ML20211N233
| ML20211N233 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/10/1997 |
| From: | Mccoy C SOUTHERN NUCLEAR OPERATING CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20211N239 | List: |
| References | |
| LCV-0849-J, LCV-849-J, NUDOCS 9710160063 | |
| Download: ML20211N233 (1) | |
Text
C. K. McCoy southern Nuclent Vee hesidunt Operatirig Company. inc.
Vogtle hopct 40 inverness Center Parkway PO Box 1295 Dirrningharn. Alabarna 35201 Tel20$ 932 7122 f ax 235932 0403 October 10, 1997 SOUTHERN Docket Nos. 50 424 COMM 50-425 y,,,,,,, S,,,, y,,, ny.
U. S. Nuclear Regulatory Commission LCV 0849.J ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT REQUEST TO REVISE TECIINICAL SPECIFICATIONS CREDIT FOR BORON AND ENRICilhiENT INCREASE FOR FUEL STORAGE TYPED PAGES Southern Nuclear letter LCV-0849 E requested changes to the Vogtle Electric Generating Plant Units 1 and 2 technical specifications. Enclosure 3 of LCV 0849-E included marked up pages from the technical specifications. Enclosed with this letter are typed pages incorporating the changes proposed by LCV 0849.
Sincerely, C. K. hicCoy CKhi/liWhi/gmb
Enclosure:
Technical Specification Changed Pages c(w): Occigia Power Company
- b. f I
hir. J. B, Beasley, Jr.
hir. hi. Sheibani NORhtS U. S Nuclear Regulatory ComminiQD hir. L. A. Reyes, Regional Administrator hit. L. L Wheeler, Senior Project hianager, NRR Resident inspector, Vogtle y W3 9710160063 971010 PDR ADOCK 05000424 P
lllh,lhfll-lll.lklkll PDR
.