M4e OCT 311986 Tennes9ee. Valley Authority ATTN:VMr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
' Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING - BROWNS FERRY (DOCKET NOS. 50-259, 50-260, AND 50-296)
This confirms the telephone conversation between Mr. R. D. Schulz of your staff and Mr. K. P. Barr of my staff on October 24, 1986, concerning a. management-meeting to be conducted at the Browns Ferry facility on November 4,1986, at 9:30 a.m.,
CST.
We requested this meeting to discuss the Browns Ferry Unit 2 removal and replacement of its ten 10-inch recirculation piping, including the reactor vessel inlet nozzle safe ends.
A proposed meeting agenda is enclosed.
Should you have any~ questions regarding these arrangements, we will be pleased to discuss them.
Sincerely, ORIGINAL SGNED BY t GARY G. 2ECH Gary G. Zech, Director Division.ofTVAProjects
Enclosure:
Proposed Meeting Agenda Ac w/ encl:
V H. P. Pomrehn, Browns Ferry Nuclear j _ Plant Site Director V f. L. Lewis, Plant Manager l
VR. L. Gridley, Director of Nuclear j Licensing and Safety V M. J. May, Manager of Site Licensing bec w/ encl:
(See page 2) l uD l
8611110251 861031 h
PDR ADOCK 05000259-
\\g P
PDR II l
N
=.
Tennessee Va.11ey Authority 2
-00T 31 m pcc w/ enc 1:
v'G. G. Zech vfl R. Denton, NRR 6 L. Thompson, NRR d. M. Taylor, IE
. B. Hayes, 01'
. R. Connelly, DIA G. Gears,. Licensing j Project Manager, NRR J. Grotenhuis, Project-
. Manager, NRR
. P. Barr NRC Resident Inspector State of Alabama l
.RII RII I
AJohnson:lb FCantrell Warr 10/fo/86 10/g/86 10Q/86.
GZ M r t
/
6
/
L
E ENCLOSURE PROPOSED MEETING AGENDA Tennessee Valley Authority November 4, 1986, 9:30 a.m., CST I.
INTRODUCTION (TVA/Hartwig) (TVA/ Fox)
Why Reinspected How Inspected Results of Inspection Repair / Replacement Options Considered NRC Submittal Review 84-11 response NRC Request for Additional Information LER 8601000 Safe End Crack LER 8601001 Resolution of Cracks LER Regarding RWCU Crack Response to (84-07) Replacement No. USQ On Safe End Replacement - (ALARA Program)
II.. REPLACEMENT EFFORT (What we are replacing)
(TVA/Pettitt)
Design Specifications Non Crevice GE Design 316 NG Material (NUREG 0313, Rev. 2)
Eliminating Instrument Lines (ALARA)
Reduces Number of Welds (ALARA)
Different. Schedule of Pipe Code Applications / Inspection
.New Stress Analysis Installation Steps - Inspection Hold Points Procedures Used (welding /
cutting) _
Qualification of Procedures-Training of Personnel Organization and Experience Level of Staff
2 III. ALARA (TVA/Howard)
Description of ALARA Program Regulatory Requirements Organization (Staff)
Reactor System Configuration (Shielding)
Workplan and Procedure Review Employee Training on Mockup Flushing of Nozzles Contamination Control Airborne Control Dose Tracking Projected Dose Radioactive Disposal IV.
Q.A. (TVA/Norris)
Description of Q.A. Program QA Regulatory Requirements for Replacement QA Organization (staff)
Workplan and Procedure Review Holdpcints and Sign ~ Offs
~*
Documentation of Work V.
Mockup Tour (TVA/Pettitt)
OCT 311986 NOTICE OF SIGNIFICANT MEETING Name of Licensee:
Tennessee Valley Authority Name of Facility:
Browns Ferry Units 1, 2, and 3 Docket Nos.:
50-259, 50-260, and 50-296 Date and Time of Meeting:
November 4, 1986, at 9:30 a.m., CST Location of Meeting:
Browns Ferry Facility Purpose of Meeting: Management meeting to discuss the Browns Ferry, Unit 2 removal and replacement of its ten 10-inch recirculation piping, including the reactor vessel inlet nozzle safe ends.'
NRC Attendees:
J. P. Stohr, Director, Division of Radiation Safety and Safeguards (DRSS)
K. P. Barr, Branch Chief, Division of TVA Projects (DTVAP)
A. R. Herdt, Branch Chief, Division of Reactor Safety (DRS)
J. J. Blake, Section Chief, Materials and Processing, DRS G. A. Belisle, Section Chief, Operations Branch, DRS C. M. Hosey, Section Chief, DRSS Licensee Attendees: H. P.-Pomrehn, Plant Site Director R. L. Lewis, Plant Manager E. Hartwig, Project Manager J. Pettitt, Modification Manager Additional TVA Representatives may attend.
NOTE:
Attendance by NRC personnel at this NRC/ Licensee meeting should be made known by 4:00 p'.m., November 3, 1986, via telephone call to F. Cantrell FTS:
242-5534.
I Distribution:
J. H. Sniezek, UEDR0GR i
J. Lieberman, Director, 0GCE J. Taylor, Director, IE B. Hayes, Director, 0I o
H. Thompson, Director, Division of Licensing G. Gears, Licensing Project Manager, NRR M. Grotenhuis, Licensing Project Manager, NRR bec:
(See page 2)
2 OCT 31 1986 bec:
J. N. Grace R. D. Walker-J. P. Stohr R. J. Maley G. R. Jenkins G. Gears
-M. Grotenhuis All NRC Attendees Employee Development Specialist Receptionist RII
'RII RII RI I
AJo n:lb FCa rell r
GZ ML t
10/30/86 10/yc/86 4 07 /86 10/SV86 1
6 9
j J