Forwards Insp Rept 50-267/86-27 on 860922-26.Potential Violation Re Training Considered Unresolved Item & Identified in Paragraph 5 of Rept
ML20211F146
Person / Time
Site: Fort Saint Vrain 
Issue date: 10/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20211F152 List:
References
NUDOCS 8610310079
Download: ML20211F146 (2)


See also: IR 05000267/1986027

Text

.

_

.__ __

_

.

.

OCT 2 4 B86

4

.

.,

,

'

In Reply Refer To:

Docket: 50-267/86-27

,

Public Service Company of Colorado

ATTN: Robert 0. Williams, Jr.

Vice President, Nuclear Operations

P. 0. Box 840

Denver, Colorado 80201-0840

-

Gentlemen:

This refers to the inspection conducted by Messrs. M. E. Skow and W.'R. Bennett

of this office during the period September 22-26, 1986,~of activities-

,

authorized by NRC Operating License DPR-34 for Fort St.. Vrain, and to;the

,

,

discussion of our findings with Mr. L. W. Singleton and other members of your

'

i

staff at the conclusion of the inspection.

-

-

-

Areas examined during the inspection included licensed operator' training,.

nonlicensed staff training, and in-office LER review. Within these areas, the

inspection consisted of selective examination of procedures.and. representative

records, interviews with personnel, and observations by the inspectors. The'

inspection findings are documented in the enclosed inspection report.

l

Curing this inspection, it was found that certain of your activities were in

potential violation of NRC requirements. However,' since this potential

violation is related to training, it is not cited herein as a violation but

is considered to be an unresolved item in accordance with the Comission

Policy Statement on Training and Qualification of Nuclear Power Plant

Personnel (50 FR 11147). No response is require.d; however, your attention to

the unresolved item which has the potential of becoming a violation in the

future is. warranted.

One unresolved item is identified in paragraph 5 of the enclosed inspection

report.

'

We have also examined actions you have taken with regard to previously

>

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

4

Original Signed By

J. S Gagh [rko, Chief

'

Reactor Projects Branch

Enclosure:

(see next page)

C:R

A

C:RPB f[

RIV:RPB/A f/ RPB/A JM

g0

MESkow;df

WRBennett

JPJ4 don

JEGagliardo

'O /L//86

4 / #/86

t0/g/66

p h3 /84

I

0610310079 861024

j

(

7

ADOCK 0500

{DR

.

,

1 *

<

-

,

,

>

.

Public Service Company of Colorado

-2-

Enclosure:

Appendix - NRC Inspection Report

50-267/86-27

cc w/ enclosure:

J. W. Gahm, Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Station

16805 WCR 19

Platteville, Colorado 80651

L. Singleton, Manager, Quality

Assurance Division

(same address)

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

bec to DMB (IE01)

bcc distrib. by RIV:

  • RPB

DRSP

  • Resident Inspector

R. D. Martin, RA

  • Section Chief (RPB/A)
  • RSB
  • Section Chief (RSB/ES)

M. E. Skow

  • R&SPB

W. R. Bennett

  • MIS System
  • RSTS Operator
  • RIV File
  • w/766

i

)

i

l

,

f

I

!

I

i

-.

,

,-.. .._,,

.

.- . _ - . - ~ - . . . , , . - -

. . . - . , .

. _

_

. , , , - , , . , , , , . , , - , , - . , , - - - - . .

. . . - - . - _ - . . - - -

,