hV e na
/
'o UNITEJ STATES
~g I
NUCLEAR REGULATORY COMMISSION g
t wAsuewoTow, o.c. zones February 12, 1987 Docket Nos.
50-327 50-328 MEMORANDUM FOR:
Distribution FROM:
B. J. Youngblood, Director PWR Project Directorate #4 Division of PWR Licensing-A
SUBJECT:
TVA SEQUOYAH ISSUES, SCHEDULING CONFERENCE CALL AND RESTART MEETING ATTACHMENT:
(1) Revised Issues Sumary for Sequoyah The subject meetings were held via conference call on Friday, January 23, 1987, and in Chattanooga, TN, on Thursday and Friday, February 5 and 6, 1987 to discuss the scheduling of Sequoyah issues among the NRC staff and TVA Sequoyah licensing personnel.
sDuring the meetings held in Chattanocga, TVA representatives stated that the target date for Sequoyah criticality was April 28, 1987, but that critical sath items identified could change this date. The staff stated that they
)elieved the TVA target date was optimistic and did not allow sufficient time for staff review.
The attachment incorporates the scheduling changes which resulted from the conference call and meetings.
I'/
hh i
B.
ungblo d, Director PWR P ject Directorate #4 DivisIonofPWRLicensing-A
Attachment:
As stated 4
8702190370 070212 F2DR ADUCK 0500 7
E j
s.
Distribution:
Ecket File ( Q NRC/PDR Local PDR PRC System.
PWRf4 Rdg'..
J. Holonich TAlexion BKSingh BJYoungblood HThompson, Jr.
HDenton JTaylor i
BHayes LSpessard SConnelly BGrimes KBarr, RII GZech,.RII CUpright, RII KHooks BDLiaw EImbro JKnight GHubbard TDecker CJulian, RII BWilson JBlake RShewmaker BCarrall LCrocker ABelisle, RIi RWessman LKelly j
i
-)
Mr. S. A. White Tennessee Valley Authority Sequoyah Nuclear Plant cc:
Tennessee Department of Public Regional Administrator, Region II Health U.S. Nuclear Regulatory Comission ATTN: Director, Bureau of 101 Marietta Street, NW.
Environmental Health Services Suite 2900 Cordell Hull Building Nashville, TN 37219 J. A. Kirkebo Mr. Michael H. Mobley, Director ATTN:
D. L. Williams Division of Radiological Health Tennessee Valley Authority T.E.R.R.A. Building 400 West Sumit Hill Drive, W12 A12 150 9th Avenue, North Knoxville, TN 37902 Nashville, TN 37203 Mr. Bob Faas County Judge Westinghouse Electric Corp.
Hamilton County Courthouse P.O. Box 355 Chattanooga, TN 37402 Pittsburgh, PA 15230 R. L. Gridley Tennessee Valley Authority SN 157B Lookout Place Chattanooga, TN 37402-2801 M. R. Harding Tennessee Valley Authority Sequoyah Nuclear Plant P.O. Box 2000 Soddy Daisy, TN 37379 Resident Inspectoi/ Sequoyah NPS c/o U.S. Nuclear Regulatory Comission 2600 Igou Ferry Road Soddy Daisy, TN 37379 H. L. Abercrombie Tennessee Valley Authority Sequoyah Nuclear Plant P.O. Box 2000 Soddy Daisy, TN 37379 l
I l
l 1
l ISSUES
SUMMARY
FOR SEQUOYAH ISSUE LEAD RESP.
PAGE SEQUOYAH 1.
Employee Concerns Program NRR 1
2.
Allegations NRR 4
3.
Welding NRR 5
4.
Design Control IE 7
5.
Electrical Design NRR 10 6.
Equipment Oualification IE 12 7.
Operational Readiness RII 14 8.
Regulatory Improvement RII 16 9.
Radiological Emergency Preparedness (REP)
RII 17
- 10. Operating Experience Improvements RII 19
- 11. Maintenance Program RII 20
- 12. Pipe Supports RII 21
- 13. Management Involvement RII 22
- 14. Training RII 24
- 15. Cable Tray Supports RII 25
- 16. Technical Specification Revisions NRR 26
- 17. Wrongdoing, Intimidation and Harassment OI 28
- 18. Corporate Activities NRR 29
- 19. CA Program RII 32
- 20. OIA Technical Referrals IE 33
- 22. Cable Pulling NRR 35
- 23. QTC Employee Concerns NRR 37
- 24. Surveillance Activities RII 38
- 25. NSRS Concerns and SWEC Issues NF.k 40 26 Other Technical Issues hRR 41
SEQUOYAH " PERT" CHART NOTES 1.
The following pages provide a preliminary
" PERT" chart for major regulatory activities at Sequoyah. The first page is an integrated schedule showing major issues and milestones.
Subsequent pages provide subroutines, showing detailed steps for each major issue identified on the integrated schedule.
2.
The key to individual items is shown below:
Title of issue Indicates detailed subroutine for this item WELDING Lead responsiblity for issue (office NRR 48 Workdays to complete or individual) task 01-11-P6 3-21-86 Start Date Finish Date 3.
