OCT 2 4 B86
4
.
.,
,
'
In Reply Refer To:
Docket: 50-267/86-27
,
Public Service Company of Colorado
ATTN: Robert 0. Williams, Jr.
Vice President, Nuclear Operations
P. 0. Box 840
Denver, Colorado 80201-0840
-
Gentlemen:
This refers to the inspection conducted by Messrs. M. E. Skow and W.'R. Bennett
of this office during the period September 22-26, 1986,~of activities-
,
authorized by NRC Operating License DPR-34 for Fort St.. Vrain, and to;the
,
,
discussion of our findings with Mr. L. W. Singleton and other members of your
'
i
staff at the conclusion of the inspection.
-
-
-
Areas examined during the inspection included licensed operator' training,.
nonlicensed staff training, and in-office LER review. Within these areas, the
inspection consisted of selective examination of procedures.and. representative
records, interviews with personnel, and observations by the inspectors. The'
inspection findings are documented in the enclosed inspection report.
l
Curing this inspection, it was found that certain of your activities were in
potential violation of NRC requirements. However,' since this potential
violation is related to training, it is not cited herein as a violation but
is considered to be an unresolved item in accordance with the Comission
Policy Statement on Training and Qualification of Nuclear Power Plant
Personnel (50 FR 11147). No response is require.d; however, your attention to
the unresolved item which has the potential of becoming a violation in the
future is. warranted.
One unresolved item is identified in paragraph 5 of the enclosed inspection
report.
'
We have also examined actions you have taken with regard to previously
>
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
4
Original Signed By
J. S Gagh [rko, Chief
'
Reactor Projects Branch
Enclosure:
(see next page)
C:R
A
C:RPB f[
RIV:RPB/A f/ RPB/A JM
g0
MESkow;df
WRBennett
JPJ4 don
JEGagliardo
'O /L//86
4 / #/86
t0/g/66
p h3 /84
I
0610310079 861024
j
(
7
ADOCK 0500
{DR
.
,
- 1 *
<
-
,
,
>
.
Public Service Company of Colorado
-2-
Enclosure:
Appendix - NRC Inspection Report
50-267/86-27
cc w/ enclosure:
J. W. Gahm, Manager, Nuclear
Production Division
Fort St. Vrain Nuclear Station
16805 WCR 19
Platteville, Colorado 80651
L. Singleton, Manager, Quality
Assurance Division
(same address)
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
bec to DMB (IE01)
bcc distrib. by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RPB/A)
- RSB
- Section Chief (RSB/ES)
M. E. Skow
- R&SPB
W. R. Bennett
- MIS System
- RSTS Operator
- RIV File
- w/766
i
)
i
l
,
f
I
!
I
i
-.
,
,-.. .._,,
.
.- . _ - . - ~ - . . . , , . - -
. . . - . , .
. _
_
. , , , - , , . , , , , . , , - , , - . , , - - - - . .
. . . - - . - _ - . . - - -
,