ML20211B913
| ML20211B913 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/28/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kingsley O SYSTEM ENERGY RESOURCES, INC. |
| References | |
| NUDOCS 8702190596 | |
| Download: ML20211B913 (2) | |
Text
yf g
JAN 2 81987 ystem Energy Resources, Inc.
TTN: Mr. O. D. Kingsley, Jr.
Vice President, Nuclear Operations P. O. Box 23054 Jackson, MS 39205 Gentlemen:
SUBJECT:
CONFIRMATION OF MEETING ARRANGEMENTS - GRAND GULF DOCKET NO. 50-416 This confircis the telephone conservation between Mr. J. E. Cross of your staff, and Mr. H. C. Dance of my staff on January 7,1987, concerning an Enforcement Conference to be held in the Region II Office on February 4,1987, at 1:00 p.m.
We requested this meeting to discuss the recent problems associated with the standby service water system at your Grand Gulf facility.
A proposed meeting agenda is enclosed.
Should you have any questions regarding these arrangements, we will be pleased to discuss them.
Sincerely, N%.f.u J. Nelson Grace Regional Administrator
Enclosure:
Proposed Meeting Agenda cc w/ enc 1:
LT'. H. Cloninger, Vice President, Nuclear V.EngineeringandSupport E. Cross, GGNS Site Director td'. R. Hutchinson, GGNS General Manager tE F. Dale, Director, Nuclear Licensing and Safety b( T. Lally, Manager of Quality Assurance
. Jiiddle South Services, Inc.
W. B. McGehee, Esquire I' Wise, Carter, Child, Steen and Caraway N. S. Reynolds Esquire Bishop, Liberman, Cook, Purcell J Reynolds W. W. Jackson, Project Engineer bec w/ enc 1:
LEjtC Resident Inspector E. Kintner, NRR Document Control Desk State of Mississippi j &
LModenos:jd gDance n DVhrrelli 5 eyes G0enki is AGibs n ' MErnst 1/p/87 1/ ty87 W 1/p /87 /1/p /87 10f/87 1/pB7 1/;L7/87 0702190596 0701n0 D
ADOCK 0500 6
g g qr
JAN 2 81047 ENCLOSURE PROPOSED MEETING AGENDA SYSTEMS ENERGY RESOURCES, INC.
FEBRUARY 4, 1987, 1:00 P.M.
I. Opening Remarks J. N. Grace II. Standby Service Water System (SSWS) Problems L. A. Reyes Seismic instrument flow coefficient Seismic design consideration of room cooler nozzles Design assumption of system heat loads License Condition 2.C.(21) application Inadequate SSWS flows III. Discussion of SSWS problems
- 0. D. Kingsley T. H. Cloninger IV. Closing Comments J. N. Grace o
w