Dark lines connecting individual items indicate the critical path.
SEQUOYAH Subject Area: TVA Employee Concerns As a result of a lack of confidence by TVA employees in their supervisor / manager willingness to address perceived safety issues, numerous (greater than 5,000) employee concerns have been identified which encompass potentially safety related, non-safety related, and intimidation / harassment / wrongdoing issues. TVA has been requested via the 50.54(f) letter of 9/17/85 to address the root cause(s) of this problem, their actions to resolve the problem, their actions to monitor the effectiveness of these actions and their actions to deal with all of the individual concerns.
TVA described their approach to resolution of employee con-cerns in the Corporate and Sequoyah Nuclear Performance Plans (Volumes 1 and 2). TVA decided in June 1986 to address all employee concerns and allegations, under the Watts Bar Special Program. Under this program, all concerns are grouped in 9 categories. All Sequoyah safety-related issues have been grouped into 6 categories.
Lead Responsibility:
NRR - 8. K. Singh TVA - M. Martin, F. Campbell Major Tasks:
Resources (Man Weeks)
Item Responnibility NRR/IE/RII 1.
Evaluate Employee Concern NRR/IE (Singh/ Hooks)
Complete Program submittals for new Watts Bar Special Program.
Prepare SER input on program (TVA submittal of 9/2/86) 2.
Start of Sequoyah management TVA reviews of investigation re-ports and development of corrective actions (8/19/86) 3.
Employee concerns Task Group TVA Complete, i.e.,
ccncurrenco with plant cor-action commenced, rective action proposals begins.
(10/15/86) 4.
Review / audit element NRR/IE/RII 145/90/114 reports approved by ECTG (Technical Program and inspect using staff Managers & NRR guidelines. Review schedule ProjectManagers) is shown on Attachment I and is based on TVA dates TVA needs to provide for element report sub-correlation of element mittals.
reports to NRC issue areas.._.
Resources (Man Weeks)
Item Pesponsibility NRR/IE/RII 5.
Sampling Review of management NRR(Singh) 4/0/0 and personnel, industrial safety categories (2/06/87) 6.
Review of QA aspects of ECTG IE/RII (Peranich) 3/6/3 Program Implementation and site v'isit (
)
7.
Comp 1. QA Reviews of selected IE (Peranich) 0/12/4 safety significant technical significant issues (
)
8.
TVA Submit cross-reference TVA between Employee Concerns and "Stello Plan" Categories (2/6/87) 9.
Issue SER for each Category NRR/IE/RII 5/5/5 by dates show on attached (Technical Program page.
Managers & NRR Project Managers)
- 10. Sampling Review of Watts Program Managers 3/5/5 Bar issues to assure Sequoyah issues covered - to be done as part of technical reviews under Item 4 (Examples: con-crete, material control, and control room design) (3/87 late)
)
13.
Issue integrated SER for NRR (Singh) 4/1/1 Sequoyah ECTG (4/30/87)
- 14. Reinspect new ECP IE/RII (Hooks) implementation (4/6-10/87) 15.
Survey of Employee Attitudes TVA toward management (
)
- 13. Commission Paper Input NRR (Reinhart)
(4/30 )..
Employee Concerns Element Reviews Date Element Date TVA Date TVA Element NRC Element Reports 50% of Last Dates Reports Program Reports Submitted Submittal Submittal Site SER Category Manager Required 01/28/87 w/ corr Action w/ corr Action Visit Complete Initial Final Engin::ering Ballard, NRR 96 75 T 01/15/87 01/31/87 02/87 04/17/87 Construction Hooks, IE 32 32 28 11/24/86 03/01/87 02/17-20/87 04/17/87
'/
03/2-6/87 Paterial ilulian, RII 12 11 9
11/?4/86 03/01/87 07/17-20/87 04/17/87 Control 03/2-6/87 OA Peranich, IE 15 9
8 01/15/87 03/01/87 03/87 04/17/87 Op: rations Barr, RII 59 59 59 12/04/86 01/31/87 02/17-20, 04/17/87 t
03/?-6, 03/16.20 Welding Liaw, NRR 41 38 38 12/10/86 03/01/87 c
03/13/87 SWEC Issues Barr, RII 57 56 56 12/04/86 03/01/87 03/13/87 NSRS Issues Singh, NRR
?
2 1
01/15/87 03/01/87 02/87 04/17/87. -
SEQUOYAH Subject Area: Allegations Allegations which may have safety significance have been made directly to the NRC concerning the Sequoyah Nuclear Plant.
Lead Responsibility:
NRR - T. Alexion TVA - M. Martin, F. Campbell Major Tasks:
Resources (Man Weeks)
Item Responsibility NRR/IE/RII 1.
TVA resolve Dallas Hicks issues TVA (1/15/87)
- 2.
TVA resolution of identified TVA
[ complete for allegations and responses to restart NRC letters dated 3/19/86,5/1/86, items 5/13/86, 8/1/86, 10/16/86 and 10/7/86) 12/12/86 (1/15/87) 3.
