DEC 161986 Docket No. 50-409 Dairyland Power Cooperative ATTN: Mr. J. W. Taylor General Manager 2615 East Avenue - South La Crosse, WI 54601 Gentlemen:
SUBJECT:
EQUIPMENT QUALIFICATION INSPECTION - LACROSSE BOILING WATER REACTOR This letter confirms the dates of January 5-9, 1987, for the NRC Environmental Qualification (EQ) Inspection of electrical and instrumentation equipment, at the Lacrosse Boiling Water Reactor. These dates were established during a December 15, 1986, telephone conversation between Mr. B. Brimer of your staff and Mr. A. S. Gautam of my staff. The inspection will be performed by a six member inspection team with Mr. A. S. Gautam of the Region III office as lead inspector.
The following areas will be inspected:
1.
Implementation of corrective action conmitments addressed in the final LACBWR EQ Safety Evaluation Report.
2.
Compliance to EQ regulations of 10 CFR 50.49, including Program Procedures, Master Equipment List, Maintenance, Procurement, Upgrading of Replacement Equipment, Quality Assurance and Employee Training.
3.
Adequacy of equipment qualification files, including responses to relevant NRC Information Notices and Bulletins.
4.
Installation and maintenance of selected plant EQ equipment.
A ranagement entrance meeting is scheduled for 1:00 p.m. on January 5, 1987, at the plant site. A plant walkdown inspection of selected EQ equipment is scheduled for January 7,1987, and an NRC exit meeting is scheduled for 11:00 a.m. on January 9,1987. To facilitate NRC preparation for this inspection, Mr. Brimer of your staff has been requested to submit the following LACBWR EQ documents no later than Updated Master Equipment List for items within the scope of 10 CFR 50.49.
Procedures addressing your implementation of the 10 CFR 50.49 program.
EQ responses relevant to the final LACBWR EQ SER.
Latest QA audit report on EQ activities.
I 8612190204 861216 PDR ADOCK 05000409 O
' ?
IEdt 5'
Dairyland Power Cooperative 2
DEC 161986 Your cooperation with us during this inspection will be appreciated. Should you have any questions regarding this insp(ection, please contact Mr. J. W. Muffett at(312)790-5763 or Mr. A. S. Gautam at 312)790-5523.
Sincerely, Carl J. Pap lo, Director Division of Reactor Safety cc:
J. Parkyn, Plant Superintendent DCS/RSB(RIDS)
Licensing Fee Management Branch Resident Inspector, RIII John Stang, NRR John J. Duffy, Chief Boiler Section Mary Lou Munts, Chairperson Wisconsin Public Service Connission Spark Burmaster, Coulee Region Energy Coalition ColletteBlum-Meister(SLO),
WI Div. of Energency Government R
I