Confirmatory Action Ltr Re Recovery Program for 860620 Offgas Charcoal Fire,Per 860623 Telcon.Data & Equipment Associated W/Event Will Be Preserved for NRC Review & Charcoal Adsorber Beds Maintained in Sealed Condition
ML20211K511
Person / Time
Site: Perry, 05004418  FirstEnergy icon.png
Issue date: 06/23/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
References
CAL, NUDOCS 8606300148
Download: ML20211K511 (2)


Text

r-m omo

/ 5 CONFIRMATORY ACTION LETTER June 23, 1986 Docket No. 50-440 Docket No. 50-441 The Cleveland Electric Illuminating Company ATTN: Mr. Murray R. Edelman Vice President Nuclear Group Post Office Box 5000 Cleveland, OH 44101 Gentlemen:

This letter confirms the telephone conversation between Mr. E. G. Greenman of this office and Mr. Lyster of your staff on June 23, 1986, related to the recovery program for the off gas charcoal fire identified at Perry on June 20, 1986. With regard to this event we understand that you will :

1.

Preserve all data and equipment associated with this event until the NRC has an opportunity to review and assess the information, 2.

Maintain the charcoal adsorber beds in a sealed condition until the NRC concurs that adequate precautions have been taken to preclude additional r

combustion.

3.

Provide a written recovery plan that will be implemented after NRC concurrence that will address as a minimum, the following:

a.

A determination of the ignition source and documentation of the activities leading up to the reporting of the fire, i

b.

The effects of the fire on the adsorber bed tanks and associated piping for the off gas treatment system.

c.

The effect of the fire on the charcoal. This should address the method of sampling and analysis including the adsorber beds to be sampled.

d.

If the charcoal is to be reused, an analysis demonstrating its adequacy shall be provided.

i e.

A description of any testing to demonstrate the adequacy of the charcoal beds and the associated equipment.

8606300148 B60623 l

DR ADOCK 050 0

CONFIRMATORY ACTION LETTER 0

J

~

n

4' CONFIRMATORY ACTION LETTER

/

The Cleveland Electric Illuminating 2

June 23, 1986 Company We also understand that startup of the reactor will not occur without concurrence of the Regional Administrator or his designee. Please let us know immediately if your understanding differs from that set out above.

Sincerely, James G. Keppler Regional Administrator cc:

J. J. Waldron, Manager, Perry Plant Technical Department M. D. Lyster, Manager, Perry Plant Operations Department L. O. Beck, General Supervising Engineer, Nuclear Licensing and Fuel Management section DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Harold W. Kohn, Ohio EPA Terry J. Lodge, Esq.

James W. Harris, State of Ohio Robert H. Quillin, Ohio Department of Health h 1w RIII RI!!

RIII

[

RII R

RI N

Ms OM A

F

[iello Gree in a s K

pier Knop /jp Warni udinn sH web CONFIRMATORY ACTION LETTER u

.