Verify Dallas Hicks, ;iP NRR(Alexion) 1/0/0 allegations, and other issues applicable to Sequoyah are correlated to ECTG element reports.
(2/87) 4.
Identification of items that NRR (Alexion) 1/0/0 must be resolved prior to startup (3/20/87) 5.
Verify technical reviews are NRR (Alexion) 1/0/0 complete and draft SER input prepared by technical reviewers (3/20/87) 6.
Prepare integrated allegations NRR (Alexion) 1/0/0 SER Input (3/27/87) 7.
Prepare responses to allegers NRR (Alexion - coord.)
2/0/1 NRR repsonse to D. Hicks (4/10/87)
RII response to other allegers (4/10/87) 8.
Commission Paper Input (4/30/87)
NRR (Reinhart)
- TVA letters of 11/26/86 and 12/22/86 provide correlation to old and new employee concerns programs. Will be future correlation updates.
Items in letters of 5/1/86, 5/13/86, 8/1/86, 10/16/86, 12/12/86 and 1/15/87 l
included in new ECP..- -
SEQUOYAH Subject Area: Weldina 1.
As a result of an investigation of employees' concerns con-ducted by a TVA contractor at Watts Bar, more than 500 issues were identified that are related to welding of safety related steel structures at TVA facilities.. There were also some allegations by employees made directly to the NRC. The issues concerning welding at Watts Bar can be categorized as follows:
- improper or falsified inspections;
- inspectors and welders qualification;
- welding filler materials (weld rod) control; and
- regulatory comitments to certain industry codes governing structural steel welding.
2.
Approximately 136 concerns were identified to be applicable to Sequoyah Units 1 and 2 and, therefore, need to be re-solved for the restart of Sequoyah units.
Lead Responsibility: NRR - B.- D. Liaw TVA - R. Shell The NRC Task Group on Welding at TVA (under NRR lead) will have the overall lead responsibility. The Task Group consists of the following:
B. D. Liaw - NRR representative and the overall manager; R. L. Spessard - I & E representative A. R. Herdt - Region II representative D. E. Smith is responsible for internal NRR review for i
Sequoyah.
Major Tasks:
Resources (Man Weeks)
Item Responsibility NRR/IE/RII l
l 1.
NRC staff review (incl. TVA NRR Complete actions resulting from NDE Van inspection) complete (9/19/86).
Resources (Man Weeks)
Item Responsibility NRR/IE/RII 2.
Review a sample of employee NRR(Liaw)
Complete concerns related to welding at Sequoyah to insure that they have been properly accounted for in TVA'a program, including disposition.
(3/13/87) 3.
Welding SER input completed NRR(Liaw)
Complete and circulated for coment (9/19/86).
4.
Resolve coments and issue NRR(Youngblood)
Complete draft welding SER (11/14/86).
5.
TVA response to Welding SER TVA and comitment to implement staff requirements (1/30/87).
6.
Staff evaluation of TVA NRR(Liaw) comitments and issue Final SER (3/13/87).
7.
Followup inspection of IE/RII/NRR 1/1/1 remainina open issues (3/13/87).
8.
Comission Paper Input NRR(Reinhart)
(
)
4 1
SEQUOYAH Subject Area:
Desion Control Questions have been raised regarding the adequacy of the existing design control process as well as the adequacy of the previously implemented design process and plant configuration control
- The staff must evaluate the TVA design control process described in the Nuclear Performance Plans (Vol. I and 2).
Lead Responsibility:
E. Imbro, Technical Lead, IE TVA - M. Burrynski Major Tasks:
Resources (Man Weeks)
Item Responsibility NRR/IE/RII 1.
NRC site visit and evaluation NRR/IE 4/0/0 of TVA alternate analysis ap-proach and evaluation of interim acceptance criteria (Compl. 10/10/86) 2.
TVA responds to NRC questions TVA of 9/9/86, and 9/29/86 including alternate analysis.
a.
Design Baseline Overview (12/31/86)
Complete
- b. -Anchor Point Movement (10/31/86)
Complete c.
Revised criteria for small bore piping and pipe supports (11/7/86)
Complete d.
Cable tray supports, interim acceptance criteria (11/14/86)
Complete e.
Calculations Review Program (1/20/87)
Complete f.
Schedule for implementation of final acceptance criteria, Phase two of the program.
(2/28/87) 3.
Inspect implementation of DBVP NRR/IE/RII 4/20/4 and associated Engineering Assurance Independent Oversight and issue related inspection reports (to be done when TVA is 2/3 complete)
- Completion of Design Control effort dependent on TVA submittal and staff evaluation of TVA investigation of related employee concerns.
~.
4 Resources (Man Weeks)
Item Responsibility NRR/IE/RII a.
Inspect Program Plans complete and Walkdowns b.
Inspection of Comitment/
Complete Requirement and Revising /
Updating of Design Criteria c.
Inspection of Engrg. Change Complete Notice and Electrical Test Results Evaluation i
d.
