Forwards 870211 & 18 Correspondence from Wg Counsil to N Wilson Re Info Requested by Cygna.Correspondence Made Available to J Ellis.Related Correspondence
ML20211F543
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/18/1987
From: Wooldridge R
WORSHAM, FORSYTHE, SAMPELS & WOOLRIDGE (FORMERLY
To: Bloch P, Jordan W, Mccollum K
Atomic Safety and Licensing Board Panel
References
CON-#187-2577 OL, NUDOCS 8702250126
Download: ML20211F543 (7)


Text

..

2677 REWED CORRESPuyUtM y

WORS H AM, FORSYTH E, S AM PELS;$gf00LDRIDGE TMinTT.Two MUNOmEO,2OOI SmVAN TO M O.SAMptLS JCC A. WomSM AM DALLAS. Tms 75201 moster A. WOOLOm. ooc NCsk 0 ANOERSON gggA g g ej Q SPENCEm C. aCLTE A F U 64 t 4*5V NON ALO M MANSON T E L E PMON C (214) S 79 - 000 Or COUNSCL J C AN SO..AN N AN JOS lef0N wonSMAM Tm Av.S t. s ANOgapOOL EARL A. FonSTTMC svDaTM a.JOMNSON

{ f,-

meCMamo L. ADAM S rp' OA WO C. LONtmOAN

  • " ~ ' -

TELEcoplC4 (2141880- 0011 JOMN w. McagTNOLOS

~

TMOM AS F. EsLLanO mOngstM.wsSE TsMOTM F A MACm NOGCmf M FILLMOnt WM STEpMEN BOTO Manna WASCM CMasSTCPMCm m. M LTgNetmotm RO9tmT

  • OLivte Mann SCMwamT2 meCMama O MOOng N A C. c 6.. " w " * "

February 18 1987 8

CECELiA J. sawmEn JOE A DAo S EasC M DCTEmSON WALTEm w. *MsTE Peter B. Bloch, Esquire Dr. Kenneth A. McCollom Chairman Administrative Judge Atomic Safety and Licensing Board 1107 West Knapp U. S. Nuclear Regulatory Commission Stillwater, Oklahoma 74075 Washington, D. C. 20555 Elizabeth B. Johnson Dr. Walter H. Jordan Oak Ridge National Laboratory Administrative Judge P. O. Box X, Building 3500 881 West Outer Drive Oak Ridge, Tennessee 37830 Oak Ridge, Tennessee 37830 Re: Texas Utilities Electric Company, et al (Comanche Peak Steam Electric Station, Units 1 & 2); Docket Nos. 50-445 and 50 446 - 0 L

Dear Administrative Judges:

Enclosed, for your information, are copies of correspondence from W. G.

Counsil to Nancy Williams dated February 11,1987 and February 18,1987.

These letters transmit copies of information requested by CYsna. Copies of the documents referred to therein have been furnished to Juanita ELis.

Res

ully,

/

1 g%

Robert A. Wooldridger RAW /klw Enclosures cc:

Service List Ohk h[Ohk gf6)

PDR

i i

Log # TXX-6259 File # 2260

"" "s" 10068 clo h

itIELECTRIC w c. c ow February 11, 1987

& m urnr 4 a r Perudent CYGNA Energy Services Attention: Ms. N. H. Williams, Project Manager Comanche Peak Project 101 California Street, Suite 1000 San Francisco, CA 94111

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

CPSES DOCUMENTS REQUESTED BY CYGNA

Dear Ms. Williams:

Enclosed are copies of certain docuinents you requested from TU Electric via Mr. Jack Redding.

