Forwards Safety Insp Rept 50-423/86-14 on 860414-24.No Violation Noted
ML20211F648
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/30/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20211F654 List:
References
NUDOCS 8606180436
Download: ML20211F648 (2)


See also: IR 05000423/1986014

Text

m

..

,

MAY 3 01'386

Docket No.

50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection Report No. 50-423/86-14

This refers to the routine safety inspection conducted by Mr. James Prell of

this office on April 14-24, 1986 at Millstone Nuclear Power Station, Unit 3,

Waterford, Connecticut of activities authorized by NRC License No. NPF-49

>

aad to the discussions of our findings held by Mr. Peter C. Wen with

Mr. D. McDaniel at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required.

,

Your cooperation with us in this matter is appreciated.

Sincerely,

Original Signed By:

Lee H. Bettenhausen

MStewartD.Ebneter, Director

S Division of Reactor Safety

.j

Enclosure: NRC Region I Inspection Report Number 50-423/86-14

\\

b

8606180436 860530

PDR

ADOCK 05000423

G

PDR

l l

OFFICIAL RECORD COPY

IR MILLSTONE 86-14 - 0001.0.0

05/20/86

,

e

-

.

.

Northeast Nuclear Energy Co.

2

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Constructicn

~

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

.

'

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

SRI, BV-2

T. Rebelowski, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

th

R,

RS

.

{seTgtoth

Bettenhausen

P

emw

5/))/86

5/]3/86

5$$86

0FFICIAL RECORD COPY

IR MILLSTONE 86-14 - 0001.1.0

05/20/86