ML20211J246
| ML20211J246 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/08/1986 |
| From: | Tucker H DUKE POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20211J252 | List: |
| References | |
| NUDOCS 8611110055 | |
| Download: ML20211J246 (1) | |
Text
,r
(
i k.
DUKE POWER COMPANY 18.0. DOX 33180 CIIAHLOTTE, N.O. 28242 IIAL B. Tt!CKER TELzenown wwa russment (704) 373-4531
[ L il P2; c 4
" ~ ~ = ~ ~ ' " ~
s July 8, 1986 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Attention: Roger Walker 9
( D L// J
Subject:
Catawba Nuclear Station Required Additional Controls for b
Power Escalation Testing
Dear Sir:
The enclosed change to Catawba Nuclear Station Controlling Procedure for Power Escalation TP/2/A/2100/01 has been approved and implemented. This change constitutes the additional controls cited in Item 1.g of NRC/ Region II letter of July 3, 1986 to Duke Power Company.
Very truly yours, C
&b W
Hal B. Tucker ROS: sib Enclosure xc: NRC Resident Inspector Catawba Nuclear Station Dr. K. Jabbour Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 8611110055 860708 PDR ADOCK 05000413 P
((i
\\
Officia Copy ft