Inspection of Calculation 0/16/0 Review Program to Support DBVP (wks of 2/2/87 and 2/9/87)
- e. ~ Inspection of System Evaluation 0/16/0 and TVA Design Control Correc-tive Actions (wks of and 3/2/87 and 3/9/87) 4 Issue draft SEP, on DBVP -
NRR Complete based on IE input 1/?0/87 5.
Issue draft SE on alternate NRR Complete analysis 12/86 6.
Issue draft SE on Cable NRR Complete Tray Supports 7.
Issue draft SE on Calculations IE Program (2/27/87) 8.
TVA response on staff draft TVA SERs on DBVP, alternate analysis (1/22/87) and Cable Tray eccentricity (2/20/87) 9.
Staff evaluate TVA response and IE Complete provide update for draft SER (3/6/87)
- 11. Evaluate a sample of employee NRR/IE/RII 1/1/0 concerns related to design control and configuration l
control as identified by NRR Technical Program i
Manager to assure they are properly accounted for and resolved (4/10/87)
l Resources (Man-weeks)
Maior Tasks:
Responsibility NRR/IE/RII
- 12. Final staff evaluation of TVA IE/NRR Response and Phase Two descrip-
-tion and issue Final SER (4/17/87)
- 13. Prepare Commission Paper NRR (Refrhart) input (4/87)
. R
SEQUOYAH Subject Area:
Electrical Design Evaluate the electrical design issues raised at Sequoyah and described in the Nuclear Performance Plan (Vol. 2). These are summarized below:
1.
The licensee has not maintained adequate documentation of many electrical calculations which were performed to support plant design changes.
Involves most AC and DC power systems.
2.
Question as to the adequacy of station onsite electrical distribution system design and the safety implication as a result of unconfimed design changes.
3.
The present onsite distribution system configuration meet all the requirements for safe startup/ operation and ac-cident mitigation.
4.
Concerns have been raised regarding cable ampacity.
5.
Other concerns include diesel generator overloading, in-strument accuracy, containment penetrations, and short circuits.
Lead Responsibility: NRR/EICSB - J. Knight TVA - M. Burzynski Major Tasks:
Resources (Man Weeks)
Item Responsibility NRR/IE/RII 1.
TVA address NRC SER TVA Complete on PSB-1 Testing (12/3/86) 2.
NRR Evaluate PSB-1 NRR (Knight)
Complete submittal (12/9/86) 3.
Staff SER on PSB-1 Response NRR (Holonich)
Complete (12/13/86) 4.
TVA evaluate ampacity problems TVA Complete and provide Program Plan for sampling. (12/23/86) 5.
TVA evaluate ampacity issue TVA and provide program sumary and results to NRC (2/20/87)
Resources (Man Weeks)
Item Responsibility NRR/IE/RII 6.
NRR evaluate ampacity issue, NRR(Knight)
TVA Sample Program and TVA Results, Frepare SER input (2/27/87) 7.
TVA submits information on TVA Complete other electrical design issues in 95 sets (12/29/86) 8.
TVA development of corrective TVA Complete actions from electrical calculations issues (12/29/86) 9.
Complete draft SER regarding NRR (Knight) 8/0/0 adequacy of licensee's reanalysis program for all electrical design areas (3/13/87) 10.
Issue draft SEP, to TVA NRR (Holonich)
(3/20/87)
)
- 14. Staff inspection of ampacity mods RII and post modification testing
(
)
- 15. Connission Paper input (
)
NRR (Reinhart)
SEQUOYAH Subject Area:
Equipment Qualification As described in the Nuclear Perfomance Plan, TVA's imple-mentation of the Equipment Oualification Rule,10 CFR 50.49, at Sequoyah 1 and 2 does not comply with the regulations.
Lead Responsibility:
IE - Hubbard TVA - G. Kirk Major Tasks:
Resources (Man Weeks)
Item Res)onsibility NRR/IE/RII 1.
NaTuate a sample of employee IE/iRR/RII 0/1/0 concerns related to EQ to assure they are properly accounted for and resolved by TVA (
)
2.
Ray chem heat shrinkable splices
- Staff Inspection IE Complete
- TVA complete splices (
)
- Staff review (3/87)
IE(Hubbard) 3.
Perform additional EQ IE(Hubbard)/RII Complete inspection concerning maintenance concerns (12/8/86) 4.
Complete EQ SER, subject IE (Hubbard)
Complete to final EQ inspection and pre-viousSERinputeffort(Complete) 5.
Issue SER (12/5/86)
NRR(Holonich)
Complete 6.
TVA Submit 50.49 certification TVA and response to draft SER confirmatory items (2/20/87) a.
Field work complete (3/27/87) b.
Binders complete (4/10/87) c.
Confirmatory items (3/27/87) 7.
Final SER (
)
8.
Staff evaluation of TVA response IE (3/20/87) 9.
Perform followup inspection to IE 1/2/2 confirm corrective actions and completion of cutstanding items (4/10/87) l -
10.
