Monthly Operating Rept for May 1986
ML20211B526
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/31/1986
From: Smith P, Vandenberg D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
References
NUDOCS 8606110724
Download: ML20211B526 (5)


Text

0 4

I i

OPERATING DATA REPORT DOCKET NO 50-255 DATE 06-04-86 COMPLETED BY PASmith TELEPHONE (616)764-8913 OPERATING STATUS NOTES 1.

Unit Name: Palisades 2.

Reporting Period:

860501-860531 3.

Licensed Thermal Power (MWt):

2530 4.

Nameplate Rating (Gross MWe):

811.7 5.

Design Electrical Rating (Net MWe):

805

/

6.

Maximum Dependable Capacity (Gross MWe): **770 7.

Maximum Dependable Capacity (Net MWe):

    • 730 8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

9.

Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

This Month Yr-to-Date Cumulative 11.

Hours In Reporting Period 744 3623 126,662

12. Number of Hours Reactor Was Critical 484.7 1490.5 69,790.3 13.

Reactor Reserve Shutdown Hours 14.

Fours Generator On-Line 446.3 1324.4 66,283.1 15.

Unit Reserve Shutdown Hours

16. Gross Thermal Energy Generated (MWH) 1,107,336 2,760,600 138,362,640
17. Cross Electrical Energy Generated (MWH) 357,930 896,530 43,113,930 18.

Net Electrical Energy Generated (MWH) 339,758 841,244 40,582,604 19.

Unit Service Factor 60.0 36.6 52.3 20, Unit Availability Factor 60.0 36.6 52.3 21.

Unit Capacity Factor (Using MDC Net) 62.6 31.8

  • 50.2 22.

Unit Capacity Factor (Using DER Net) 56.7 28.8 39.8

23. Unit Forced Outage Rate 40.0 38.3 31.5 24.

Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):

If Shut Down at End of Report Period, Estimated Date of Start Up: June 22, 1986 es.

26 Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Weighted Average (635 MWe used as MDC Net prior to October 1985)

OC0185-0001E-0F03 l

8606110724 860531 k(l PDR ADOCK 05000255 R

PDR

F e-AVERAGE DAILY UNIT POWER LEVEL 4-DOCKET NO 50-255 UNIT Palisades DATE 06-04-86 COMPLETED BY PASmith TELEPHONE (616)764-8913 MONTH.

May 1986 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 767 17 763 2

766 18 773 3

750 19 448 4

763 20 0

5 760 21 0

6.

750 22 0

7 761 23 0

8 765 24 0

9 765 25 0

10 764 26 0

11 763 27 0

12 765 28 0

13 763 29 0

30 0

14 758 15 754 31 0

16 759 iil INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

i OC0185-0001C-OP03

o.

SUMMARY

OF OPERATING EXPERIENCE FOR MAY 1986 The plant operated at approximately 97% power until May 19 at 1416 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.38788e-4 months <br /> when the reactor tripped due to a complete loss of power to the turbine EHC Control System, resulting in Turbine Governor and intercept valves cidsing I

and subsequent Reactor trip on PCS High Pressure.

The reactor was again critical on May 20 at 0751 hours0.00869 days <br />0.209 hours <br />0.00124 weeks <br />2.857555e-4 months <br /> and remained in hot standby until May 21 at 2209 hours0.0256 days <br />0.614 hours <br />0.00365 weeks <br />8.405245e-4 months <br /> when the reactor returned to suberiticality and proceeded to cold shutdown for repairs. The Plant achieved cold shutdown on May 22 at 2159 hours0.025 days <br />0.6 hours <br />0.00357 weeks <br />8.214995e-4 months <br /> and remained there through the end of the reporting period.

I Oc0185-0001E-0F03

DOGET NO.

50-255 IMIT SHtmumS AND POWER REDL'CIIONS 11 NIT NAM Palisades DATE 06-04-86 COMPLETED BY PASmith

~

REPOKE MONTH May 1986 TELEPn0NE (616)-764-8913 -

1 2

Cause & Cerrective:

Dutation Reason Method of Licensee Systy Conropnt No.

Date Type a

(Sours)

Shuting Event Code Code Action to Dcwn Reactor Report 4 Prevent Recurrence

'.i 7

860519 F

297.7 A

3 Yet to be Loss cf Power to written Turbine EHC Control System i

1

?

1, 2.

3.

4 S.

F: Forced Reason:

Methods Exhibit G - Instructions Exhibit I - Same Source

)

S: Scheduled A* Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance er Test 2-Manual Scram Entry Sheets for Licerosee C-Re fueling 3-Autonctic Scram Event ' Report (LER) File l

D-Regulatory Restriction 4-Other (Explain)

(FI' REG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) r OC0185-0001D-OP03

Consumers Power Company e.n..o.

Nucru, n.,,i 2nso siu. sm u m.at M@way. Coen. W 49043 June 4, 1986 US Nuclear Regulatory Conuniscion Mail and Records Section Vashington, DC 20555 LICENSE REPORT Of MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Giunmary of Operating Experience for the Palisades Nuclear Plant for the month of May 1986.

n

<~-

~

Dewey VanDenBerg Reactor Engineer CC: KMHaas, Palisades CHGoralski, Palisades JGKeppler, USNRC JRSchepers, Palisades KWBerry, P24-614B RAFenech, Palisades Resident Inspect.or, Palisades DLHacket!., P11-228h MAlapinski, P21-332 GWBruckmann, Div of Radiological Health Services, Lansing, Michtgan ZCCordero, Michigan Dept of Labor RCallen, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RVraylor, CE, Palisades AAAlatalo, Palisades EWAnderson, Palisades EHKoepke, P21-319 GBSzczotka, P-21-311B Document Control. 950*22*35*10/L GCP86-015 A>

  • t OC0185-0001A-OP03