Confirms 870420-24 Insp at Facility,Per 870205 Telcon. Compliance W/Sections Iii.G,Iii.J,Iii.L & Iii.O of App R to 10CFR50 Will Be Evaluated During Insp.Listed Addl Info Requested by 870330
ML20211M784
Person / Time
Site: Surry  
Issue date: 02/17/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8702270360
Download: ML20211M784 (2)


Text

,#

g FEB 1 71987

_ V rginia Electric and Power Company M)TTN:'Mr. W. L. Stewart, Vice President, Nuclear Operations P. O. Box 26666 Richmond, VA 23261 Gentlemen:

SUBJECT:

INSPECTION OF COMPLIANCE WITH 10 CFR 50, APPENDIX R. SECTIONS III.G.,

III.J. III.L. AND III.0 AND ASSOCIATED FIRE PROTECTION FEATURES -

SURRY POWER STATION D0CKET NOS. 50-280 AND 50-281

- This letter is to confirm the dates of April 20 - 24, 1987, for the special inspection of Surry Units 1 and 2, which were established during the telephone conversation of February 5,1987, between D. A. Sommers of your staff, and W. H. Miller, Jr., of this office.

The purpose of this inspection is to evaluate the Surry Power Station for compli-ance with Sections III.G, III.J, III.L. and III.0 :of Appendix R to 10 CFR 50.

This will be a team type inspection composed of personnel from the NRC Region II

-Office.

In order for us to properly prepare and perform this type of comprehensive-and complex inspection, we request that you provide this Office with the latest revision to the following additional information by March 30, 1987:

1.

Piping and instrumentation.(flow) diagrams for hot standby and cold shutdown systems, alternative-or dedicated shutdown and the reactor coolant pump oil collection system.

2.

Plant layout and equipment location drawings which identify the physical plant locations of hot standby and cold shutdown equipment.

i-3.

' Color coded marked-up electrical raceway drawings which identify the cable L

routing of power and control circuits for those plant systems necessary to I

achieve and maintain hot standby.

1 4.

Single line AC and DC power and control electrical distribution diagrams.

5.

Plant layout drawings which identify fire area delineation and fire protec-tion equipment locations.

6.

Marked-up plant layout drawings which identify the locations of emergency lighting units.

?.

l l

8702270360 870217 PDR ADOCK 05000280

(

G PDR 4

O 3E0/

FEB 171987 Virginia Electric and Power Company 2

7.

Associated drawings which depict the physical and the seismic design of reactor coolant pump oil collection system.

8.

Associated circuit analysis.

9.

Plant Operating Procedures which describe normal hot and cold shutdown from inside the control room, emergency hot and cold shutdown from emergency control stations outside and independent of the control room, and shutdown operations which utilize alternative or dedicated shutdown capability and natural circulation.

10.

Fire damage control and repair procedures for cold shutdown systems.

In addition to the information requested above, copies of any other analysis and/or evaluation which demonstrate compliance to Sections III.G, III.J. and III.0 of Appendix R should be available on site for review during this inspec-tion.

Appropriate personnel, knowledgeable with respect to those plant systems required for safe shutdown and their capabilities, should be available at the site during this inspection. Also, we request that your staff make the necessary arrangements to permit team members ready access to the radiologically controlled areas of the plant if necessary.

Your cooperation with us during this inspection will be appreciated. Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, h[

p 6 uh n l

Luis A. Reyes, Acting Director Division of Reactor Projects cc: d. F. Saunders, Station Manager

  1. . J. Hardwick, Manager - Nuclear Programs and Licensing bec: JiRC Resident Inspector Document Control Desk Comonwealth of Virginia
d. R. Herdt LT'. Conlon D

m'~

6. Cantrell F

G. Wiseu r g Miller
p. Wiseman ;

RII' RI RII RII RII RIIp kWMiller h

on ARHerdt VP dciera FCa r 11 VBr nlee 02/M/87 02/