Wiliiom B. Denickson Senior Vice President Nuc! ear Er'ergy Pub 5c Service of New HampeNro N w Hampshire Yankee Division July 3, 1986 SBN-1152 T.F.
B7.0.0, B7.1.7 1
United States Nuclear Regulatory Commission Washington, DC 20555 Attention:
Mr. H. R. Denton, Director Nuclear Reactor Regulation f
References:
(a) Construction Permit CPPR-135, Docket No. 50-443 (b) USNRC Letter dated May 20, 1985, "Seabrook Station Technical Specification Improvement Program", T. M.
Novak to R. J. Harrison 2
Subj ect:
Request for Issuance of an Operating License; Seabrook Station Unit 1
Dear Sir:
Public Service Company of New Hampshire (PSNH) on behalf of itself and the other joint Owners with this letter certify that the design, con-struction, and preoperational testing of Seabrook Station Unit 1 is essentially complete. The following summarizes the key issues and re-maining activities bearing on the issuance of the Seabrook Station Opera-ting License.
The Final Safety Analysis Report and other licensing documents and letters submitted to the NRC provide an accurate description of the constructed plant and the organization and administration, except for future activities specifically noted in those documents or herein.
Inherent in this statement is the acknowledgement of the normal update process which translates current construction documents into submittals to the NRC, e.g., design drawings to FSAR figures.
8607110157 860703 PDR ADOCK 05000443 A
PDR P.O. Box 300 Seabrook.NHO3874 Telephone (603)474-9521
United States Nuclear Ragulatory Commission Attention:
Mr. H. R. Denton Page 2 As indicated above, the design and construction of Seabrook Station Unit 1 is essentially complete and a relatively small number of items remain to be completed. In this regard, the Seabrook Station has es-t ablished a corporate-wide program, the Seabrook Project Completion Program (SCP), to identify, prioritize, and assure completion of any remaining engineering and construction activities. Under this program any incomplete or outstanding item is reviewed and classified so as to identify restraints to plant operational modes. All outstanding items identified as being an item required for coreload will be closed out or dispositioned prior to fuel load. Similarly, any items identified as a restraint to Operational Modes 5 through I will be closed out or disposi-tioned before entering the restrained mode.
The preoperational test program at Seabrook Station is substantially complete. At this time, we anticipate that only 5 preoperational tests, required for coreload, will not be performed prior to the expected issuance of the Operating License. These tests have been identified and discussed with the NRC Resident Inspector.
To the best of my knowledge, the above paragraphs address the major activities which bear on your issuance of the Seabrook Station, Unit 1 Operating License. Because of the uncertainty associated with the date for issuance of the Atomic Safety and Licensing Board's partial initial accisien, we have scheduled a number of the remaining coreload activities to be completed by July 20, 1986. We therefore respectfully request that the Operating License be issued on or about July 20, 1986 in order that fuel load and initial startup testing may proceed as planned.
Very truly yours, William B. Derrickson Enclosures cc: Atomic Safety and Licensing Board Service List Dr. T. E. Murley, Regional Administrator United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, PA 19406
United States Nuclear Regulatory Commission 4
Attention:
Mr. H. R. Denton Page 3 STATE OF NEW HAMPSHIRE Rockingham, ss.
July 3, 1986 Then personally appeared before me, the above-named William B.
Derrickson, being duly sworn, did state that he is Senior Vice President of Public Service Company of New Hampshire, that he is duly authorized to execute and file the foregoing information in the name and on the behalf of Public Service Company of New Hampshire, and that the statements there-in are true to the best of his knowledge and belief.
k$tanu Beverly Sid oway, Notary P lic 2,c My Commission Expires:
Ma c 6, 1990-i j
i l
l l
Disna Curran, Esquire Pater J. Mathawa, Mayor Harmon & Ljaies,
City Hall 2001 S. Street, N.W.
Nswburyport, MA 01950 Suite 430 Washington, D.C.
20009 Judith H. Mizner Silvergate, Gertner, Baker, Sherwin E. Turk, Esq.
Fine, Good & Mizner Office of the Executive Legal Director 88 Broad Street U.S. Nuclear Regulatory Commission Boston, MA 02110 Tenth Floor Washington, DC 20555 Calvin A. Canney City Manager Robert A. Backus, Esquire City Hall l
116 Lowell Street 126 Daniel Street P.O. Box 516 Portsmouth, NH 03801 Manchester, NH 03105 Stephen E. Merrill, Esquire Philip Ahrens, Esquire Attorney General Assistant Attorney General George Dana Bisbee, Esquire Department of The Attorney General Assistant Attorney General Statehouse Station #6 Office of the Attorney General Augusta, ME 04333 25 Japitol Street Concord, NH 03301-6397 Mrs. Sandra Gavutis Chairman, Board of Selectmen Mr. J. P. Nadeau RFD 1 - Box 1154 Selectmen's Office Kennsington, NH 03827 10 Central Road Rye, NH 03870 Carol S. Sneider, Esquire i
Assistant Attorney General Mr. Angie Machiros Department of the Attorney General Chairman of the Board of Selectmen One Ashburton Place,19th Floor Town of Newbury Boston, MA 02108 Newbury, MA 01950 Senator Gordon J. Humphrey Mr. William S. Lord U.S. Senate Board of Selectmen Washington, DC 20510 Town Hall - Friend Street (ATTN: Tom Burack)
Amesbury, MA 01913 Richard A. Hampe, Eng.
Senator Gordon J. Humphrey Hampe and McNicholas 1 Pillsbury Street 35 Pleasant Street Concord, NH 03301 Concord, NH 03301 (ATTN: Herb Boyntou)
Thomas F. Powers, III H. Joseph Flynn, Esquire Town Manager Office of General Counsel Town of Exeter Federal Emergency Management Agency 10 Front Street 500 C Street, SW Exeter, NH 03833 Washington, DC 20472 Brentwood Board of Selectmen Paul McEachern, Esquire RFD Dalton Road Matthew T. Brock, Esquire Brentwood, NH 03833 Shaines & McEachern 25 Maplewood Avenue Gary W. Holmes, Esq.
P.O. Box 360 Holmes & Ells Portsmouth, NH 03801 47 Winnacunnet Road Hampton, NH 03842 Robert Carrigg Town Office Mr. Ed Thomas Atlantic Avenue FEMA Region 1 North Hampton, NH 03862 3
442 John W. McCormack PO & Courthouse Boston, MA 02109
/.dainistrative Judge Helen Hoyt, Chairperson Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 4
Administrstive Judge Sheldon J. Wolfe, Chairman Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Eameth A. Luebke Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Jerry Harbour
]