ML20211J246

From kanterella
Jump to navigation Jump to search
Forwards Change 9 to Controlling Procedure for Power Escalation TP/2/A/2100/01.Change Approved & Implemented & Constitutes Addl Controls Cited in Item 1.g of NRC
ML20211J246
Person / Time
Site: Catawba 
Issue date: 07/08/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20211J252 List:
References
NUDOCS 8611110055
Download: ML20211J246 (1)


Text

,r

(

i k.

DUKE POWER COMPANY 18.0. DOX 33180 CIIAHLOTTE, N.O. 28242 IIAL B. Tt!CKER TELzenown wwa russment (704) 373-4531

[ L il P2; c 4

" ~ ~ = ~ ~ ' " ~

s July 8, 1986 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Attention: Roger Walker 9

( D L// J

Subject:

Catawba Nuclear Station Required Additional Controls for b

Power Escalation Testing

Dear Sir:

The enclosed change to Catawba Nuclear Station Controlling Procedure for Power Escalation TP/2/A/2100/01 has been approved and implemented. This change constitutes the additional controls cited in Item 1.g of NRC/ Region II letter of July 3, 1986 to Duke Power Company.

Very truly yours, C

&b W

Hal B. Tucker ROS: sib Enclosure xc: NRC Resident Inspector Catawba Nuclear Station Dr. K. Jabbour Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 8611110055 860708 PDR ADOCK 05000413 P

PDR

((i

\\

Officia Copy ft