PARSONS Daniel L Curry, vee new>>nuuww kwes Partum Powur Group loc 2675 Morgantown Road
- Tkrading. Pennsytvarua 19007 * (010) 8% 23M
- Far (610) 655-2002 September 24,1997 Docket No. 50-336 Parsons NUM2 PPNR-0585 L U.S. Nuclear Regulatory Commission Attention: Document Controi Desk Washington, D.C. 2055$
Millstone Nuclear Power Station Unit No. 2 Indeggndent CorInttive Action Verification Procram (ICAVP)
Gentlemen:
This letter transmits Resision 3 of the following Project Procedures: PP-02, " Accident Mitigat'on Systems Review" and PP-03, " Process Review CMP Horizontal Slice". These revisions incorporate additional reviews performed by the Technical AAisory Group.
Please call me at (610) 855-2366 if you have any questions.
Sincerely, kt'tt C2 n Daniel L. Curry Parsons ICAVP Project Director DI.C cvb Attachments:
I cc:
E. Imbro (2)- USNRC
}
- 11. Eichenholz-USNRC R. Laudenat - NNECo l
J. Fougere - NNECo l
Rep, Terry Concannon - NEAC L
9709250303 970924 PDR ADOCK 05000336 P