ML20211L080

From kanterella
Jump to navigation Jump to search
Presentations for July 30, 2020 Higher Burnup Workshop - NEI Presentation
ML20211L080
Person / Time
Site: Nuclear Energy Institute
Issue date: 07/28/2020
From:
Nuclear Energy Institute
To:
Office of Nuclear Reactor Regulation
Orneak M
Shared Package
ML20211L075 List:
References
Download: ML20211L080 (6)


Text

Industry Perspective NRC Higher Burnup Workshop July 30th, 2020

©2020 Nuclear Energy Institute

Key ATF Fuel Milestones SNC Hatch:

+ +/- Coated Cladding IronClad (GE/GNF)

+ +/- Enhanced UO2 Fuel SNC Vogtle: + +/- +/- High Density Fuel

+ Loadings (Framatome) +/- Loadings & Removal

+ +/- +/-

Entergy ANO-1:

(Framatome) + +/- +/-

+ +/- +/-

Exelon Byron:

(Westinghouse) + +/- +/-

+ +/- +/-

Exelon Clinton: + +/-

(GE/GNF)

+ +/-

Exelon Calvert Cliffs: + +/-

(Framatome)

+ +/-

2018 2019 2020 2021 2022 2023 2024 2025 2026

©2020 Nuclear Energy Institute 2

Accelerating ATF Deployment with Increased Enrichment and Burnup 24 Month Enhanced Refueling Fuel Cycles Performance

$9.4 Billion Enhanced in Industry Fuel IMPROVED Fuel Savings SAFELY Reliability ENHANCED PLANT SUSTAIN SAFETY ECONOMICS 20% Less THE Improved Waste & Operational

$3.5 Billion FLEET Flexibility Savings Accelerate Fuel Cycle ATF Fuel Optimization Transition

©2020 Nuclear Energy Institute 3

CW-859 Data (ORNL) 4 www.epri.com © 2019 Electric Power Research Institute, Inc. All rights reserved.

Expand the Box

  • Utilities and Vendors are engaged in discussions to accelerate the licensing of batch loads of ATF with increased enrichment and higher burnup
  • Demonstrate Licensing Pathway
  • Challenges Remain Deployment Strategy Today Future Coated Cladding Fuel Type Non-ATF only Doped Pellets Enrichment

<5% >5%

(wt.%)

Burnup ~66-68 62 (GWD/MTU) ~75

©2020 Nuclear Energy Institute 5

Questions?

Questions

©2020 Nuclear Energy Institute 6

© 2018 NEI. All rights reserved.