Special Rept:On 860602,during Performance of Controlling Procedure for Shutdown,Valve 2NC-34 Lifted.Cause Unknown. Valve Placed in Normal Mode.Controlling Circuits Checked & No Problems Identified
ML20211J731
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 07/02/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8611110240
Download: ML20211J731 (2)


Text

....

7

/

~

,e

-4 t

DUKE POWER GOMPm P.O. HOX 33180 CIIAHLOTTE, N.O. 28242 HALD. TUCKER TELEPHONE mm PRESEDFFF (704) 373-4531 wtuman Paomortion a ) d9gg u6 July 2, 1986 1

,. m.

er dDr.:-J.- Waleen Grace,3 Regional Administrator U.S. Nuclear Regulatory Connaission Region II 101 Marietta St. NW, Suite 2900

-Atlanta, Georgia 30323 Re: Catawba Nuclear Station,- Unit 2 Docket No. 50-414 [

Dear Dr. Grace:

Pursuantato3 Technical:sSpecificationr3.4.9.3, Action Statement c, please find gttached;a Spesial; Report concerning the automatic opening of a pressurizer power-operated relief valve.

Very truly yours, Hal B. Tucker RWO/ll/jgm 4

Attachment xc: Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 NRC Resident Inspector Catawba Nuclear Station V

i

\\f r

ok kh k4

.Or,.... i Copy icia i

C.

m c.

U i

r SPECIAL REPORT LIFTED VALVE 2NC34 (NC PORV)

Circumstances Initiating The Transient:

I On June -2,1986 during performance of controlling procedure for unit shutdown _(OP/2/A/6100/02), step 2.61 placed valves 2NC-32 and 2NC-34

.(pressurizer PORV's) in the low pressure (L/P) mode. This reduced.the lift j

i setpoint of the PORV's to 400 psig. 2NC-32 was placed in the L/P mode i

without incident. When 2NC-34 was placed in the L/P mode, it insiediately lifted. The Operator at the controls immediately closed 2NC-34 by placing 7

i the valve in the " normal" mode. Pressure gauges being used during depressurization ranged in values from 380 to 360 psig.. Computer indication for B loop was 379 psig. Further depressurization commenced and 2NC-34 was again placed in L/P mode. Again the PORY lifted, so it was returned to z

" normal" mode. On the third attempt, with Reactor Coolant Syster. pressure at 320 psig, 2NC-34 was placed in L/P mode without incident.

Effect of PORV On The Transient:

No real transient existed for the PORV to mitigate. Reactor Coolant pressure was lowered to 320 psig and the PORY no longer lifted.

Corrective Action To Prevent Recurrence:

The valve's controlling circuit was thoroughly checked out and no problems were identified. The valve lifted at the correct pressures in the L/P mode.