C. Cook Unit 1 Completed By:

D. A. Bruck Telephone:

(616) 465-5901 x

y

's (

Page:

1 of 2 Date:

December 8, 1986

\\sy s

MONTHLY OPERATING ACTIVITIES - NOVEMBER, 1986 s

HIGHLIGHTS:

1 The reporting period began with the\\ reactor.at 90% rated thermal power.

On 11-11-86, theunitinadvertentlyenteredTebhnical Specification 3.0.3 due to both engineered safety features fans being inoperablet One fan was returned to service immediately upon discovery, which removed the unit from Tech. Spec 3.0.3.

On 11-22-86, the unit, automatically' tripped due to operation of the main turbine thrust bearing failure trip.. The trip occurred concurrently with routine testing of'the main turbine control i

valves.

The trip occurred due to a; shift in the' thrust bearing wear detector position.

The thrust bearing. wear detector device position was adjusted and the unit returned to service on

'11-23-86.

\\

On 11-26-86, an unusual event was dsclared whsn both diesel i

generators became inoperable'at the same time'due to equipment problems.

The unusual event ended after'two hours when one of.

the diesels was declared operable.

s Th'e' reporting, period ended with the reactor at 90% rated thermal

-power.

Gross electrical generation for the month of November was 646,100 MWH.

Y

SUMMARY

11-11-86 At 0623, the manual inlet damper to the #1 ESF fan, HV-AES-1, was found closed.

The damper was immediately re-opened, restoring HV-AES~-lfto operable.

The #2 ESF fan, HV-AES-2, had been removed from service for maintenance at 0605; which caused 1the unit to be in Technical Specification 3.0.3 stat'ement from 0605 to 0623.

t l-I i

L N

.nn s

Docket No.:

50-315 Unit Name D.C. Cook Unit 1 Completed By:

D. A.

Bruck Telephone:

(616) 465-5901 Date:

December 8, 1986 Page:

2 of 2 11-22-86 At 0046, the unit automatically tripped due to operation of the main turbine thrust bearing failure trip.

The trip occurred concurrently with routine testing of the main turbine control valves.

The trip occurred due to a shift in the thrust bearing wear detector position.

The thrust bearing wear detector device position was adjusted and the unit returned to service on 11-23-86.

All essential equipment operated per design.

At 2240, the reactor was taken critical.

11-23-86 At 0312, the reactor entered Mode 1.

At 0513, the gene *ator was paralleled to the grid.

At 1100, the reactor power increase was stopped at 48%

for a chemistry hold.

At 1707, the reactor power increase to 80% began at 6%/hr.

11-24-86 At 0038, a reactor power increase to 90% began, reaching 90% at 0310.

11-26-86 At 0331, the AB Diesel Generator was declared inoperable when it failed to achieve required output voltage during surveillance testing.

At 1701, the CD Diesel Generator was declared inoperable when it restarted by itself after being shutdown.

At 1707, an unusual event was declared because both l

diesel generators were inoperable.

At 1900, the unusual events was terminated when the AB diesel generator was declared operable.

A relay was found loose on a circuit board in the AB Diesel l

Generator local control panel.

l l

11-27-86 At 0435, the CD Diesel Generator was declared operable.

The solenoid on one of the starting air valves was l

found to have failed, causing that starting air valve to open, which resulted in the diesel restarting.

l l

l

r e

DOCKET NO.

50 - 315 UNIT NAME D. C. Cook - Unit No. 1 DATE 12-8-86 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE NOVEMBER, 1986 There were no significant Safety-Related Maintenance Items during the month of November.

L;6;.ana a wcma weinc_caear Donald C. Cook Nuclear Plant P.O. Box 458, Brgsgman, Mu;higan 49106 December 5, 1986 Director, Office Of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear plant Unit 1 Technical Specification 6.9.1.6, the attached Monthly Operating Report for the Month of November, 1986 is submitted.

Sincerely, l

W. G. Smith, Jr.

Plant Manager WGS:ab Attachments cc:

J. E. Dolan M. P. Alexich R. W. Jurgensen NRC Region III B. L. Jorgensen R. O. Bruggee R. C. Callen S. J. Mierzwa C. A. Erikson D. W. Paul D. R. Hahn Z.

Cordero J. J. Markowsky E. A. Morse PNSRC File INP0 Records Center ANI Nuclear Engineering Department

[

,g

.