-7 f.-
- 3 JC7'
'h'~
OPERATINO DATA REPORT
[
UNIT SHUTDOWNS AND POWER REDUCTIONS86-354.
DOCKET NO.
Hope Cr'eek Go'n. Sta.
UNIT NAME 02/02/i7,
DATE H. Jene'en COMPLETED BY (609) 39-5261 January' 8 7 TELEPHONE REPORT MONTH HETHOD OF SHUTTINO DOWN THE TYPE REACTOR OR
~
F FORCED DURATION REASON REDUCINO CORRECTIVs ACTION /
NO.
DATE S SCHEDULED (HOURS)
(1)
POWER (2)
COMMENTS 1
01/0:!
F 0
A 5
Secondary Condensate Problems.
,~
?
4 br 4
+
J w
s#
Q a
8702240250 B70131 R
ADOCK 05000354
SUMMARY
PDR w
l<
OPERATING DATA REPORT DOCKET NO.86-354
~
UNIT Hope Creek Gen. Sta.
DATE 2/02/87 COMPLETED BY H. Jensen TELEPHONE (609)339-5261
' ~
OPERATING STATUS s.
1.
REPORTING PERIOD Jan '87 GROSS HOURS IN REPORTING PERIOD 744 k
2.
" CURRENTLY AUTHORIZED POWER LEVEL (MWt) 3293 HAX. DEPEND. CAPACITY (MWe-Net) 1939 DESIGN ELECTRICAL RATING (MWe-Net) 1967 t'
"'3 POWER LEVEL' TO WHICH RESTRICTED (IF ANY) (MWe-Net)
None 4.
REASONS FOR~ RESTRICTION (IF ANY) f THIS YR TO MONTH DATE CUMULATIVE 744 744 3414 5
'N O. OF H,0URS REACTOR WAS CRITICAL u m 6.
> REACTOR. RESERVE SHUTDOWN HOURS 0
0 0
~
7 ROURS GENERATOR ON LINE 744 744 2422.6 8.
UNIT RESbHVE. SHUTDOWN HOURS 0
0 0
e
~
,'9 GROSS THERMAL ENERGY GENERATED (MWH) 2,406,653 2,406,653 6,031,568 1
10.
GROSS ELECTRICAL ENERGY GENERATED (MWH) 825,293 825,293 1,917,952 11.
NET' ELECTRICAL ENERGY GENERATED (MWH) 790,623 790,623 1,821,453
- 12.... reach 0RSERVICEFACTOR s
-13 REACTOR AVAILABILITY FACTOR
-14.
UNIT SERVICE FACTOR 7
15.
UNET AVAILABILITY FACTOR 16.
UNIT CAPACITY FACTOR (Using Design MDC) 17 UNIT CAPACITY FACTOR (Using Design MWe) 18.
UNIT FORCED OUTAGE DATE 19 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION): None 20.
IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A "21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 6/28/86 INITIAL ELECTRICITY 8/1/86 COMMERCIAL OPERATION Under review i
t.,
7,.
AVERAGEcDAILY UNIT POWER LEVEL 1
t 1
m 86-354 DOCKET NO.
Hope Creek Gen. Station t
UNIT Y
02/02/87 DATE
?
i H. Jensen COMPLETED BY i
(609) 339-5261 TELEPHONE "U'
MONTH s
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1942 1940 j7 1 13 1937 2
18 1 24 3
19 991 1913 4
20 1953 5
21 6
22 1032 060 7
23 1035 8
24 999 1946 g
25 1 38 1913 0
26 i
1022 1922 27 1 23 1926 2
28 1 29 1028 3
29 1967 1933 4
30 68 15 31 16 l
HOPE CREEK GENERATION STATION MONTHLY OPERATING
SUMMARY
JANUARY 1987 The Hope Creek Generating Station operated at essentially 100%
capacity for the entire month with the only load reduction taking place on January 2,
1987.
The unit was reduced to approximately 80% power to allow a secondary condensate pump seal to be repaired.
The unit has operated continuously since December 11, 1986 and on January 31, 1987, the reactor had been operating for 51 consecutive days.
WJM:tlb
O PSEG Public Service Electric and Gas Company P.O. Box L Hancocks Bridge, New Jersey 08038 Hope Creek Operations February 9, 1987 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Dear Sir:
MONTHLY OPERATING REPORT HOPE CREEK GENERATING STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for January are being forwarded to you.
Sincerely yours, n,5, S W 9 "
R.
S. Salvesen General Manager -
. Hope Creek Operations WJM:tib Attachment C Distribution The Energy People
\\
95-2173(11 % 12 65 1