Issue final inspection report for IE/NRR/RII 2/4/2 followup inspections. (4/87)
- 11. Comission Paper Input (
)
NRR(Reinhart)
)
I 8
l l
i i l l
l
l-SE000YAH Subject Area: Operational Readiness To assess TVA's management and implementation of programs, corrective actions, and commitments described in the Sequoyah Nuclear Performance Plan to assure the plant is ready to resume operations.
In particular, the areas of regulatory improvement, management involvement, operating experience, maintenance, pipe supports, training, and plant readiness for startup will be assessed and acceptability verified.
Lead Responsibility: Region II - Barr TVA - M. Burzynski, G. Kirk Major Tasks:
Resources (Man Weeks)
Item Msponsibility NRR/IE/RII 1.
TVA perfom necessary modification TVA Complete for SCR 84-09 2.
Inspection of FCR 84-09.
RII (Herdt)
(3/9-13/87) 3.
Containment isolation valve design to meet GDC 55
(complete)
- b. NRC meeting (8/15/86)
NRR 2/0/0
- c. Resubmit 5/30/86 letter TVA Complete (12/31/86)
- d. TVA exemption requests TVA (2/6/87)
- e. NRC review (3/5/87)
NRR 2/0/0 4.
TVA resolve CCS Inleakage TVA (1/30/87) 5.
RII confim CCS Inleakage RII 0/0/1 corrective action adequate
(?/27/87) 6.
Fuse Replacement Program (Replace KAZ with MISS fuses); replace MIS-5 with Littel Fuse Company Fuses a.
TVA 50% complete (3/6/87)
TVA b.
Region Inspection (3/13/87)
RII c.
TVA complete program (3/17/87)
TVA d.
Followup inspection (4/87)
RII.
__ J
Resources (Man Weeks)
Item Responsibility NRR/IE/RII 7.
TVA submit Site Operational TVA Readiness Program and Interim Ops Readiness Report (
)
8.
Evaluate TVA Program and Interim RII(Barr)
Report 9.
Intergrate draft SER on NRR(Holonich)
Operation Readiness (
)
10.
Issue _ draft SER on operation NRR(Holonich) readiness'(
)
(
-)
)
- 13. Commission Paper Input (
)
NRR (Reinhart) 4 a.-
SE000YAH Subject Area: Reoulatory Improvement TVA comitted in their response to the 50.54(f) letter to imple-ment various actions to improve their regulatory performance and monitor future performance, as described in their Nuclear Per-formance Plan.
Lead Responsibility: Region II - Barr TVA - G. Kirk Resources (Man-Weeks)
Major Tasks Responsibility NRR/IE/RII 1.
TVA review Post Modification TVA Testing on 37 systems and make submittal to RII (incl 119 retests) (2/28/87) 2.
Complete inspections and Update RII (McCoy)
SER input in following areas:
- Post-inodification testing Resident inspection (3/31/87)
- Security degradations (12/15/86) RII Complete 3.
Team conduct modified IE(Konklin) 0/32/0 Safety System Outage Modification
$150,000 Inspection (SS0MI).
- Review installation of Complete selected modifications (1/12-23/87)
- - Review testing of selected l
modifications (3/16-27/87) l 119 Retests Cable pulling Raythem splicing I
- Note: Requires TVA to make appropriate work packages available l
SEQUOYAH Subject Area: Radiological-Emergency Preparedness (REP)
Evaluate the effectiveness of the emergency preparedness items described or comitted to in the Sequoyah Nuclear Performance Plan including implementation of the revised Sequoyah Nuclear Plant Radiological Emergency Plan and an evaluation of the program enhancements included in the areas of emergency organization and emergency facilities and equipment.
Lead Responsibility:
Region II - T. Decker TVA - D. Lambert, G. Kirk Major Tasks:
Resources Item Responsibility (Man Weeks) 1.
Review regulatory significant items identified in the Sequoyah Nuclear Performance Plans as enhancements to the REP program as follows:
a)
Emergency Organization /
Accident Assessment Con-solidation of Dose Assess-ment Staff into the Central Emergency Control Center (CECC) t (1)
Inspect revision to RII Complete i
the emergency plan (See 1 above)
(Complete ?/3/86)
(2) Review the effective-RII 7 (Total exercise) ness of the new dose (2 - RII) assessment staff during (4 - Contractor the annual emergency Support) exercise - (November 19, (1 - IE) l 1986 - Not required for restart) b)
Emergency Facilities and l
Equipment:
(1) Review modification's RII 75% complete; 4
made to satisfy criteria remainder of NRC bulletin 79-18, following plant
" Audibility Problems restart Encountered on Evacuation of Personnel from High-noise Areas" - following plant restart (6/87)
Resources (Man-Weeks)
Major Tasks Responsibility NRR/IE/RII (2) Review of the SPDS RII (EICSB)
Complete description.
Documentation via SER (3/13/87)
(3) site visit for control room emp oyee concerns
(
c)
Annual emergency exercise RII Resources November 1986.
(Notrequired identified in forrestart) 2.a(2) above 2.
Conduct a pre-appraisal of RII 3
emergency response facilities (ERFs) - Following restart 3.
