ML20211L938

From kanterella
Jump to navigation Jump to search
Requests Addl Info,Including Sketch of Production Line Showing Where Gauge Located & Description of Training for R Harris & Mh Meyer to Support 860320 Submittal
ML20211L938
Person / Time
Issue date: 06/30/1986
From: Vacherlon P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Harris R
STONE CONTAINER CORP.
Shared Package
ML20211L590 List:
References
80693, NUDOCS 8612160136
Download: ML20211L938 (2)


Text

m _

_ m-

_m--

=~

[

>t f

}

June 30, 1986 t

i Stone Container Corp.

Attn: Roger Harris 2021 Swift Dr.

Oak Brook, IL 60521 Gentlemen Your letter dated March 20, 1986 did not respond to the itcms raised in our March ftT,1986 letter in sufficient detail for us to cocplete our review.

/J The manufacturer of a generally limnsed device is responsible for the installation, initial radiation survey, removal from service and pmparation of the device for shipaent. 'Ihe recipient of a generally licensed gauge is only allowed to operate the shutter nochanism and collect the leak test sarple, which does not require in-depth training or experience.

However, because you plan to ship this device to various locations, you will be doing the installation, initial radiation survey, etc.

which are the samo procedures that would normally be the manufacturers' responsibility.

'Iherefore, we cust evaluate your procedures in the sane manner as we would the manufacturer's procedures.

be will need detailed information for the following areas:

1.

A sinple lina sketch of the production line showing where the gauge is to be located.

2.

A description of the training that Roger Harris and Felvin H.

Meyer have had with the installation of the gauge, performing radiation surveys around the gauge, and preparing the gague for shipTent.

3.

A copy of the step-by-step pro dures that you will fo low when installing and renoving the gauges frca service.

4.

A copy of the procedures you will tollow ior the receipt of the gauge at a facility. You should have one of your authorized users on

{

hand to receive the gauge.

Your procedures should include instructions to plant personnel to see that the gauge is secured prior to arrival of your authorized user.

n omcr>

8612160136 860910 REC 3 LIC30 5" " >

PDR DATE)

N. _ C F U_ M 318 (10-80) N R CM O240 OFFICIR RECORD COPY

..r l

Stone Containar Corp..-

l 5.

Ymr letter tmntions that you will restrict a four foot area armnd the gatrya when the shutter is cpen. Please descrite ym r mthod for,Instricting the area (eg. roping off the area, restinj the area with signs, using barriors, etc.)

y 6.

A copy of the procedurus you will follott for preparing the gatrje shi rent.

Please address security of the gatrje prior to the for i

com.cn carrier pickup, shipping papern and latuliry in accordan with FXJr regulations.

7.

Ywr letter states that you will use a leak test kit supplied by t&C and will be evaluated by NTC.

Vo believe that this is a typographical error since NFC dacc not cupply or evaluate leak test kits. Should this fortion road by NDC rather than tIRC?

'8.

State the manufacturer name and nodel no.

of the curvey instrtrent you will use to conduct your initial radiation survey at each location after installation fut prior to une to detemine radiation exysures armnd the gatge when the shutter will be open.

'Ihe survey instnutent Lust _ te calibrated on an annual frequency.

State the nace of the persons who will do this annual calibration.

You may return the instntmnt to the ranufacturer for calibration.

9.

Ycu should expand your emrgency procedures to include notification of the Radiation Safety Officer, and the tar in the event of an accident involving the gatge. This notice shcold incitx30 the nrre and phone ntarbors ubero the persms can be reached.

te will continue our review of your application upon receipt of thin intornation.

Please reply in c%,licate, within 30 days, and roter to Control nunter 80693.

Sincerely, Patricia t1. 'vacherlon Licensing Assistant OF F ICE )

SURNAMEk g.g.g.g.gg.g. y.

g...

DATE) h nac Fonu ais o6am p gi[-3 OFFICIAL RECORD COPY n