ML20211B820
ML20211B820 | |
Person / Time | |
---|---|
Site: | Millstone, Pilgrim, Vermont Yankee, Haddam Neck, Yankee Rowe, Maine Yankee, 05000000 |
Issue date: | 05/29/1986 |
From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
To: | Travis M CONCORD MONITOR, CONCORD, NH |
References | |
FOIA-86-328 860509, NUDOCS 8606120051 | |
Download: ML20211B820 (1) | |
Similar Documents at Millstone, Pilgrim, Vermont Yankee, Haddam Neck, Yankee Rowe, Maine Yankee, 05000000 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999
[Table view]Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene ML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl ML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217N8371999-10-13013 October 1999 Forwards Summary of Changes Made to Maine Yankee Defueled Security Plan,Iaw 10CFR50.54(p)(2).Without Encl ML20217J0241999-10-13013 October 1999 Documents 991005 Telcon Between NRC & Util to Address All of Areas Identified in Reg Guide 1.179 & NUREG-1700 Re Final Survey Plan Except for One Area ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl CY-99-137, Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam1999-10-12012 October 1999 Notifies NRC of Intent to Apply Haddam Neck Plant 10CFR50 App B,Qa Program to Activities Related to Development of ISFSI at Haddam DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C1051999-10-0808 October 1999 Forwards Amend 153 to License DPR-3 & Safety Evaluation. Amend Revises TS Section 6.0,Administrative Controls,By Deleting TS Sections 6.2.2.f Which Contains Limits on Working Hours of Plant Staff ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212J2231999-10-0101 October 1999 Forwards Copy of Environ Assessment & Fonsi Re 990317 Application for Amend to Revise TS Section 6.0 by Deleting TS Section 6.2.2.f Which Contains Limits on Working Hours of Plant Staff ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process 1999-09-30 Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA MONTHYEARML20058C1231990-10-18018 October 1990
[Table view]Responds to Which Objected to NRC Response to Inspector General Rept 90-N02 Re Emergency Preparedness. Special Task Force Established to Review Comments & Documents Presented at 900906 Meeting ML20059H3711990-09-0505 September 1990 Responds to Sent to M Miller Re Actions Taken by Util to Install Tanks on Property Adjoining Power Station. Tanks Being Installed as Part of Sewage Leach Field Sys for New Waste Treatment Facility.Nrc Has No Concerns Re Tanks ML20058M3261990-08-0909 August 1990 Responds to Re Fr Notices to Amend OL for Plant. Plant Request Consistent W/Previously Approved Requests Re BWRs & BWR Sts.Most Other BWRs Perform Logic Sys Functional Test Once Per 18 Months ML20055G7841990-07-19019 July 1990 Responds to Enclosing Article from Providence Journal Which Stated That Plant Could Operate at No More than 65% of Power While Recirculation Pump Working.License Condition Does Not Permit Continuous Single Loop Operation ML20055G3261990-07-13013 July 1990 Responds to to AR Blough Concerning NRC Findings of Reasonable Assurance Re Emergency Preparedness at Plant. Reasonable Assurance Exists Now & Existed When NRC Permitted Initiation of Power Ascension Program Above 5% Power ML20055F0541990-06-19019 June 1990 Final Response to FOIA Request.App C Records Encl & Available in PDR IA-89-409, Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6)1989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247R3361989-09-26026 September 1989 Final Response to FOIA Request.App a & B Records Available in PDR & Encl.Portions of App B Record Withheld (Ref FOIA Exemption 6) ML20247L1601989-09-14014 September 1989 Responds to 890816 Mailgram Re Lack of Action by NRC on Allegation of Nuclear Safety Violations by Util at Plant.Ofc of Investigations Currently Reviewing Region I Request for Investigation.Decision Will Be Sent within 2 Wks ML20247F0481989-07-25025 July 1989 Partial Response to FOIA Request for Records.App L Record Available in Pdr.App M Records Partially Withheld Ref (FOIA Exemption 7).App N Record Provided to Requestor But Not Made Publicly Available at This Time ML20245B3881989-06-15015 June 1989 