ML20211N993

From kanterella
Jump to navigation Jump to search

Forwards SER for Generic Ltr 83-28,Item 4.5.1, Generic Implications of Salem ATWS Event. TAC 59172 Closed.Salp Input Also Encl
ML20211N993
Person / Time
Site: Palo Verde  
Issue date: 07/03/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML20211N997 List:
References
GL-83-28, TAC-59172, NUDOCS 8607110173
Download: ML20211N993 (3)


Text

....

2 ML3 1986 i

MEMORANDUM FOR:

Frank J. Miraglia, Jr., Director

?

Division of Pressurized Water Reactor j

Licensing-B FROM:

Dennis F. Kirsch, Director Division of Reactor Safety and Projects i

l

SUBJECT:

REGION V SAFETY EVALUATION REPCRT FOR PALO VERDE NUCLEAR GENERATING STATION i

GENERIC LETTER 83-28, ITEM 4.5.1 1

TAC NO. 59172 f

Plant Name:

Palo Verde Units 1, 2,'& 3 1

j Docket Number:

50-528, 529 & 530 l

Responsible Directorate:

PWR Project Directorate No. 7 f

Project Manager:

M. Licitra i

Review Status:

Complete E

i Enclosed is the Region V Safety Evaluation Report addressing the subject j

licensing action.

Inasmuch as this action has been completed TAC Number 59172 taay be closed.

We have also enclosed the SALP input requested by NRR Office Letter Number 44.

If you have any questions regarding this SER, please contact Jerry Zwetzig at FTS 463-3749.

1 Dennis F. Kirsch, Director Division of Reactor Safety and Projects l!

Enclosures:

As Stated 4

cc:

i M. Licitra, NRR G. Knighton, NRR R. Emch, NRR l

J. Stevens, NRR R. Zimmerman, RV i

L. Miller, RV 71 g ] $OO I

A. Hon, RV 2B j

R. Pate, RV PDR l

p G. Zwetzig, RV i

VIA 5520: Division of PWR Licensing-B, NRR, Attn:

M. Licitra ID: Palo Verde TAC No. 59172 l

bec w/ enclosures:

J. Martin, B. Faulkenberry, RSB/ Document Control Desk (RIDS)

PATEIV KIRSCWY IG4 6/;tI/86

.4/-/G0 X,/ /86 l20)

~

i

?Pl%

1 t

--. - n l'

"#(Vtioqg UNITED STATES

[

p, NUCLEAR REGULATORY COMMISSION 5

j REGION V 6

,4 1450 MARIA LANE, SUITE 210 9..... /,

WALNUT CREEK, CALIFORNI A 94596 JUL 3 1986 MEMORANDUM FOR:

Frank J. Miraglia, Jr., Director Division of Pressurized Water Reactor Licensing-B FROM:

Dennis F. Kirsch, Director Division of Reactor Safety and Projects

SUBJECT:

REGION V SAFETY EVALUATION REPORT FOR PALO VERDE NUCLEAR GENERATING STATION GENERIC LETTER 83-28 ITEM 4.5.1 TAC NO. 59172 Plant Name:

Palo Verde Units 1, 2, & 3 Docket Number:

50-528, 529 & 530 Responsible Directorate:

PWR Project Directorate No. 7 Project Manager:

M. Licitra Review Status:

Complete j

Enclosed is the Region V Safety Evaluation Report addressing the subject licensing action. Inasmuch as this action has been completed, TAC Number 59172 may be closed.

We have also enclosed the SALP input requested by NRR Office Letter Number 44.

If you have any questions regarding this SER, please contact Jerry Zwetzig at FTS 463-3749.

,r

, fs i

Dennis F. Kirsch, Director Division of Reactor Safety and Projects

Enclosures:

As Stated cc:

M. Licitra NRR G. Knighton, NRR R. Emch, NRR J. Stevens, NRR R. Zimmerman, RV L. Miller, RV A. Hon, RV R. Pate, RV G. Zwetzig, RV VIA 5520: Division of PWR Licensing-B, NRR, Attn:

M. Licitra ID: Palo Verde TAC No. 59172

w 1

SALP INPUT FOR COMPLETED SER 1

Organization Preparing SALP Input: Region V Facility: Palo Verde Docket Nos.: 50-528, 50-529 & 50-530 Phase: -Operating SER

Subject:

Generic Letter 83-28, Item 4.5.1 TAC No.:

59172 I

i I

FUNCTIONAL AREA: Licensing Activities

[

Evaluation Criteria:

1 1.

Management Involvement in Assuring Quality i

The licensee's submittal reflected a management program where activities affecting quality were adequately controlled.

Rating: Category 2 2.

Approach to Resolution of Technical Issues from a Safety Standpoint The licensee's addressed this item by committing to the provisions of the standard technical specifications - which do not directly address this issue. The final resolution, however, was satisfactory.

Rating: Category 2 1

3.

Responsiveness to NRC Initiatives l

As noted above, the licensee did not directly address the issue, but l

committed instead to the standard technical specifications - which j

do not directly address the issue.

i Rating: Category 2 l

s' i

4.

Reporting and Analysis of Reportable Events

}

}

Not observed j

]

Rating: None i

l S.

Staffing (Including Management) l Not observed i

Rating: None 6.

Training and Qualification Effectiveness 1

Based on the failure of the licensee to respond directly to the l

regulatory guidance, we conclude the training and qualifications of the responsible individuals was marginal at the time of the submittal, i

j Rating: Category 3 1