. _ _ _ _ _ _ _ _ _ _ _

@ CSRSMES Power NUCLEAR OPERATIONS DEPARTMENT s

Unit Shutdowns and Power Reductions Report Month Docket Nurnber Unit Date Completed by Telephone Is Movember 1986 50-155 Big Rock Point December 1.1986 MJ Bielinski L616)547-6537 x228 Method of Ghutting Duration Down Licensee Event System Comporynt I

4 Nu p _

Date Type (Hourst Reason Reactor Report Number Code Code

  • Cause and Corrective Action To Prevent Recurrence 86-06 11/24/86 1

14.5 A

4 None Derate - Power was reduced to allow repair of VP-13 (manual isolation valve) packing leak. Leak was repaired anc unit returned to full power 11/24/86.

s I

2 3

4 F = Forced Reason:

Method:

Exhibit G = Instructions fos S = Scheduled A = Equipment Failure (Explain) 1 = Manual Preperation of Data Entry Sheets B = Maintenance of Test 2 = Manual Scram for Licensee Event Report (LER)

C = Refueling 3 = Automatic Scram File (NUREG-0161)

D = Regulatory Restriction 4 = Other (Explain)

E = Operator Training and License Examination 5Exhibit i = Same Source Q

F = Administrative G = Operational Error (Explain) 8703020283 861130

~

H = Other (Explain)

DR ADOCK 05000155 POR Foem 3156 1-82

r-DOCKET NO.53-155 DATE:

1 / 12 / 86 I

BY: 11 JOHNITON OPERATING ITI.TUI PHONE:

616-5G7-G537. EXT 100

1. UNIT NAME; BIG ROCK POINT NUCLEAR PLANT NOTEI:

I

2. REPORTING PERI!D:

11 / CS

3. LICENIED THERMAL POWER (MWT):

240

~

4. CAMEPLATE RATING (GROII MWE):

75

^/

C ',

  • d I
5. DESIGN ELECTRICAL RATING (HET MWE):

72

6. MAXIMUM DEPENDABLE CAPACITY (GROSI MWE):

73.0

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

49.0 I

O.

IF CHANGEI OCCUR IN CAPACITY RATINGI(ITEMI 3 THRU 7) IINCE LAIT REPORT, GIVE REAIONS:

9. POWER LEVEL TO WHICH REITRICTED,IF ANY (NET MWE):

0.0 I

1@. REASONS FOR REITRICTIONI. IF ANY: DN 09/29/86 COMMENCED COAITDOWN WITH 'ALL RODI - ALL DUT'.

PLANNED REFUELING OUTAGE ITARTING JANUARY 2, 1987 FOR ABOUT 50-60 DAVI.

I 1

If IHIS MONTH YEAR-TO-DATE CUMULATIVE

11. HOURI IN REPORTING PERIOD 720.0 8016.0 207547.0
12. HUMBER OF HOURI REACTOR WAS CRITICAL 720.0 7643.3 148075.1 I.
13. REACTOR REIERVE IHUTDOWN HOURI 0.0 0.0 0.0

}

14. HOURI uENERATOR ON-LINE 720.0 7617.7 146257.7
15. UNI) RESERVE IHUTDOWN HOURI 0.0 0.0 0.0 I,
14. GROSI THERMAL ENERGY GENERATED (MWH) 118595.0 1549192.0 27594463.0
17. GROIS ELECTRICAL ENERGY GENERATED (MWH) 39108.0 498640.0 8739827.0 t@. NET ELECTRICAL ENERGY GENERATED (MWH) 36772.3 472420.3 8264592.5 I

l?. UNIT IERVICE FACTOR 100.0%

95.0%

70.5%

23. UNIT AVAILABILITY FACTOR 100.0%

95.0%

70.5%

21. UNIT CAPACITY FACTOR (USING MDC NET) 74.0%

85.4%

59.2%

D

22. UNIT CAPACITY FACTOR (USING DER NET) 70.9%

81.9%

55.3%

23. UNIT FORCED OUTAGE RATE 0.0%

5.0%

14.3%

23. IHUTDOWNI ICHEDULED OVER NEXT 6 MONTHI(TYPE.DATE. & DURATION OF EACH):

9

25. IF IHUT DOWN AT END OF REPORT PERIOD. EITIMATED DATE OF ITARTUP:

)

D D

8 I

B B

4I I

DAY AVERAGE DAILY POWER (MWT)

(MWEN)

(11/86) i 176.25 54.75 2

175.12 54.50 3

174.17 54.20 4

173.79 54.05 5

172.96 53.75 6

172.37 53.64 7

172.33 53.38 8

170.71 53.23 9

170.37 52.93 10 169.87 52.68 11 169.17 52.39 12 168.37 52.30 13 166.21 52.00 14 166.71 51.85 15 168.17 51.73 16 163.29 51.53 17 165.37 51.23 18 165.17 50.90 19 162.62 50.74 20 164.04 50.54 21 162.58 50.22 22 160.75 50.06 23 160.37 49.81 24 119.87 34.95 25 162.67 50.42 26 159.04 49.22 27 158.21 49.15 28 157.29 48.91 29 156.58 48.70 30 157.00 48.41 r

,,wr r

l.

Refueling Information Request 1.

Facility name: Big Rock Point Plant 2.

Scheduled date for next refueling shutdown: January 2, 1987 3.

Scheduled date for restart following shutdown: February 20, 1987 4.

Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?

No If yes, explain:

If no, has the reload fuel design and core configuration been reviewed by Plant Safety Review Committee to determine whether any unreviewed safety questions as associated with the core reload (Reference 10 CFR, Section 50.59)? No If no review has taken place, when is it scheduled?

5.

Scheduled date(s) for submittal of proposed licensing action and supporting information:

6.

Important licensing considerations associated with refueling, eg, new or dif ferent fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design new operating procedures:

7.

Number of fuel assemblies in: core 84; spent fuel storage pool 192.

8.

Present licensed spent fuel storage capacity: 441 Size of any increase in licensed storage capacity that has been requested or is planned (in number of fuel assemblies):

9.

Projected date of last refueling that can be discharged to spent fuel pool assuming the present license capacity:

1995 MIO886-0993-BT01 1

l

?

l Consumers POW 8f ornon -

a-' s* *~~>

Company Big Rock Point Nuclear Plant, Box 591, Route 3, Charlevoix, MI 49720 December 1, 1986 Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

Enclosed please find the statistical data for the Big Rock Point Nuclear Plant covering the period November 1, 1986 through Novenber 30, 1986.

Sincerely, OM N

pgs1GliATED 277 D P Hoffman Cortined 37 Plant Superintendent Enclosures cc: DEVanFarove, Department of Public Health RCallen, Michigan Public Service Commission Michigan Department of Labor INPO Record Center Resident NRC Inspector, Site Document Control, Big Rock Point, 740*22*35*10 FWBuckman, P24-117B KWBerry, P24-614B File MIO10-0667A-BT01