Text
_
s May 30,1986 Docket Nos. 50-321/366 Mr. J. T. Beckham, Jr.
Vice President - Nuclear Generation Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302
Dear Mr. Beckham:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28 ITEMS 3.1.3 AND 3.2.3 - POST-MAINTENANCE TESTING Re:
Edwin I. Hatch Nuclear Plant, Unit Nos. I and 2 We have completed our review of your November 7,1983 and February 29, 1984 responses to Items 3.1.3 and 3.2.3 of Generic Letter 83-28 relating to post-maintenance testing requirements which degrade safety. The enclosed Safety Evaluation documents our concurrences with the enclosed contractor's findings and finds your responses for these items to be acceptable. We therefore consider these items to be closed by this action.
Sincerely, Original signed by/
George W. Rivenbark, Project Manager BWR Project Directorate #2 Division of BWR Licensing
Enclosures:
1.
Safety Evaluation 2.
EG&G Idaho, Inc. Report cc w/ enclosures:
See next page DISTRIBUTION 1 (Docket File J ACRS (10)
'NRC PDR 0 ELD Local PDR EJordan PD#2 File JPartlow RBernero BGrimes SNorris GRivenbark No rk
(
5/.1V86 5/M/86 5/p/86 8606110584 860530 PDR ADOCK 05000321 P
pos
/
Mr. J. T. Beckham, Jr.
Edwin I. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 cc:
Bruce W. Churchill, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.
Washington, D.C.
20036 Mr. L' T. Gucwa Engineering Department Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Mr. 4. C. Nix, Jr., General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc.
P. O. Box 2625 Birmingham, Alabama 35202 Resident inspector U.S. Nuclea-Regulatory Comission Route 1. P. O. Box 279 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Comission, 101 Marietta Street, Suite 3100 Atlanta, Georiga 30303
~
Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Stttet S.W.
Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Comissioner Department of Natural Resources 270 Washington Street, N.W.
Atlanta, Georgia 30334 Chaiman Appling County Comissioners County Courthouse Baxley, Georgia 31513
..