-I-OPERATING DATA REPORT DOCKET NO.
50-244 DATE December 12. 1986 COMPLETED BY db Andrew E. ftNamara TELEPHONE 315-524-4446 Ext. 301 4
OPERATING STATUS Ginna Station
- l. Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Notes
- 2. Reporting Period:
h r-19M 1520 The unit operated at 100%
- 3. Licensed Thermal Power (MWt):
490 W hl for W mpod
- 4. Nameplate Rating (Gross MWe):
period with two exceptions i
470
- 5. Des gn Electrical Rating (Net MWe):
detailed on pages 3 and 4.
490
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
470
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, if Any (Net MWe):
- 10. Reasons For Restrictions, if Any:
This Month Yr. to Date Cumulative 720 8,016 149,136.00
- 11. Ilours In Reporting Period
- 12. Number of flours Reactor Was Critical 712.3 6,972.8 115,259.97 0
0 1.687.55*
- 13. Reactor Reserve Shutdown llours 708 6.915.75 112.940.38
- 14. Ilours Generator On-Line 0
0 8J*
- 15. Unit Reserve Shutdown llours 1,040,304 10.206.264 157.928.889 l
- 16. Gross Thermal Energy Generated (MWil)
- 17. Gross Electrical Energy Generated (MWil) 350,093 3,416,802 51,709,658
- 18. Net Electrical Energy Generated (MWil) 333.154 3.249.379 49.052.696 l
- 19. Unit Service Factor 98.33%
86.27%
75.73%
98.33%
86.27%
75.74%
- 20. Unit Availability Factor 98.45%
86.25%
71.52%
- 21. Unit Capacity Factor (Using MDC Net) 98.45%
86.25%
71.52%
- 22. Unit Capacity Factor (Using DER Net) 1.67%
145%
6.98%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
l February 7,1987 - Annual Refuelina and Maintenance f
- 25. If Shur Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved
(
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Cumulative Total. Comencing January 1,1975,
8703020405 861130
- D
\\
PDR ADOCK 05000244 R
\\
I
-2 AVERAGE DAILY UNIT POWER LEVEL 1
DOCKET NO.
50-244 UNIT R.E.
Ginna Nuclear Power Plant DATE December 12. 1986 COMPLETED BY 6xLf F. 3WPTd " e w Andrew E. M~Namara c
TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH November. 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
489 17.
490 2.
490 18.
491 3.
490 19.
490 4.
490 20.
490 5.
490 21.
491 6.
490 22.
490 7.
490 23.
484 8.
490 24.
487 9.
490 25.
489 10.
490 26.
490 11.
490 27.
490 12.
490 28.
460*
13.
490 29.
119 l
14.
489 30.
313 15.
490 31.
l 16.
491
- 0n-line Net INSTRUCTIONS i
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
IMX:Kl{T NO.
50-244 UNIT NAME R.E. f"'NNA NUCLEAR POWER PLANT
- UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETliD llY Alr-E. M DATE er 19 -
Andrew E. McNamara REPORT MONTil 10VEMBER TELEPilONE 315-524-4446 Ext. 301 Ginna Station m
1,*R Eq o
Licensee e,
e Cause & Corrective e
No.
Date 1
iE 2
Event J! e 14 Action to I
g
,5 $
,I i $ ",
Report #
M
!d Prevent Recurrence 2
g u
O 86-5*
11/28/86 F
12 G
3 86-011 CD VALVEX Automatic reactor trip due to operator inadvertently closing the main stean isolation valves.
This caused a reactor trip on high pressurizer pressure.
4 1
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 E
uv. 43s 4s.es II-Other (Explain)
Exhibit 1 - Same Source
- Yearly Outage Nunber
4
_4 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE i
DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE December 12, 1986 COMPLETED BY h F. Af':f1" eh Andrew E. MbNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH November, 1986 The unit operated at 100% reactor power level for the majority of the report period with two exceptions, as follows:
On 11/19 the reactor power level was reduced to - 98% to perform a Periodic Flow Test on the Auxiliary Feedwater System.
On 11/28 a forced outage occurred due to an operator inadver-tently closing the main steam isolation valves.
This caused a reactor trip on high pressurizer pressure.
l l
I I
GINNA STATION MAINTENANCE REPORT
SUMMARY
NOVEMBER, 1986 During the month of November, routine maintenance and inspections were completed.
Major safety related work included:
a.
M-40 Snubber Inspection (monthly) b.
1-A&B Emergency Diesel Generator - Appendix "R" c.
Security Diesel - P.M. Inspection d.
Tech. Support Diesel - P.M. Inspection e.
Diesel Fire Pump - Repair and P.M. Inspection f.
"B" Service Water Pump - P.M. Inspection l
I l
l
R:
EA ROCHESTER GAS AND ELECTRIC CORPORATION e 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 ROGER W. KGBER LEC C&
EAM P%DUCTKW a=EaCODE e 546 2700 GINNA STATION December 12, 1986 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555
Subject:
Monthly Report for November, 1986 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Gir.na Station for the month of November, 1986.
V truly yours, Y
3 Roger W. Kober RWK/eeh Attachments cc: