@rowsums Consumers Power nlKn M A W5 NiasGRE55 General offices: 1945 West Parnalf Road, Jackson, M! 49201 * (517) 788-0550 February 16, 1987 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -
DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
CLARIFICATION OF CPC-2A COMMITMENTS VERSUS BASIS REQUIREMENTS - CORRECTION Consumers Power Company submittal dated January 28, 1987 and entitled
" Clarification of CPC-2A Commitments Versus Basis Requirements,"
inadvertently contained a wrong page.
Please replace page 3 of the January 28, 1987 submittal with the attached page 3.
., n_ &-
Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, NRC NRC Resident Inspectors - Big Rock Point & Palisades Attachment P
5 0
9 I
OC0287-0220-NLO4
O QUA1.lTy ASSLRANCE PROGRAN DESCRIPyl0N (CPC-2A) b CPC-2A CPC-2A Seats for Contlensed Compliance Revision 5 Proposed Revisiojn Reason for G ange with 10ETR50 - Appendia B_
Except lon / interpret at ton Except ton /Interpretat ton CP Co understands that this requirement CP Co understands that this requirement applies gplies both to CP Co employees f rom another both to CP Co coployees f rom another site and alte and to cont ract pesonnel who are tes-to contract pesonnel etio are temporarily porarily assigned to a nuclear pewer plant assigned to a nuclear power plant either as either as replacements for tegular employees replacements for regular employees or to augment or to augment the staf f during nutages. CP Ce the staff during outages. O Co esplayees so employees so assigned possess the required assigned possess the required qualificatinns as qualifications as a prerequisite to the a prerequisite to the assignment and the review assignment and the review is waived. The is walved. 2he qualifications of contract qualifications of contract personnel are re-personnel are reviewed and arrangements made viewed and arrangements made for any necessary for any necessary training. Temporarily assigned training. All temporarily assigned personnel personnet requiring unescorted eccess receive the receive the site general orientation as es-site general orientation as embodied in General bodied in Ceneral Employee Traintas.
Employee Training.
O No ites.
Apper dia A. Part 2 (add a new item 7b - reneber entsting 7b-f and retain as is) 7b, Sec 2.4 1his change recognizes that CP Co Criterton 1bo requires that the Q4 Requirement qualifies audit personnel to 1845.2.23 program provide for indoctrination and inspectors to N45.2.6 but estab-and training to assure suitable pro-
"... Of fette inspection, esamination or 11shes the CP Co position that persons ffW.ency is achieved and estatained.
testing shall be audited sad monitored performing only monitoring activities The geogras described in CPC-2A con-by personnel who are evalifted in not involving audit or inspection need tinues to satisfy this ertterton la accordance with M45.2.6."
only be trained and qualtfled to per-that inspection monitoring and audit fore those duties. CP Ce maintains personnel must egualify In accordance racept ion / Interpret at ton that persons auditing or monitoring with standards pertinent to their offsite inspection, esamination or respective activities.
Of f stte inspection, esamination or testing testing need not be certified in the activities are audited or inspected by same manner as the persona performing No change is espected in CP Ce prac-persons qualtfled and certified in the inspection, examination or test, tice as a result of this revision.
accordance with ANSI M45.2.23-1978, as provided they have been suf ficiently endorsed by Reg Culde 1.146, or ANSI trained to recognise deficiencies.
N45.2.6, as endorsed by Reg Culde 1.58, respectively. Monitoring activities not involving audit or inspection may be conducted by persons trained and qualified to ef fectively carry out such tasks, but not necessarily certt fled to either ANSI N45.2.23 or N45.2.6 No item Appendia A. Part 2 (add a new item 9b - senumber entsting 9b and retain as is) 9b Sec 2.2($)
This chance is actually the same as Since this change merely entends an h irement 13a in CPC-2A, Revision 5.
The already approved Enception/Clartit-requirement cited was found to entst cation, the Program in CPC-2A con
- Section 2.2(5) of ANSI M45.2.4 lists in two ANSI Standards, but only one tinues to comply with Appendia D.
documents tAnich are to be available had been previously addressed.
at the constranction site.
No change in CP Ce practIca is en-Enception/ Clarification All of the doceents listed are not necessarily required at the plant site for installation and Gating. CP Co assures that they are available to the site as necessary.
QAll56-0000A-QA06 3