Forwards SONGS Unit 3 ISI Summary Rept,Cycle-9 Refueling Outage. Rept Covers Period from 950926-970721
ML20211M996
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/09/1997
From: Gibson G
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211N000 List:
References
NUDOCS 9710150218
Download: ML20211M996 (1)


Text

- -

hh SoUlHlRN CAltlORNIA I EDISON An ll>lSON 1%TIR\4lIO\ 4t** Civurany October 9,1997 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Docket No. 50-362 Insenice Inspection Summary Report San Onofre Nuclear Generating Station, Unit 3

Reference:

American Society of hiechanical Engineers (AShiE) Boiler and Pressure Vessel Code, Section XI: 1989 Edition, no Addenda, second inspection interval The purpose of this letter is to submh a copy of the Inservice Inspection (ISI' Summary Report, including the Owner's Reports of Repairs and Replacements for the San Onofre Nuclear Generating Station, Unit 3. This repott is submitted to meet the requirements of Paragraph IWA-6230 of the above reference, and ccvers the insenice examinations of Class I and Class 2 pressure retaining components and their supports.

This report covers the period from September 26,1995, through July 21,1997, the date of the unit's ieturn to senice following the Cycle 9 refueling outage. Ifyou require any further information, please so advise.

Sincerely,

/*

k 6-Gregory T. Gibson hianager, Compliance

Enclosure:

as stated cc: E. W. hierschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident inspector, San Onofre Units 2 & 2 hi. B. Fields, NRC Project hiancger, San 'Onofre Units 2 and 3 9710150218 971009 PDR ADOCK 05000362 G PDR

~