Forwards Safety Evaluation Accepting Util 840625 & s Re Proposed Conformance to Reg Guide 1.97. Conformance to Reg Guide 1.97,Arkansas Nuclear One,Unit 1 Encl
ML20211L025
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/03/1986
From: Stolz J
Office of Nuclear Reactor Regulation
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20211L029 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8612150275
Download: ML20211L025 (2)


Text

_

s Docket No. 50-313 December 3,1986 h

Mr. Gene Campbell Vice President, Nuclear Operations Arkansas Power and Light Company P.O. Box 551 Little Rock, Arkansas 72203

Dear Mr. Campbell:

We have completed our review of your proposed confomance to R.G.1.97, Rev. 3 which you discussed in your letters dated June 25, 1984, and May 31, 1985. We have determined that what you have provided for meeting the recommendations of Regulatory Guide 1.97 is acceptable, except for the containment sump water temperature instrumentation.

It is our position that containment sump temperature is useful to an operator in determining that the containment cooling system is functioning properly during the post-accident mode of operation. Also, it is our position that you should install environmentally qualified containment sump temperature instrumentation, or identify suitable qualified alternate instrumentation to measure the heat removed from the containment sump during the recirculation phase. We request you to implement our position and provide a schedule for implementing our position within 45 days from receipt of this letter.

The information requested by this letter affects fewer than 10 respondents; therefore, CMB clearance is not required under P.L.96-511.

Our associated safety evaluation is enclosed.

Sincerely, j

/S/

John F. Stolz, Director PWR Project Directorate #6 Division of PWR Licensing-B

Enclosures:

As stated Distribution:

Docket File NRC & L PDRs Branch Files RIngram GVissing CMcCracken GEdison JPartlow BGrimes EJordan FMiraglia ACRS OGC-Bethesda PM/

6 SL-A/PBD

~ DD:PBD PD/PBD6 G

'ng/jm CMcCracken GEdison JStolz 1

/86 12/)/86 12/3 /86 12/3 /86 8612150275 861203 '

PDR ADOCK 05000313 P

PDR

_.u: ' :

.=..:..

.)- j e

Mr. G. Campbell Arkansas Power 8 Light Company Arkansas Nuclear One, Unit 1 CC:

Mr. J. Ted Enos, Manager Nuclear Engineering and Licensing Arkansas Power & Light Company P. O. Box 551 Little Rock, Arkansas 72203 Mr. James M. Levine, Director Site Nuclear Operations Arkansas Nuclear One P. O. Box 608 Russellville, Arkansas 72801 Mr. Nicholas S. Reynolds Bishop. Liberman, Cook, Purcell & Reynolds 1200 Seventeenth Street, N.W.

Washington, D.C.

20036 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Suite 220, 7910 Woodmont Avenue Beth.esda, Maryland 20814 Resident Inspector U.S. Nuclear Regulatory Comission P. O. Box 2090 Russellville, Arkansas 72801 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Frank Wilson, Director Division of Environmental Health Protection Department of Health Arkansas Department of Health 4815 West Markham Street Little Rock, Arkansas 72201 Honorable William Abernathy County Judge of Pope County Pope County Courthouse g

Russellville, Arkansas 72801 q

'I-:

2

.j--

c-

-.,- q q,,..

r-

-.