Responds to Re Flow & Pressure Drop Calculations for RWCU & Feedwater & Condensate Sample Panels.Util Actions Do Not Have Adverse Impact on Nuclear Reactor Safety to Extent That Protection of Safety of Environ Affected ML20245A8151989-06-14014 June 1989 Responds to 890515 Request for Info Re 880412 RCIC Sys Event.Augmented Insp Team Concluded That Transient Minor Since Several Barriers Remained Intact to Mitigate Effects of Potential Intersystem Loss of Coolant ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20245G7231989-06-0707 June 1989 Responds to Re Handling of Allegation Concerning Calibr of Gauges,Calibr Procedures & Possible Employee Job Discrimination at Facility.Special Insp Will Be Conducted to Address Concerns DD-89-03, Advises That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-89-03 Expired.Commission Declined Review.Decision Became Final Action on 890522.W/Certificate of Svc.Served on 8906061989-06-0606 June 1989 Advises That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-89-03 Expired.Commission Declined Review.Decision Became Final Action on 890522.W/Certificate of Svc.Served on 890606 ML20246P6791989-05-0202 May 1989 Responds to Questions in Re Liability & Responsibility Requirements Under Price-Anderson Act.State of Ma Civil Defense Agency or FEMA Should Be Contacted Re Draft Implementing Procedures for Duxbury,Ma ML20247M3641989-04-27027 April 1989 Responds to 880722 Petition Requesting That Action Be Taken Re BWRs to Relieve Alleged Undue Risks to Public Health & Safety Posed by thermal-hydraulic Instability of BWRs as Revealed by 880309 Event ML20244D6521989-04-17017 April 1989 Responds to to Chairman Zech Re Concerns W/Status of Emergency Preparedness at Facility.Commission Continues to Endorse Deliberate,Phased Startup Program,Over 4 to 6 Month Period,W/Augmented NRC Oversight ML20245B4051989-04-14014 April 1989 Responds to 881004 & 890119,23 & 0310 Ltrs Re Status of Investigation of Concerns About Corrosion Inhibitors & Design of Sampling Sys.Low Velocity of Liquid in Hotwell Sampling Considered Satisfactory ML20247F6481989-03-30030 March 1989 Ack Receipt of Info Sent in Transmittal Postmarked 890218 Re NRC TLD Direct Radiation Monitoring Network ML20245C1501989-03-30030 March 1989 Forwards NRC Biweekly Status Insp Repts of Plant in Response to 890315 Article Re Lapse in NRC Insp Coverage.W/O Encl ML20246M4591989-03-10010 March 1989 Responds to to Vice President Bush Re Personal Safety If Facility Permitted to Restart.Resumption of Power Dependent on Satisfactory Demonstration of Required Improvements in Emergency Preparedness ML20235R3601989-02-23023 February 1989 Discusses Review of Current Status of Licensee Power Ascension Test Program & Specific Issues Identified During 880408 Mgt Meeting ML20246N1521989-02-22022 February 1989 Responds to Re Amended Indemnity Agreement W/ Utils to Permit Storage of Spent Nuclear Fuel.Fr Notice Encl ML20235H3251989-02-0808 February 1989 Responds to Raising Question Whether Nuclear Pollution from Facilities Could Travel to Charlestown,Ri.Nrc Assessment Concluded That Potential of Facility Operation Having Radiation Effect on Charlestown Extremely Remote ML20206D9201988-11-0909 November 1988 Responds to Re NRC 880331 Response to Questions Raised Concerning Conditions at Plants & Recipient Proposal to Station Senior Operator in Control Room at All Nuclear Plants to Oversee Plant Operations ML20195G2121988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App D Document & Releasable Portions of Documents E/1 Through E/3. App D & Releasable Portions of Documents E/4 Through E/6 Available in Pdr.Portions Withheld (Ref FOIA Exemption 5) ML20206D8871988-11-0808 November 1988 Responds to 881015 Postcard Recommending Keeping Seabrook & Pilgrim Facilities Closed & Question Re Nuclear Waste Disposal.Two Levels of Waste for Commercial Nuclear Power Plants Considered ML20195G5361988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App a Documents.App a Documents Also Available in PDR ML20206H4511988-11-0808 November 1988 Final Response to FOIA Request for Documents.Forwards App U Documents.App U Documents Also Available in Pdr.App U Document Withheld (Ref