Conduct an appraisal of ERFs to RII 6
determine acceptability using (1 - RII)
Supplement 1 to NUREG-0737 and (1-IE) the draft TI - Following restart (2 - NRR)
Confirm RII/NRR satisfied.
(2 - Contractor Support) 4.
Update SER input to RII document acceptability of actions required for restart (1/30/87) l l
l
SEOUOYAH Subject Area: Operating Experience Improvements Evaluate TVA management controls and programs associated with feedback of operational experience information.
Lead Responsibility: Region II - Barr TVA - R. Shell, M. Burzynski Resources (Man-Weeks)
Major Tasks Responsibility NRR/IE/RII 1.
Conduct a followup inspec-RII tion of various functional areas including operations, maintenance, training, engineering, and TVA Corporate offices. Assess the effectiveness of TVA dissemination and use of operational experience information.
2.
Provide updated SFR input.
RII Confirm complete.
RII/NRR Complete i
t l
t
- i l
I
SEQUOYAH Subject Area: Pipe Supports As a result of Region II Inspection on December 16 - 70, 1985, Report No. 50-327,328/85-49, a violation concerning pipe support inspection and installation was identified.
Evaluate TVA approach, as described in the Nuclear Performance Plan (Vol.2).
Lead Responsibility: Region II - Blake' TVA - M. Burzynski Resources (Man-Weeks)
Major Tasks:
Responsibility NRR/IE/RII ITEM 1.
Inspect licensee's corrective RII (W. Liu)
Complete actions and evaluate generic considerations as it relates to hardware installation (11/17-21/86) 2.
Revise SER input previously RII Corplete provided to NRR (12/12/86) 3.
Issue inspection report RII Lomplete (1/23/87) l l.
[
SEQUOYAH Subject Area: Management Involvement TVA must increase management involvement to enhance operational performance, as described in the Nuclear Performance Plan (Vol. 2).
Lead Responsibility:
Region II - Barr TVA - G. Kirk, D. William Resources (Man-Weeks)
Major Tasks Responsibility NRR/IE/RII 1.
Supplemental response to PORC-IE TVA report 86-46 dated (1/23/87) 2.
Review corrective actions to RII (McCoy) improve the effectiveness of the Plant Operations Review Committee Follow-up on PORC corrective 0/0/3 actions (2/27/87)
SER Update (3/13/87)
Inspection Report (3/31/87) 3.
TVA implement ALARA improvements TVA Complete (IFI 86-36-02) (1/20/87) 4.
TVA implement HP Organization TVA Complete changes (IFI 86-36-03) (1/20/87) 5.
Review management control of RII(Hosey) 0/0/6 the radiation protection program including contamination control and ALARA activities Conduct followup inspection (1/23/87)
Provide final SER input (Including evaluation of employee handbook)(2/87).
Issue final inspection report (2/87) 6.
NRC Order EA 85-49 and Contain-ment Pressure Transmitters a.
TVA response to 5/5/86 TVA letter from Taylor (7/2/86)
RLG to J. Taylor (complete) b.
Implement DNQA upper tier TVA document changes into site /
DNE SCR procedures (2/27/87) l i
Resources (Man-Weeks)
Major Tasks Responsibility NRR/IE/RII c.
NRC inspection of NCR/SCR IE(McKee) 2/3/2 processing (3/13/87) d.
NRC completion of Task 13 IE(Shewmaker)
Complete (OIA Tech Referals) (1/31/87) e.
NRC close ORDER (3/31/87)
IE (McKee) 1.
1
! t
SEQUOYAH Subject Area: Training Assess the overall adequacy of qualifications and training of the plant operating staff.
Lead Responsibility: Region II - Julian TVA - G. Kirk Resources Major Tasks:
Responsibility (Man-Weeks) 1.
Recheck Operator requalif. as Region II Complete part of regular cycle (12/86) 2.
Revise final SER to NRR on Region II training) activities (Julian)
(2/27/87 4
l l
i SEQUOYAH i
Subject Areas: Cable Tray Supports Followup on cable tray seismic support issues identified in Inspection Report No. 50-327,328/85-29, and evaluate TVA program described in Nuclear Performance Plan (Vol. 2).
Lead Responsibility:
Region II (Blake)
TVA - M. Burzynski Resources (Man-weeks)
Major Tasks:
Responsibility NRR/IE/RII 1.
Prepare SER Inputs (3/31/86)
RII complete (complete 3/20/86) 2.
Issue draft SER (1/30/86)
NRR (Holonich) 3.
(TVA response not required) 4.
Comission Paper Input (
)
NRR (Reinhart)
~
i l
l l
l l
SEQUOYAH Subject Area: Technical Specification Revisions Technical Specification Revisions are in process. One is related to the proposed organizational changes at TVA and Sequoyah facility. The remaining are routine in nature.
Lead Responsibility: NRR - J. Holonich TVA - M. Burzynski Major Tasks:
Resources (Man Weeks)
Item Responsibility NRR/IE/RII 1.
