DEC 161996
,
.
Docket No. 50-295
Docket No. 50-304
Comonwealth Edison Company.
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, Illinois 60690
Gentlemen:
This refers to the safety inspection conducted by Mr. P. Cortland of the Office
of Inspection and Enforcement on September 29 through October 3, 1986 at the
Zion Nuclear Power Station, Units 1 and 2 and review of additional information
provided by the licensee through November 7, 1986. This inspection covered the
low temperature overpressurization protection system at Zion Units 1 and 2
authorized by NRC Operating Licenses Nos. DPR-39 and DPR-48, respectively. The
findings were discussed with Mr. G. Plimi and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during the
inspection. The inspection consisted of selective examinations of procedures
and representative records, design packages, interviews with personnel, and
observation of activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC Public
Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
b\\
Edward L. Jordan, Director
Division of Emergency Preparedness
'
,
and Engineering Response
Office of Inspection and Enforcement
Enclosure:
Inspection Report Nos.
50-295/86024(DRSS)
8612190036 861216
and 50-304/86023(DRSS)
ADOOK 05000295
O
cc: See page 2
DISTRIBUTION: See page 3
00/I h
/ O;k
., E
.lE
- SEE PREVIOUS CONCURRENCES
W rt'z
J rdan
12/5 186
/12/cf/86
3
- EGCB:DEPER:IE *EGCB:DEPER:IE *RIII
- RIIT
- C:EGCB:DEPER:IE
PCortland
AWDromerick
BLBurgess WGGuldemond RLBaer
11/25/86
12/1/86
12/3/86
12/3/86
12/8/86
. - _ -
- _ . . -
. .-
. - .
-
- -
-
.
.
Docket No. 50-295
Docket No. 50-304
'Connonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, Illinois 60690
Gentlemen:
This refers to the safety inspection conducted by Mr. P. Cortland of the Office
of Inspection and Enforcement on September 29 through November 7, 1986 of
activities regarding the low temperature overpressurization protection system
at Zion Nuclear Power Station, Units 1 and 2 authorized by NRC Operating
Licenses Nos. DPR-39 and DPR-48, respectively, and to the discussion of our
findings with Mr. G. Plimi and others of your staff at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during the
inspection. The inspection consisted of selective examinations of procedures
and representative records, design packages, interviews with personnel, and
observation of activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC Public
Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Edward L. Jordan, Director
Division of Emergency Preparedness
and Engineering Response
Office of Inspection and Enforcement
Enclosure:
Inspection Report
Nos. 50-295/86024(DRSS)
and 50-304/86023(DRSS)
See Attached Distribution
DD:DEPER:IE D:DEPER:IE
SASchwartz
ELJordan
12/ /86
12/ /86
EGCB
M:IE ($hil
R:IE R
RII
C:EG[h'KPER:IE
PCo
@n
hWDrbmerick
BL
ess WGG
emond RLB4er
[
11
/85
17///86
12/g/86
12/J!,/86
12/c /86
!
.
.
Commonwealth Edison Company
-2-
cc:
D. L. Farrar, Director
of Nuclear Licensing
G. J. Plim1, Station Manager
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
Mayor, City of Zion
.
i
?
m
9
.
Comonwealth Edison Company
-3-
DISTRIBUTION w/ enclosure:
JMTaylor. ,
RWStarostecki
ELJordan
SASchwartz
RLBaer
AWDromerick
PCortland
JGPartlow
BKGrimes
RFHeishman
'JAAxelrad
CENorelius, RIII
"
WGGuldemond, RIII
BLBurgess, RIII
PDR f.,
Y:QRW7 %
DEPER R/F
EGCB R/F
PCortland R/F
Jan Norris, Project Manager, NRR
DCS/RSB/(RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
i
J
i .
i
!
.
__