The enclosed documents include:

ENCLOSURE A - Page 89 of the November 13/14, 1986 transcript ENCLOSURE B - Page 7 of the December 15/16, 1986 transcript ENCLOSURE C - SWEC Piping and Support System Engineering Walkdown Final Report, CPSES Unit 1, June 4, 1986 ENCLOSURE D

- SWEC Comanche Peak Unit 1, Large Bore Field Walkdown Report, October 10, 1985 ENCLOSURE E

- SWEC Comanche Peak Unit 1, Small Bore Field Walkdown Report, June 19, 1986 ENCLOSURE F - SWEC Report No.15454-N(c)-010, Impact of Construction Deviation on Stress Requalification Program, December 15, 1986 ENCLOSURE G

- TUGC0 Hardware Validation Program, Revision 3, January 7, 1987 ENCLOSURE H - TUGC0 Hardware Validation Program, Revision 0, October 8, 1986 l

l l

l l

l 400 North Olne Street i B si Dai!43. Teit U.Mt

\\

TXX-6259 February II, 1987 Page 2 of 2 d

Advanced copies of the documents were provided to you during the January 26-27, 1987 meeting with CYGNA at CPSES.

Very truly yours, W.. L(./ f

. r

<//-

Lou Mcl,.

W. G. Counsil h

By:

G. S. Keeley

'M Manager,NuclearLic4nsing JOS/ef Enclosures i

,,m-y.

__y g.7, y,

7 m.___

,_7-__,.

_m

~

m

d E

log # TXX-6280 File # 2260 33

-33 10068 clo nlELECTRIC Dji[Ys,,,,

February 18, 1987 CYGNA Energy Services Attention: Ms. N. H. Williams, Project Manager Comanche Peak Project 101 California Street, Suite 1000 San Francisco, CA 94111

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

RESOLUTION OF CYGNA CONCERNS DOCUMENT TRANSMITTAL

REFERENCES:

1.

November 13-14, 1986 CYGNA/SWEC meeting in Cherry Hill, NJ 2.

December 14-15, 1986 CYGNA/SWEC meeting in Glen Rose, TX 3.

CYGNA Pipe Stress and Pipe Supports Review Issues List Revision 3, CYGNA Letter 84056.106 dated January 9, 1987 4.

TU Electric Letter No. TXX-6133 dated December 4, 1986

Dear Ms. Williams:

In References 1 and 2, CYGNA requested information to facilitate its review of pipe stress and pipe support issues.

The requests of Reference 1 were partially fulfilled by Reference 4.

CYGNA, in Reference 3, updated its information request to reflect progress of the Reference 1 and 2 meetings and to acknowledge receipt of the documents transmitted via Reference 4.

Attached are 3 copies of outstanding documents requested in Reference 3.

Attachment A JUSTIFICATION FOR TERMINATING COMANCHE PEAK PIPING RESPONSE SPECTRUM ANALYSIS AT 50 HZ INSTEAD OF AT THE FREQUENCY CORRESPONDING TO THE ZERO PERIOD ACCELERATION RESPONSE TO CYGNA's CONCERNS ON THE METHODOLOGY FOR FLUID TRANSIENT ANALYSIS Attachment C JUSTIFICATION FOR APPLYING PLASTIC BENDING MOMENT AND PLASTIC TORSIONAL MOMENT SEPARATELY IN THE DESIGN OF SEISMIC /NONSEISMIC INTERFACE ANCHORS Attachment D SWEC 15454.05-N(C)-002 1986, INTERACTION RELATION FOR STRUCTURAL MEMBER OF CIRCULAR CROSS SECTION 400 North Olne Street I. B al Dalla. Tetu 7520t

TXX-6280.

February 18, 1987 Page 2 of 3 4

Attachment E NPSI LETTER NPSI-12-2751 dated July 9, 1984 Attachment F ITT GRINNELL DESIGN REPORT

SUMMARY

ORS 40, 3, dated January 6, 1984 Attachment G JUSTIFICATION FOR THE USE OF NELSON STUD DATA FOR THE BASES OF REDUCED HILTI SHEAR CAPACITY These attachments represent partial fulfillment of CYGNA's outstanding request for information of Reference 3.

1.

Pioe Stress Issue No. 1. MASS PARTICIPATION / MASS POINT SPACING CYGNA requested that,SWEC justify terminating Comanche Peak piping response spectrum analysis at 50 HZ instead of at the frequency corresponding to the zero period acceleration.

