Requests Larger Blue Line Drawings of FSAR Section 1.2 Figures 1.2-2,4,6,8,10,12,16,17,19,21,23,25,28,34,35,65,66, 67,68,69,71 & 72,showing General Layout of Plant Structures, Sys & Components
ML20211J857
Person / Time
Site: Limerick 
Issue date: 06/24/1986
From: Martin R
Office of Nuclear Reactor Regulation
To: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8606270071
Download: ML20211J857 (1)


Text

_ _ _ _ _ _. _ _

I i

JUN 2 41986 DISTRIBUTION Docket m e NRC PDR i

Docket No. 50-352 L PDR PAD #4 Rdg R. Bernero OELD l

E. Jordan B. Grimes J. Partlow N. Thompson Mr. William Alden R. Martin P. O'Brien i

Engineer In Charge, Licensing Section ACRS 10 Electric Production Department J

Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101

Dear Mr. Alden:

The Final Safety Analysis Report (FSAR) contains many figures in Section 1.2 l

1 which show the general layout of the plant and its structures, systems and

.i components. Although these drawings in the FSAR are available to us it would be convenient to also have a copy of some of the larger " blue line" drawings.

l Therefore, I am requesting that you provide one large blue line copy of each

~

of the following FSAR Figures: 1.2-2, 4, 6, 8, 10, 12, 16, 17, 19, 21, 23, 25, i

28, 34, 35, 65, 66, 67, 68, 69, 71 and 72.

I j

Sincerely, l

Orighal signed by l

Robert E. Martin, Project Manager BWR Project Directorate No. 4 4

e Division of BWR Licensing i

cc:

W. Butler i

G. Gears q

a t

I i

j 1

B R4 D/BWR4 n: s WButler l

' 6/ 86 06/g86 4

0606270071 060624 i

PDR ADOCK 0000 2

P 0L.-..-_.-..-__.,--..---_--.-..-~--.,,.._--.-,-.--_.,-....-

.., -