Organizational Revisions NRR/ FOB 1/0/0 i
(a) TVA revise TS (5/9/86) (complete)
(b) Review offsite organization for facility management and technical support (12/10/86)
(c) Review facility organization (d) Prepare SER for the issuance of TS (
)
(e) Issue amendment package NRR (Holonich)
(depends on Corp SER)
(3/31/87) 2.
Deletion of Diesel Generator 1/0/0 Start on SI Coincident with Blackout a.
TVA submit T.S. change TVA proposal (complete) b.
NRC review (9/10/86)
NRR c.
NRC prepare SER (9/18/86)
NRR-d.
Issue amendment package NRR (Holonich)
(1/31/87) 1 3.
Reactor Trip Breaker Testing 2/0/0 1.
(NOTE: Approval not required for restart) a.
TVA submit T.S. change TVA proposal (complete) b.
NRC review (complete)
NRR c.
Questions to TVA (complete)
NRR d.
Submitt T.S. change (1/16/87) TVA Complete e.
NRC prepare SER (2/1/87)
NRR f.
Issue amendment package NRR (Holonich) 4 (3/1/87). -
Resources (Man-weeks)
Major Tasks:
Responsibility NRR/IE/RII 4.
Centrifugal Charging / Safety 1/0/0 Injection Flow Requirements a.
TVA submit T.S. change TVA proposal (complete) b.
NRC review (9/15/86)
NRR c.
TVA supple, response TVA (12/15/86)
Complete d.
Issue amendment package NRR (Holonich)
Complete 5
Changes Resulting from 1/0/0 Surveillance Instruction Adequacy. TVA adequacy review (9/12/86) a.
TVA submit T.S. change TVA proposal on electrical calculations.
(1) spray pump times (12/17/86)
Complete (2) Electrical brakes on MOVs (changes in travel time)
TS #75 (12/86)
Complete b.
NRC review (2/14/87)
NRR c.
NRC prepare SER (2/14/87)
NRR d.
Issue amendment package NRP.
(3/13/87).
SEQUOYAH
-Subject Area: Wrongdoing, Intimidation, and Harassment Issues Investigate alleged or suspected instances of wrongdoing, intimidation, or harassnent of TVA employees or contractors by TVA managers or supervisors Lead Responsibility: Office of Investigation (0I)
TVA - M. Martin Resources Major Tasks:
Responsibility (Man-Weeks)
I.
OI Tasks 1.
Start (1/11/86)
OI N.
Finish (3/31/87) 01 II. Other I&H Tasks 1.
Response to TVA Letter of 8/15 on I&H TVAPS Complete (10/14/86) 2.
Inspect TVA management of I&H concerns TVAPS (2/28/87) 4.
SER Input on Intimidation and TVAPS l
Harassment (3/13/87)
(Richardson) t l
l
SE000YAH Subject Area: Corporate Activities Certain corporate issues must be resolved prior to the restart of Sequoyah. These issues include: establishment of a commit-ment tracking system, increased involvement of the TVA Board, management changes, and changes to the program of 0A audits.
Note: Reviews in this area delayed, pending TVA submittal of revision to Corporate Programs.
I.
Board Actions The TVA Board of Directors and Board members are not sufficiently informed and involved in nuclear plant performance to provide corporate oversight, direction and support of nuclear activities.
Lead Responsibility: NRR - L. Crocker TVA - R. Alsup Major Tasks:
Resources (Man Weeksi Item Responsibility NRR/IE/RII 1.
Review Revision 2 to Corporate NRR (Crocker)
Complete Plan and Revise SER based on 7/17/86 submittal (8/79/86 -
Complete) 2.
TVA organizational changes TVA Complete and submittal in response to OGE concerns (12/4/86) 3.
Review changes (1/30/87)
NRR 4.
Review applicable employee NRR 1/0/0 concerns and prepare SER input.
(2/13/87)
II. Management Changes Management changes are needed to strengthen TVA regulatory performance, l
including retaining additional experienced personnel to upgrade TVA's corporate performance.
Lead Responsibility: NRR - L. Crocker Ma,ior Tasks:
Resources (Man Weeks)
Item R s,ponsibility NRR/IE/RIT 1.
Review Revision 2 to Corporate NRR (Crocker)
Complete Plan and Revise SER based on 7/17/86 submittal (8/29/86 -
Complete). _. _
Resources (Man Weeks)
Item Responsibility NRR/IE/RII 2.
TVA respond to 6/27/86 NRC TVA complete request for INP0 and contractor evaluations (files to be set up by 9/11/86) 3.
Evaluate TVA response of NRR complete 9/24/86 to ACRS letter of 8/12/86 (11/24/86) 4.
Evaluate INPO Report NRR complete (11/24/86) 5.
TVA Revise Vol. I to reflect TVA complete contract manager changes.
(12/4/86) 6.
TVA Submit Revision 4 (2/28/87)
TVA 7.
ReviewManagerchanges(3/13/87)
NRR(Crocker) 8.
TVA provide information on TVA sub-tiers of organization (2/28/87) 9.
Complete Peview of TVA submittals NRR and applicable employee concerns.