Attachment A fulfills this request.

2.

Pioe Stress Issue No. 20. ANSYS STEAM HAMMER (FLUID TRANSIENT) ANALYSIS CYGNA requested that SWEC address the following concerns with SWEC's Fluid Transient Analysis:

The adequacy of mass point spacing for fluid transient analysis.

a.

b.

Accuracy of including more than 50 percent of the extracted modes.

Determination of the dominant frequency of the input forcing function.

c. fulfills this request.

3.

Pioe Stress Issue 28. DESIGN of SEISMIC /NONSEISMIC INTERFACE ANCHORS CYGNA requested that SWEC respond to the CYGNA concern that piping can supply close to full plastic bending moment and close to full plastic torsional moment simultaneously.

Attachment C fulfills this request.

4.

Pine Suonort Issue 3. RICHMOND INSERT ALLOWABLES CYGNA requested that SWEC demonstrate that the reinforcement in the a.

Richmond Insert Test Slab is representative of field conditions.

b.

CYGNA requested SWEC provide Attachment C.

The response to request 4a will be submitted later.

Attachment D fulfills the request of 4b.

s aa r.au FebrJary 18, 1987 a

Page 3 of 3 4

5.

Pine Succort Issue 7. CINCHED U-BOLTS In Reference 4, SWEC was to forward the test report for the SA-36 relaxation tests. With the elimination of cinched U-Bolts, this request need not be fulfilled, since the issue is now closed.

6.

Pioe Succort Issue 16. DUAL STRUT / SNUBBER DESIGN CYGNA requested that SWEC provide the load capacity data sheets (LCD) and certified design reports (CDRs) for riser clamps to clarify that essential load cases are considered in the design of riser clamps.

The NPSI riser clamp load capacities, Attachment D, are based on the pipe load being carried equally on both arms.

This is the typical spring hanger application for NPSI riser clamps. SWEC engineers compare the higher of the two loads against one-half the CDTRS value, in accordance with NPSI requirements of Attachment D, third paragraph for struts and snubbers, to assure that the NPSI riser clamps are qualified in the event that there is an uneven distribution of load between the two arms.

Grinnell riser clamp load ratings, Attachment E, are based on 100 percent of the load being carried on one arm.

Therefore, Grinnell riser clamps are automatically qualified for the worst-case occurrence of uneven load distribution.

For spring hanger applications, where each arm sees 50 percent of the load, the load rating may be doubled.

The above explanation and Attachments E and F fulfills this request.

7.

Pioe Succort Issue 42. ALLOWABLES FOR HILTI ANCHORS HAVING EDGE DISTA LESS THAN 50 CYGNA requested SWEC to justify the use of Nelson Stud Test Data as the basis of reduced shear capacities for Hilti bolts with edge distances less than 50.

Attachment G fulfills this request.

I Very truly yours, W. G. Counsil

/ $4/

By:

G. S. Keeley W /_

Manager,NuclearLiceyng i

JDS/ef l

Attachments l

l

4 i

E Log # TXX-6258

"" 9 File #10068 3

5 10010 clo RIELECTRIC Milliam G. Counut e m,,, u,e,,,,s,,,

February 18, 1987 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 CPSES DOCUMENTS REQUESTED BY CYGNA Gentlemen:

Attached are 15 copies of the letters logged TXX-6259 and TXX-6280 (with enclosures), dated February 11, 1987 and February 18, 1987, respectively, from W. G. Counsil to N. H. Williams transmitting copies of information requested by CYGNA from TU Electric. Advance copies of the documents referenced in the letter logged TXX-6259 have been provided to CYGNA.

Very truly yours, h&

W. G.

ounsil r

By:

e G. S. Keeley

/-

c Manager, Nuclear Licehsing i

JDS/mlh Attachments c - Mr. R. D. Martin, Region IV l

Mr. D. L. Kelley, R.I., Region IV Mr. H. S. Phillips, R.I., Region IV l

l l

l j

400 North Olne Street L B. 81 Dallas. Tesas 75201

_ _.