ML20211E316

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-454/86-20 & 50-455/86-12 on 860513-15.No Violations Noted
ML20211E316
Person / Time
Site: Byron  
Issue date: 06/04/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20211E321 List:
References
NUDOCS 8606130316
Download: ML20211E316 (2)


See also: IR 05000454/1986020

Text

.

.

JUN 4

1966

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. L. J. Hueter

of this office on May 13-15, 1986, of activities at Byron Nuclear Station

authorized by NRC Operating License No. NPF-37 and Construction Permit

.No. CPPR-131 and to the discussion of our findings with Mr. R. Querio and

other members of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

('

G

. Shafer, Chief

.

Emergency Preparedness and

Radiological Protection Branch

Enclosure:

Inspection Reports

No. 50-454/86020(DRSS);

No. 50-455/86012(DRSS)

.-

-

See Attached Distribution ['

f

HP

h'

,

Hueter/kst

Schumacher

ney

F

, \\

8606130316 860604

A

PDR

ADOCK 05000454

G

PDR

.

.

Commonwealth Edison Company

2

JllN <l

igEks

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser,. Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division