ML20211M537

From kanterella
Jump to navigation Jump to search
Confirms 861211 Mgt Meeting W/Util at Site to Discuss Status of Ongoing Improvement Programs & Restart Issues. Proposed Meeting Agenda Encl
ML20211M537
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/05/1986
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8612170330
Download: ML20211M537 (2)


Text

-

DEC 5 1996 enness a Vcllcy Authority ATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 thrket Street Chattancoga, TN 37402-2801 Gentlemen:

SUBJECT:

CONFIRMATION OF MEETING - SEQUOYAH - DOCKET NOS. 50-327 AND 50-328 This confirms the telephone conservation between Mr. H. L. Abercrombie of your staff and myself on November 26, 1986, concerning a management meeting to be conducted at the Sequoyah site on December 11, 1986, at 9:00 a.m.

We requested

.this meeting to discuss the status of ongoing improvement programs and other restart issues.

Enclosed is a proposed meeting agenda.

Additionally, this is to confirm a second management meeting to be conducted at the Sequoyah site on December 11, 1986, at 1:00 p.m.

This meeting concerns TVA licensing activities and was discussed by Mr. R. L. Gridley of your staff and myself on December 2, 1986.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

ORidlWK{MUNED BY GARY G. ZECH Gary G. Zech, Director Division of TVA Projects

Enclosure:

Proposed Meeting Agenda 9c w/ encl:

gl. L. Abercrombie, Site Director Sequoyah Nuclear Plant

. R. Wallace, Plant Manager

. W. Cantrell, Acting Director

/ uclear Engineering N

vR. L. Gridley, Director

/ Nuclear Safety and Licensing vN. R. Harding, Site Licensing Manager c w/ encl:

N. Grace, RII

. R. Denton, NRR

4. L. Thompson, NRR

. M. Taylor, IE e61217o300 861205 ADOCK05000g7

. B. Hayes, 0I pDa P

. R. Connelly, 0IA P

. P. Barr, RII RC Resident Inspector NRC Document Control Desk State of Tennessee qD RII RII II

/rady:er i9 })

R ar 1

K 12/4 /86 12/y/86 r]r/86

DEC.1 E86 ENCLOSURE PROPOSED MEETING AGENDA Tennessee Valley Authority December 11, 1986, 9:00 a.m.

I. Opening Remarks G. Zech II. Discussion of the following issues:

All Microbe Induced Corrosion Restart Issues Design Base Line Verification Program Class 1 Piping Traceability Bussman Fuses Tech Spec Changes for Restart Procurement Issues On Class 1E Equipment III. Closing Remarks G. Zech l

l i