Monthly Operating Repts for Jan 1987
ML20211C821
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 01/31/1987
From: Morgan H, Siacor E
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8702200228
Download: ML20211C821 (11)


Text

, .. . - - _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ __ ._

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-361 UNIT SONGS - 2 DATE February 12. 1987

f. COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 L

f OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating Station, Unit 2
2. Reporting Period: January 1987
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rating (Net MWe): 1070
6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable Capacity (Net MWe): 1070
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 744.00 30,313.00
12. Number Of Hours Reactor Was Critical 744.00 744.00 20,105.15
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 744.00 744.00 19,621.51
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 2,511,226.82 2,511,226.82 63,332,649.32
17. Gross Electrical Energy Generated (MWH) 848,589.00 848,589.00 21,264,383.50
18. Net Electrical Energy Generated (MWH) 810,948.00 810,948.00 20,096,353.55
19. Unit Service Factor 100.00% 100.00% 64.73%
20. Unit Availability Factor 100.00*s 100.00*4 64.73*4
21. Unit Capacity Factor (Using MDC Net) 101.87% 101.87% 61.96%
22. Unit Capacity Factor (Using DER Net) 101.87% 101.87% 61.96%
23. Unit Forced Outage Rate 0.004 0.00% 5.27%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

NA

25. If Shut Down At End Of Report Period, Estimated Date of Startup: NA
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA 8702200228 870131 PDR ADOCK 05000361 R PDR [( ') Lf

[

7435u/3 -

\

\

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-361 UNIT SONGS - 2 DATE February 12, 1987 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 MONTH January 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 1097.92 17 1087.25 2 1091.42 18 1091.21 3 1093.67 19 1090.46 4 1091.33 20 1091.58 5 1057.46 21 1091.54 6 1096.67 22 1091.13 7 1095.83 23 1056.42 8 1097.38 24 1077.33 9 1087.33 25 1093.96 10 1095.58 26 1094.00 11 1095.29 27 1093.33 12 1093.54 28 1092.92 l

[ 13 1093.88 29 1090.25 14 1094.08 30 1087.42 l 15 1093.50 31 1091.50 i

16 1094.33

( 7435u/4 i

i

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET No. 50-361 UNIT NAME SONCS - 2 REPORT MONTH JANUARY 1987 DATE february 12- 1981 ' . -

COM PLE T ED BY L_L S i a co r '

TELEPHONE f714) 368-6223 Method of Shutting Du ra t ion Down. . l.ER System Component Cause a: Co r rec t i ve i 2- 3 4 4 Action to No. Date Type (Ifours) Reason ' Reactor fio , Code Code Prevent Recurrence NA NA NA flA NA NA NA NA. NA NA 1 2 3 4 F- f o rced Reason: Method: IEEE-Std 803-1983 S-Scheduled A-Equipment fa ilure ( Explain) 1-Manual D-Ma intenance or Test 2-Manual Sc ra m.

C-RornoIing 3-Automat ic Scram.

D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F- Adm i n i s t ra t i ve 5-Reduction of 20%

G-Ope ra t i ona l Error (Expla in) or greater in the H-Other ( Expla in) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6-Othe r -( Expla i n) 7435u/5

~

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-361 UNIT SONGS - 2 DATE February 12, 1987 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 Date Time Event January 1 0001 Unit is in Mode 1 at 100%_ reactor power.

Turbine load at 1150 MWe gross.

January 31 2400 Unit is Mode 1 at 100% reactor power.

Turbine load at 1140 MWe gross.

7435u/6

, REFUELING INFORMATION DOCKET NO. 50-361 UNIT SONGS - 2 DATE February 12, 1987 MONTH: January 1987 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223

1. Scheduled date for next refueling shutdown.

January 1988

2. Scheduled date for restart following refueling.

April 1988 1

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet determined What will these be?

Not yet determined

4. Scheduled date for submitting proposed licensing action and supporting information.

Not yet determintd

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not yet determined

6. The number of fuel assemblies.

a) In the core. 217 b) In the spent fuel storage pool. 160

7. Licensed spent fuel storage capacity. 800 Intended change in spent fuel storage capacity. Under Review
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 1997 (refueling only)

Approximately 1993 (full offload capability) 7435u/7

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE February 12. 1987 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generating Station, Unit 3
2. Reporting Period: January 1987
3. Licensed Thermal Power (MWt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design _ Electrical Rating (Net MWe): 1080
6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable _ Capacity (Net MWe): 1080
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744.00 744.00 24,864.00
12. Number Of Hours Reactor Was Critical 50.62 50.62 16,663.30
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 47.98 47.98 15,934.31
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 100,514.24 100,514.24 46,504,299.58
17. Gross Electrical Energy Generated (MWH) 30,994.50 30,994.50 15,593,229.00
18. Net Electrical Energy Generated (MWH) 24,153.57 24,153.57 14,592,089.99
19. Unit Service Factor 6.45% 6.45% 64.09%
20. Unit Avcilability Factor 6.45% 6.45% 64.09% '
21. Unit Capacity Factor (Using MDC Net) 3.01% 3.01% 54.34%
22. Unit Capacity Factor (Using DER Net) 3.01% 3.01% 54.34%
23. Unit Forced Outage Rate 0.00% 0.00% 12.50%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Cycle 3 Refueling Outage, January 2, 1987. 70-day duration now in progress.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: March 12, 1987
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved I

INITIAL CRITICALITY NA NA 1 INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA

7435u/8

, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-362 UNIT SONGS - 3 DATE February 12, 1987 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 MONTH JANUARY 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 659.67 17 0.00 2 529.13 18 0.00 3 0.00 19 0.00 4 0.00 20 0.00 5 0.00 21 0.00 6 0.00 22 0.00 7 0.00 23 0.00 8 0.00 24 0.00 9 0.00 25 0.00 10 0.00 26 0.00 11 0.00 27 0.00 12 0.00 28 0.00 13 0.00 29 0.00 14 0.00 30 0.00 15 0.00 31 0.00 16 0.00 l 7435u/9 I

i

7 8 .

