c.
February 19, 1987 DISTRIBUTION:
cam-NRC PDR Docket No. 50-341 Local PDR BWD-3 r/f EAdensam' Mr. B. Ralph Sylvia JStefano ACRS(10)
EHylton i
Group Vice President - Nuclear Operation Detroit Edison Company RBernero Glainas 6400 North Dixie Highway JPartlow JHulman Newport, Michigan 48166 EJordan.
KCampe BGrimes JLee
Dear Mr. Sylvia:
Atty, OGC EGreeman RIII.
Subject:
Fermi-2 Facility Operating License No. NPF-43 License Condition
-2.C(15)," Iodine /ParticulateSamplingSystem" License Condition 2.C(15) in NPF-43 (as well as License Condition 2.C(17) in NPF-33) requires that Deco demonstrate that the plant iodine / particulate sampling system will perform its intended function and that this capability be demonstrated prior to startup following the first refueling outage. DECO's letter dated May 16, 1986, responded to the subject license condition stating that:
(1) calculated correction factors have been developed for sample line losses due to iodine plate out and particulate depositions; and (2) these cor-rection factors have been incorporated into the appropriate plant operating procedures (both of these statements are confirmed in NRC Inspection Report No. 50-341/85-017 (DRSS) dated April 1, 1986).
It is further stated in the May 16th letter that, through the use of these calculated sample line loss i
factors, DECO's comitment to NUREG-0737, Item II.F.1((2), and Regulatory Guide 1.97, Revision 2 are met, causing DECO to conclude that the subject license condition has, therefore, been satisfied.
The NRC does not concur with DECO's assessment of the subject license condition.
It is the NRC's position that the use of the calculated correction factors is ac-ceptable only on an interim basis. Regulatory Guide 1.97, Revision 3 (May 1983),
delineates that the sample line losses and deposition should be empirically pre-4 determined and that appropriate loss correction factors should be applied. The NRC endorses the approach of making actual system tests, or a full-scale mockup test, to determine line losses. As such, the NRC concludes that DECO should comply with comitments made in its letters dated October 31 and December 13, 1984, and and specifically provide a sample line loss test program which includes an eval-uation of the applicability of the test program to the Fermi-2 Standby Gas Treat-ment System.
It is recognized, however, that there are ongoing industry and NRC research pro-grams which are intended to develop a more accurate methodology and related accept-ance criteria for performing sample line loss tests. Therefore, at this time the
' NRC requires only that Deco fomally comit to implement the methodology and related acceptance criteria developed from these programs, to demonstrate by testing that the Fermi-2 iodine / particulate sampling will in fact perfom its intended function, 8702270448 870219 fDR ADOCK 05000341 PDR
. and to submit those demonstrative results to the NRC for acceptance.
Should there be any question, please let me know.
Sincerely,
/S/
John J. Stefano, Project Manager BWR Project Directorate No. 3 Division of BWR Licensing cc: See next page L:
13: DBL B
0:
- DBL l
$S fano/vag E
l' ton mIDffulman EAde> sam p2/ /87.
02/j]/87 02/jf/87 02/%/87 l
i
.r K
.m Mr. B. Ralph Sylvia Detroit Edison Company Femi-2 Facility cc:
Mr. Harry H. Voigt. Esq.
Ronald C. Callen LeBoeuf, Lamb, Leiby & MacRae Adv. Planning Review Section 1333 New Hampshire Avenue, N. W.
Michigan Public Service Commission Washington, D. C. 20036 6545 Mercantile Way P. O. Box 30221 John Flynn, Esq.
Lansing, Michigan 48909 Senior Attorney-Detroit Edison Company Regional Administrator, Region III 2000 Second Avenue U. S. Nuclear Regulatory Comission Detroit, Michigan 48226 799 Roosevelt Road Glen Ellyn, Illinois' 60137 Mr. Dennis R. Hahn, Chief Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. Steve Frost Supervisor-Licensing Detroit Edison Company-Femi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Thomas Randazzo Director, Regulatory Affairs Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Walt Rogers U. S. Nuclear Regulatory Comission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161