Revise draft SER (3/20/87)
III. Commitnent Tracking System TVA lacks a integrated commitment tracking system that provides assurance that NRC commitmer.ts are tracked and responded to. Plant operational offices and sites have individual tracking systems but they do not assure integration of all regulatory commitments.
Lead Responsibility: RII - Barr Major Tasks: Complete s
- 3C -
Resources (Man Weeks)
Item Responsibility NRR/IE/RII IV. QA Audits TVA lacks a program for escalating OA Audit findings to the appropriate levels of management to assure timely resolution of those findings.
Lead Responsibility:
RII - A. Belisle Major Tasks:
Resources (Man Weeks)
Item Responsibility NRR/IE/RII 1.
Sequoyah implementation RII 0/0/6 reinspected 7/9-11/86.
Additional inspections:
9/29-10/3/86 - (complete) 2.
Inspection Report and questions Complete to TVA (11/24/86) 3.
TVA response on corrective TVA actions (2/16/87) 4.
RII Followup inspection and RII evaluation on TVA management of CA Qs (3/7/87) 5.
Update SER input (3/20/87)
RII 0/0/1 V.
Completion Tasks Resources (Man Weeks)
Item Responsibility NRR/IE/RII 1.
Revise and circulate Draft NRR (Holonich)
Corporate SER (3/20-3/31/87) 2.
Issue Draft Corp SER (3/31/87)
NRR 2/0/0 3.
TVA Corp. Assessment of Corp. &
TVA Site Readiness (
)
4.
TVA Response to draft Corp. SER TVA (4/15/87) 5.
NRC assessment of TVA imple-RII 1/1/2 mentation of Corp. Commitments and management changes (
)
6.
Final SER (
)
NRR,
SEQUOYAH Subject Area:
Quality Assurance Procram Evaluate TVA's Quality Assurance program enhancements at Sequoyah and TVA corporate offices, and assess program described in Nuclear Performance Plan (Vols. 1 and 2).
Lead Responsibility: Region II - Belisle TVA - G. Kirk Resources (Man Weeks)
Major Tasks Responsibility NRR/IE/RII 1.
TVA Response to staff questions TVA Complete and revision to QA Topical (12/87) 2.
TVA submit additional details on TVA assurance program.
(1/23/87) 3.
Review QA Topical, QA portion IE/RII (Imbro)
Complete of Vol. II and revise SER input (1/30/87) 4.
TVA develop interim NQAM TVA Complete implementing procedures (1/21/87) 5.
Inspect interim procedures RII/IE Complete (1/16/87) 6.
TVA ready for implementation TVA inspection (early April 87)
I 7.
Conduct a team inspection RII/IE (Relisle) 0/6/6 to assess the implementation of the Corporate and Sequoyah Nuclear Plant QA Programs.
(late April 87) 8.
Prepare Commission Paper NRR (Reinhart)
Input (
)
9.
Complete final inspection RII 0/2/2 report (
)
i I _. - _.
SE000YAH Subject Area: DIA Technical Referrals Follow-up on items referred from OIA in a January 22, 1986 transmittal.
Lead Responsibility:
IE (Shewmaker)
TVA - D. Williams Major Tasks:
Pesources (Man Weeks or $)
Item Responsibility IE 1.
Start (01/27/86)
IE 2.
Finish Inspection IE (Shewmaker)
Complete 3.
Issue Inspection Report IE Complete and Notice of Violation (1/31/87) 4.
TVA Response (2/27/87)
TVA 5.
Inspect TVA Action IE (3/31/87)
\\
I l
- 1
SEQUOYAH Subject Area: Superheat Transient Following High Energy line Break Evaluate Sequoyah program (and modifications in equipment and procedures) for withstanding a superheat transient following a high energy line break.
Lead Responsibility: NRR - J. Holonich TVA - M. Burzynski Resources (Man Weeks)
Ma,ior Tasks Responsibility NRR/IE/RII 1.
Contractor evaluates, prepares Complete draft report on COBRA Validation Program (8/29/86) 2.
Staff issues RAI on TVA Heat NRR Complete Transfer Model and critical component selection (11/15/86) 3.
NRC issue Draft SER (11/25/86)
Complete 4.
TVA submit information on TVA Complete critical components selection (12/23/86) 5.
Staff questions to TVA (1/20/87)
NRR Complete 6.
Conduct additional transient NRR analysis (compact code) of heat transfer characteristics for certain equipments in harsh environment (1/31/87)
Meeting week of 1/2' 7.
TVA response to staff q'Jestions TVA (2/17/87) 8.
Contractor analyzes critical NRR
($10,000) components and complete final TER(3/13/87) 9.
NRC issues SER on Heat Transfer NRR (Holonich) 1/0/0 and Thermal lag portion of Transient (3/31/87) 10.
Commission Paper Input NRR (Reinhart)
(
),
SEQUOYAH Subject Area: Cable Pullino Evaluate adequacy of cable pulling program at Sequoyah.
Lead Responsibility: NRR (Alexion)
TVA - M. Burzynski Resources (Man Weeks)
Major Tasks Responsibility NRR/IE/RII 1.
NRC site audit at Sequoyah NRR (Knight, