ML20211B680

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to PP-02, Accident Mitigation Sys Review & Rev 3 to PP-03, Process Review,Cmp Horizontal Slice, Which Incorporates Addl Reviews Performed by Technical Advisory Group
ML20211B680
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/24/1997
From: Curry D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211B685 List:
References
NUM2-PPNR-0585, NUM2-PPNR-585, NUDOCS 9709250303
Download: ML20211B680 (1)


Text

,~

PARSONS Daniel L Curry, vee new>>nuuww kwes Partum Powur Group loc 2675 Morgantown Road

  • Tkrading. Pennsytvarua 19007 * (010) 8% 23M
  • Far (610) 655-2002 September 24,1997 Docket No. 50-336 Parsons NUM2 PPNR-0585 L U.S. Nuclear Regulatory Commission Attention: Document Controi Desk Washington, D.C. 2055$

Millstone Nuclear Power Station Unit No. 2 Indeggndent CorInttive Action Verification Procram (ICAVP)

Gentlemen:

This letter transmits Resision 3 of the following Project Procedures: PP-02, " Accident Mitigat'on Systems Review" and PP-03, " Process Review CMP Horizontal Slice". These revisions incorporate additional reviews performed by the Technical AAisory Group.

Please call me at (610) 855-2366 if you have any questions.

Sincerely, kt'tt C2 n Daniel L. Curry Parsons ICAVP Project Director DI.C cvb Attachments:

I cc:

E. Imbro (2)- USNRC

}

11. Eichenholz-USNRC R. Laudenat - NNECo l

J. Fougere - NNECo l

Rep, Terry Concannon - NEAC L

9709250303 970924 PDR ADOCK 05000336 P

PDR h,h

(' ^

se.

g 1