Forwards Calculations Providing Backup Info for Initial RAI Re Dry Transfer Sys Tsar & Address Questions 3-6,3-9, 3-10,8-8,8-9,8-10,8-11,8-16,8-23,8-24,8-26 & 8-28.RAI Questions 8-9,8-16 & 8-26 Responses Under Rev
ML20211C838
Person / Time
Site: 07201024
Issue date: 08/18/1999
From: Stewart L
ENERGY, DEPT. OF
To: Steven Baggett
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML20211C843 List:
References
TAC-L22348, NUDOCS 9908260114
Download: ML20211C838 (2)


Text

r-32-IC2A

\\

Department of Energy Washington, DC 20585 August 18,1999 Mr. Steven Baggett U.S. Nuclear Regulatory Commission Office of Nuclear Material Safety and Safeguards Mail Stop O-6-F-18 Washington, DC 20555-0001 i

Reference:

Dry Transfer System Topical Safety Analysis Report TAC NO. L22348/ Docket NO. 72-1024

Dear Mr. Baggett:

The enclosed calculations provide the backup information for the initial request for additional information (RAI) regarding the referenced report. Calculations am pmvided to address RAl#1 questions: 3-6,3-9,3-10,8-8,8-9,8-10,8-11,8-16,8-23,8-24,8-26, and 8-28. Responses to RAI#1 questions 8-9,8-16 and 8-26 are under revision as a result of the RAl#2 question and backup information will be provided with the RAl#2 responses. A revised response to RAl#1

)

question 7-1 is also enclosed as requested.

Please call me at (202) 586-2797 if additional information is needed prior to submittal of responses to RAl#2.

Sincerely, f-

\\

Jeroy Ste an Office of Acceptance, Transportation and Integration

}j l

Enclosures b

(o 9908260114 990818 ADOCK072OgO4 PDR B

Pnneed udth ooy Ire on recycled paper

r f-1

SUMMARY

TABLE FOR DETAIL STRUCTURAL CALCUL.tTIONS FOR RAl#1 l

RAI #1 TN I

Questions COMMENTS CALCS.

NO.

3-6 Wind Loads using ASCE 7-95 methodology 1051-30 l

Tomado Missile Penetration Calculations for Concrete. The detail 1051-28 l

39 calculations will be given in RAI #2 response for 8-2.

Tornado Missile Penetration Calculations for Concrete. The detail 1051 28 3-10 calculation will be given in RAI #2 response for 8-2.

Tornado Missile, Wind and Pressure Load Combinations. For DTS 1051-32'

]

Concrete structure, these calculations will be given in response to RAI l

  1. 2,8-2 and 8-7. For HVAC/ PLC enclosure and steel cover plate, these 1051-33 calculations will be given in response to RAI #2,3-6 and 8-6 8-8 respectively.

Tomado Missile impact Residual Structural Capacity. These will be 1051-32' 8-9 given in RAI #2,8-2 response.

Detail Weight Calculations - The detail calculations were given in RAI 1051-29 8-10

  1. 1,810 response.

~

Roof Plate Calculations-detail calculations will be included in RAI #2, 1051-33 8 11 8-0 Summary of stresses for various loads & load combinations were given 1051-32' in RAI #1 (Table 8.16-1 &2 for concrete and 8.24 1 &2 for steel). These 1051-33 8-16 summary tables will be revised in RAI #2 8-23 Weight calculation for the base-mat were given in RAI #1, 8-10 1051-29 8-24 Summary of Stresses in Steel Structure, were given in RAI #1,8-24 1051 33 8-26 Hogging and sagging moment calculations for wind load were given in 1051-32' RAI #1,8-26 8-28 Mode shapes and frequency were given in RAI # 8-28. The detail 1051 35 concrete structural seismic modal evaluation, see TSAR Section 8A.I.

1051 36 For shield plug and source cask tid handling subsystem, see TSAR Section 8A.4. For roof plate, see calculation 1051-35. For mezzanine plate, see calculation 1051-36.

  • Calculations for the design moments in the foundation base mat exterior cantilevers have been revised.

This revision was necessary to correct for the moments resulting from dead weight and live load on the foundation mat. The summary of stresses in concrete stmetures Tables 8.16-1 and 2 in RAI #1 have been revised. The new results are shown in Transnuclear (TN) calculation # 1051-32, Tables 8.16-1,2a and 2b.

The revised calculation of 1051-32 will be included in the RAI #2 response.

l J