ML20211Q041

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1986
ML20211Q041
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/30/1986
From: Elms A, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
MP-9785, NUDOCS 8703020474
Download: ML20211Q041 (4)


Text

,

9 e

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE December 4,1986 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 MONTH' November DAY.

AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1,131 17 1,143 2

1,129-18 1,135 3

1,130 19 1,144 4

1,132 20 1,139 5

1,131 21 1,141 6

1,133 22 1,134 7

1,131 23 1,137 8

1,081 24 1,140 9

1,135 25 1,137 l

l 10 1,140 26 1,137 l

11 1,136 27 1,143 l

l 12 1,135 28 1,132 l

13

-1,138 29 1,142 14 1,139 30 1,131 15 1,134 31 l

16 1,139 l

l D

AD PD b 4

/p 4

(

i

.O o

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE December 4, 1986 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 REPORT MONTH November 1986 Method of Licensee Cause & Corrective Duration Shutting Event System _

Component Action to No.

Date Type (1) (Hours)

Reason (2)

Down Reactor (3) Report #

Code Code Prevent Recurrence N:na 1

2 3

4

-F:

Forced

-Reason:

-Method:

-Exhibit G - Instructions S:

Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from-(LER) File (NUREG-0161)

E - Operator Training & License previous month Examination 5 - Power Reduction 5 F - Administrative (Duration = 0)

Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)

H - Other (Explain)

p, 6 UTILITIES senemi Omces. seiden street, Berlin, Connecticut 1

Os'eY r: Sinc 5" P.O. BOX 270

[l(('[,372,"," ",,

HARTFORD CONNECTICUT 06141-0270 L

L J

(203) 665-5000 December 8, 1986 MP-9785 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 86-12 covering operations for the month of November is hereby forwarded.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY

, &f1Rf h 1M-Stephen E. Scace Station Superintendent Millstone Nuclear Power Station SES/AE:sb Attachment cc:

Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D.C. (10)

U. S. Nuclear Regulatory Co.niission, c/o Document Management Branch, Washington, D. C. 20555

1

              • NRC OPERATIN6 STATUS REPORT COMPLETED BY REACTOR EN6INEERING *******
1. DOCKET.... 50-423 OPERATING STATUS
2. REPORTING PERIOD... NOVEMBER 1986 00TA6E + ONLINE HOURS.. 0

+ 720

= 720

3. UTILITY CONTACT.................A. L. ELMS 203-444-5388 4.

LICENSED THERMAL P0NER.........................................

3411

  • MILLSTONE
  • l
5. N AMEPLA TE RATI NG (GROSS ME)................................... 1,253 M e UNIT 3
6. DESIGN ELECTRICAL RATIN6 (NET ME)............................. 1153.61
7. MAIIMUM DEPENDABLE CAPACITY (6ROSSME)........................

1197

8. MAllMUM DEPENDABLE CAPACITY (NETME)...........................

1149.35 9.

IF CHAN6ES OCCUR ABOVE SINCE LAST REPORT, REASONSARE...........

N/A

10. PONER LEVEL TO NHICH RESTRICTED, IF ANY (NET ME)...............N/A
11. REASON FOR RESTRICTION, IF ANY....N/A MONTH YEAR TO DATE CUMULATIVE TO DATE 33333 333333333333 333333333333333333
12. HOURS IN REPORTING PERIOD 720.0 5328.0 5328.0
13. NUMBER OF HOURS THE REACTOR NAS CRITICAL 720.0 4668.8 4668.8
14. REACTOR RESERVE SHUTDONN HOURS 0.0 83.2 83.2
15. HOURS BEhERATOR ONLINE 720.0 4611.9 4611.9
16. UNIT RESERVE SHUTDONN HOURS 0.0 0.0 0.0
17. 6ROSS THERMAL ENER6Y SENERATED (M H) 2451178.0 15207270.2 15207270.2
18. 6ROSS ELECTRICAL ENER6Y 6ENERATED (M H) 850837.5 5247804.0 5247804.0
19. NET ELECTRICAL ENER6Y 6ENERATED (MWH1 816661.0 5012526.5 5012526.5
20. UNIT SERVICE FACTOR 100.0 86.6 86.6
21. UNIT AVAILABILITY FACTOR 100.0 86.6 86.6
22. UNIT CAPACITY FACTOR (USINS MDC NET) 98.7 81.9 61.9
23. UNIT CAPACITY FACTOR (USING DER NET) 98.3 81.6 81.6
24. UNIT FORCED OUTA6E RATE 0.0 13.4 13.4
25. UNIT FORCED OUTA6E HOURS 0.0 716.1 716.1 CMITDONNS SchiDULED DVER NEIT S!! MONTHS (TYPE, DATE, AND DURATION OF EACH)..............

February 1987 IF CURRENTLY SHUTCONN, ESilMATED STARTUP DATE......N/A