9 1

3

~

2 2'r 2

1o6 c -

3 ya Q reb 2

a S3 S u . )_

MG- {b rt 1

1 0 o ea1J t

5SFE[

.EEYE e e 0MTBtJ v c 1AA f o i n 4

fDDi l t e T EP c r ET TE e r KI EL r u CN LE roc 3 OU PT ote 8 D M C H g 9 O n n 1 C &ot i -

in l 3 ete e 0 scv u 8 uAe f a r e d C P R t

  • S E

E E

I il m e

.o %h mr 0t )

afh2 n

.r t nsi mcnnfir a aSooo ul r ii rop cctf nehxE si t Siasot r n tuuia24(

o e ll anote2

aamiicr r I

nla T o e duuotvugte C 7 p d A onntned sh U 8 m o f4 haauorerat D 9 o C t tfMACPRopO E 1 C e- - -

R M123i l $ 6 Y

R R 3 E A mla W U e e A

O 4 t t d P A s o N n J y C o 0 S i fl H t A T a 1

f A n S4 o R . N i t

l f E o m u L i t a x

o I D R (

T O O l' '

f ) e )

l i L og 3 n s n S R n r i n i din o a e a l otw t l c l l

hto c p ni p i

t tuD a 1 x oL x U eh e E MS R

[

(t s c it& (

ee ig r 2 rT rn o r) n ia ti o l r snern s io eivEi a C a Rai a e fe rtll R c y1 aap tngr rnx nanortoE n ) enitosi(

o sr 2 meI atit

ptel anar i

0 t u i nint urire a 6 o uii ge m e h lo 9 s q a e e pd p t sr i

l

( 6 aEMRROAOO D e- -l RABCDEIGl 1 2 ep S y

t d e

2 l e 0 du t 1 ed a 0 ce D 7 rh 0 8 oc 1 fS /

- - u

. FS S o 5 3 4

N 3 1 f7

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-362 UNIT SONGS - 3 DATE February 12, 1987-COMPLETED BY E. R. Siacor___

TELEPHONE (714) 368-6223 Date Time Event January 1 0001 Unit is in Mode 1 at 66% reactor power.

Turbine load at 700-MWe gross.

January 2 1400 Commenced reactor power reduction for Cycle 3 refueling outage.

-2359 Main Turbine removed from service.

January 3 0237 Reactor manually tripped. Entered Mode 3.

1840 Entered Mode 4 January 4 2103 Entered Mode 5 January 12 1225 Entered Mode 6. Preparations for lifting the reactor vessel head and commencement of core alterations are in progress.

January 14 2030 Reactor vessel head lifted.

January 16 0517 Commenced core alterations. .,

January 21 0241 Commenced fuel movement.

January 28 0035 Completed fuel movement.

r- January 31 2400 Unit is in Mode 6, day.29 of the Cycle 3 refueling outage. Core alterations in progress.

1 l

l 1-f 7435u/11 l

l l

l l

l

REFUELING INFORMATION o

DOCKET NO. 50-362 UNIT SONGS - 3 DATE February 12, 1987 MONTH: January 1987 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223

1. Scheduled date for next refueling shutdown.

June 1988

2. Scheduled date for restart following refueling.

August 1988

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Not yet determined What will these be?

Not yet determined

4. Scheduled date for submitting proposed licensing action and supporting information.

Not yet determined

5. Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operacing procedures.

Not yet determined

6. The number of fuel assemblies.

a) In the core. 217 b) In the spent fuel storage pool. 160

7. Licensed spent fuel storage capacity. 800 Intended change in spent fuel storage capacity. Under Review -
8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 1997 (refueling only)

Approximately 1993 (Full offload capability) 7435u/12

l

^

.. c y-

,f"auJ::"

Southem Califomia Edison Company SAN ONOFRE NUCLEAR GENERATING STATMN P O. BOX t 28 SAN CLEMENTE. CALIFORNIA 92672 H.E. MORGAN TELEPHONE

    • '""'"^**" February 12, 1987 ' " '* "

Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555

\*

Subject:

Docket Nos. 50-361/50-362 Monthly Operating Reports for January 1987 San Onofre Nuclear Generating Station, Units-2 and 3 Enclosed are the Monthly Operating Reports as required by Section 6.9.1.10 of  :

Appendix A, Technical Specifications to Facility Operating Licenses NPF-10 and NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively.

Please contact us if we can be of further assistance. s Sincerely, MEW Q~

Enclosures cc: J. B. Martin (Regional Administrator, USNRC Region V) s.