FOIA Exemption 5) ML20205S0951988-11-0707 November 1988 Responds to 881015 Concerns Re Proposed Restart of Plant. Chairman Zech to P Agnes Re Expulsion from Meeting Encl ML20206B3011988-11-0303 November 1988 Forwards Util Description of Safety Enhancement Program, NRC Initial Assessment,Request for Addl Info & Util Revised Info Re Direct Torus Vent Sys,Per 881004 Discussion.W/O Encls ML20205S3841988-10-13013 October 1988 Partial Response to FOIA Request for Documents.App D,E & F Records Encl & Available in Pdr.App F Records Partially Withheld (Ref FOIA Exemption 6) ML20154P9021988-09-27027 September 1988 Forwards NRC Restart Assessment Panel Restart Readiness Assessment Rept for Facility.W/O Encl ML20154Q2811988-09-27027 September 1988 Forwards Restart Readiness Assessment Rept for Facility. W/O Encl ML20154Q3091988-09-27027 September 1988 Forwards Restart Readiness Assessment Rept for Facility. W/O Encl ML20154Q3271988-09-27027 September 1988 Forwards Restart Readiness Assessment Rept for Facility,For Public Availability.W/O Encl ML20154Q3521988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24,SALP Rept 50-293/87-99 for 870201-880515 & Transcripts from ACRS Subcommittee 880826 Meeting in Bethesda,Md Re Proposed Plant Restart.W/O Encl ML20154P8861988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24,SALP Rept 50-293/87-99 for 870201-880515 & Transcript of ACRS 880826 Meeting in Plymouth,Ma & 880908 Meeting in Bethesda,Md Re Plant Restart.W/O Encls ML20154Q1571988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24 & SALP Rept 50-293/87-99.Transcript of ACRS 880826 Meeting Also Encl.W/O Encls ML20154Q2451988-09-15015 September 1988 Forwards Integrated Assessment Team Insp Rept 50-293/88-21 on 880808-24 & SALP Rept 50-293/87-99 for 870201-880515 & Transcript from ACRS 880826 Meeting for Public Review.W/O Encls ML20153D2251988-08-24024 August 1988 Advises of Official Hours of NRC for Persons to Serve Pleadings,Papers or Documents on NRC Attys in Hearing Div of Ofc of General Cousel ML20154D3891988-08-22022 August 1988 Partial Response to FOIA Request for Documents.Forwards App T Documents.Apps & T Documents Available in PDR ML20151W1741988-08-16016 August 1988 Responds to 880623 Appeal of 880610 Denial of FOIA Request. Previously Withheld Record Encl.Region I Responded to Remaining Portion of Not Directly Relating to FOIA Request ML20245D6581988-08-0404 August 1988 Discusses to Congressman Hastert Re Concern That Maint & Operations Employees of Listed Nuclear Power Plants in Vicinity of Seneca,Il Working Excessive Hrs ML20206E0051988-07-27027 July 1988 Responds to Enclosing Prior Correspondence W/Nrc Re Conditions at Ref Plants & 10CFR50.54(x) & (Y).Issues Raised Will Be Given Wide Dissemination in Fr & Careful Consideration by NRC ML20151B1801988-07-0808 July 1988 Responds to Expressing Concern Re Adequacy of Highway Network Being Considered as Part of Emergency Plan. Location in Wellesley Tentatively Selected as Site for Reception Ctr.Fema Approves Adequacy of Ctrs ML20207D1121988-07-0505 July 1988 Partial Response to FOIA Request for Documents.Forwards App M Documents.App L Documents Maintained in Pdr.Apps N & O Documents Partially & Totally Withheld,Respectively (Ref FOIA Exemption 5) ML20195F8041988-06-15015 June 1988 First Partial Response to FOIA Request for Documents. Forwards Apps B & C Documents.Documents Available in Pdr.App a Documents Also Available in Pdr.Apps D Through G Documents Withheld (Ref FOIA Exemption 5).Releasable Portion Encl ML20195C6711988-06-14014 June 1988 Forwards Answers to Questions from Recipient Ref by Senator Kennedy,Per .Nrc Does Not Inspect or Monitor Animal Census & Distribution of Carcasses,Meat,Organs & Milk.Licensee Monitors Milk Samples 1990-09-05 Category:OUTGOING CORRESPONDENCE MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999
