Forwards Safety Insp Repts 50-237/87-03 & 50-249/87-03 on 861208-870113.Violations Noted.Decision Re Enforcement Action Will Be Forwarded Under Separate Cover
ML20211L655
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 02/17/1987
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20211L660 List:
References
NUDOCS 8702270173
Download: ML20211L655 (2)


See also: IR 05000237/1987003

Text

- _ . . _ - . - _ .

,.

--

.,

y

FEB 171987

. Docket No. 50-237

Docket No. 50-249

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

' Chicago,IL 60690

. Gentlemen:

This refers to the routine safety inspection conducted by Messrs. D. E. Miller

and W. B. Grant of this office during the period December 8, 1986 through

January 13, 1987, of activities at Dresden Nuclear Power Station,, Units 2 and

3, authorized by NRC Operating Licenses No. DPR-19 and No. DPR-25, to the

discussion of our findings with Mr. Eenigenburg and other members of your

staff at the conclusion of the inspection, and to the enforcement conference

held on February 6,1987, attended by Mr. Galle and others of your staff.

The enclosed copy of our inspection re) ort identifies areas examined during

the inspection. Within these areas, t1e inspection consisted of a selective

examination of procedures and representative records, observations, and

'

interviews with personnel.

l During this inspection, certain of your activities appeared to be in violation

of NRC requirements. We are releasing this report at this time for your

information. You will be notified by separate correspondence sf our decision

regarding enforcement action based on the findings of this inspection. No

written response is required until you are notified of the proposed

enforcement action.

In accordance with 10 CFR 2.790 of the Commission's regulations a copy of

this letter and the enclosures will be placed in the NRC Public, Document Room. -

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

8702270173 870217

'

"Originni sit-'^4 b7 U.D. Sh' M "

PDR ADOCK 05000237

O PDH W. D. Shafer, Chief

Emergency Preparedness and

,

Radiological Protection Branch

l Enclosure: Inspection Reports

l No. 50-237/87003(DRSS); and

No. 50-249/87003(DRSS) F

(

6 V

!

See Attached Distribution

KIII RIII

en

RIII RIII

~ wmter

RI

+

!

N RI) f '0

Ggg Milleg

i

Gr r Ring S er

-

r Y'9

L

.. .

,

1

Commonwealth Edison Company 2'

FEB'17.1987-

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

J. Eenigenburg, Plant Manager

DCS/RSB (RIDS)

. Licensing Fee Management Branch

' Resident Inspector, RIII

Attorney

Phyllis

General's Dunton,

Off ice, Environmental

Control Division

.

.i

't

1

'

1

4

4

l l

'

}

l

i,

i

J

  • -- g - , - -,- -,,-y,,.-,,,.--7,.--

.. .,%,-.,-w_%_mm,-_._% ,,#,,,..,%,,,r,,y - - ,,s.,w..,,,n,.c_,,,_,_,,n__m,,,m,w.,.wymm.-_,-eme.nmm,--3._.,