ML20211M219

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-424/86-135 & 50-425/86-62 on 861215- 19.No Violations or Deviations Identified.Attention to Unresolved Items Requested
ML20211M219
Person / Time
Site: Vogtle  
Issue date: 02/17/1987
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20211M223 List:
References
NUDOCS 8702270235
Download: ML20211M219 (3)


See also: IR 05000424/1986135

Text

r

y

CY&

.;

,

'

FEB 1 71987

.

Docket Nos. 50-424, 50-425

License Nos. CPPR-108, CPPR-109

Gprgia Power Company

MTTN: Mr. James P. O'Reilly

Senior Vice President-Nuclear

Operations

P. O. Box 4545

- Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-424/86-135 AND 50-425/86-062

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

N. Merriweather on December 15-19, 1986.

The inspection included a review of

activities authorized for your Vogtle Facility Units 1 and 2.

At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the' inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

'

representative records, interviews with personnel, and observation of activities

j

in progress.

Within the scope of the inspection, no violations or deviations were identified.

!

Your attention is invited to unresolved item identified in the inspection report.

This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

i

L

will be placed in the NRC Public Document Room.

'

Should you have any questions concerning this letter, please contact us.

Sincerely,

i

I

B702270235 B70217

I

I

PDR

ADOCK 05000424

,

G

PDR.

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

l

Division of Reactor Projects

!

Enclosure:

'

Inspection Report Nos.

50-424/86-135

and 50-425/86-062

'(ccw/enci-seepage 2)

I

\\ \\

\\,

-

-

-

-

--- -

- -

-

-

a

reot

>

e

q.

.

Georgia Power Company

2

cc w/ encl:

f.E.Conway,SeniorVicePresident&

Project Director

. g Whitney, General Manager Project

upport

D. Rice, Vice President, Project

Engineering

M. H. Pinson, Vice President, Project

Construction

/.W. Hayes,VogtleQuality

ssurance Manager

-

B. Bockhold, General Manager,

gd. Nuclear Operations

Gucwa, Manager, Nuclear Safety

and Licensing

.E. H. Googe, Project

Construction Manager

W. A. Bailey, Project Licensing

Manager

d F. Trowbridge, Esq., Shaw,

Pittman, Potts and Trowbridge

f.W. Churchill,Esq.,Shaw,

Pittman, Potts and Trowbridge

g)( E. Joiner, Troutman, Sanders,

ockerman and Ashmore

G. Ledbetter, Commissioner,

Department of Human Resources

M H. Badger, Office of Planning

and Budget

p . Kirkland III, Counsel,

Office of the Consumer's Utility

Council

p0'. Feig, Georgians Against

VN.NuclearEnergy

B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

(d.anel

P

O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

d. Panel

A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

(bec w/enci - see page 3)

J

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _

-

Georgia Power Company

3

FEB 1 7198/ -

'

bec w/ enc 1:

!

Reis, 0GC

M. Hill, IE

. Miller, NRR

g.Brach,ED0

W . L. Jordan, Director,

d.DEPER,IE

Sinkule, RII

/E. Christnot, RII

/RCResidentInspector

Document Control Desk

State of Georgia

!

l

l

l

l

l

l

!

l

l

l

l

yut

&

W

M

l

NMerriweather

TC

n

JHerdt

MSin ule

S/// /87

4/it

7 d/g/87 yj)/87

'

l

l

l