[Table view]Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217K3161999-10-19019 October 1999 Forwards Amend 195 to License DPR-61 & Safety Evaluation. Amend Deletes Certain TSs Either No Longer Applicable to Permanently Shutdown & Defueled State of Reactor or Duplicate Regulatory Requirements ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C1051999-10-0808 October 1999 Forwards Amend 153 to License DPR-3 & Safety Evaluation. Amend Revises TS Section 6.0,Administrative Controls,By Deleting TS Sections 6.2.2.f Which Contains Limits on Working Hours of Plant Staff DD-99-11, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 9910041999-10-0808 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-11) Expired & That Commission Declined Any Review.Decision Became Final Action on 991004 ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212L1261999-10-0404 October 1999 Forwards Viewgraphs Presented by Licensee at 990923 Meeting with Nrc,In Response to Request ML20212J2231999-10-0101 October 1999 Forwards Copy of Environ Assessment & Fonsi Re 990317 Application for Amend to Revise TS Section 6.0 by Deleting TS Section 6.2.2.f Which Contains Limits on Working Hours of Plant Staff ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212F4321999-09-24024 September 1999 Responds to 990921 e-mail to E Poteat,Requesting Waiver of Late Charges of Listed Amount for Annual Fee Invoice AR0431-99.Request Denied Because 10CFR15.37 Does Not Provide for Waiver Based on Info Provided in e-mail ML20212D0341999-09-20020 September 1999 Expresses Appreciation for Accepting NRC Request for Tour of Haddam Neck Facility During on 991014.Invites R Mellor to Participate in NRC 1999 Decommissioninng Power Reactor Work- Shop:Nrc Insp Program at Decommissioning Power Reactors ML20212E4611999-09-20020 September 1999 Responds to Concerning Possible Involvement in Weekly Telephone Calls NRC Staff Has with Maine Yankee Staff ML20212F1361999-09-20020 September 1999 Confirms That NMSS Has Received 990916 Submittal & Will Be Included as Attachment to Commission Paper Along with State of Maine Submittal ML20212F2521999-09-20020 September 1999 Confirms That NMSS Has Received 990916 Submittal & Will Be Included as Attachment to Commission Paper Along with State of Maine Submittal ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl ML20212A5911999-09-0808 September 1999 Responds to 990816 e-mail & 990901 Telcon with Respect to Comments Re Decommissioning of Maine Yankee Site.Concerns Raised with Respect to Status of Fuel at Maine Yankee Have Been Raised in Previous Ltrs to Us NRC ML20211K5171999-09-0202 September 1999 Expresses Appreciation for Support Provided for NRC Public Meeting on 990825 ML20211H0741999-08-30030 August 1999 Discusses GL 92-01,Rev 1, Rv Structural Integrity, Issued by NRC on 950519 & NNECO Responses for Millstone Unit 2 & 980715.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 Based on Response Review ML20211M9371999-08-30030 August 1999 Addresses Two Issues Raised in s to Senator Collins & Governor a King That Relate to Construction of ISFSI at Maine Yankee ML20212B2181999-08-30030 August 1999 Responds to Re 990707 Message from N Allen Re Transportation Incident Involving Shipment from Maine Yankee Nuclear Power Plant 1999-09-08 |
Text
-
p ran, TDR-OS
- p g
4 p, UNITED STATES NUCLEAR REGULATORY COMMISSION 3 y WASHINGTON, D. C. 20555 C,
'f
..... MAY 29 E Mr. Mark L. Travis Concord Monitor IN RESPONSE REFER Concord, NH 03301-1177 TO F01A-86-328
Dear Mr. Travis:
This is in response to your letter dated May 6,1986, in which you requested, pursuant to the Freedom of Information Act, inspection reports for operating plants in Maine, Vermont, Massachusetts, Rhode Island, and Connecticut from 1983 -
through 1986.
In a telephone conversation on May 20, 1986, with Ms. Mary Jean Pool of my staff, you agreed to accept printouts listing the inspection reports available at the NRC's Public Document Room (PDR) 1717 H Street, NW Washington, DC 20555.
Enclosed are printouts listing the publicly available inspection reports for Maine Yankee (Maine); Vermont Yankee (Vermont); Yankee Rowe and Pilgrim (Massachusetts); and Millstone and Haddam Neck (Connecticut). There are no nuclear power plants in Rhode Island.
Also enclosed is a notice that provides information about charges and procedures for obtaining records from the PDR.
Sincerely, O
Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosures:
As stated i
i l
l l
l l
8606120051 860529 l PDR FDIA l
TRAVIS86-328 PDR l
~
'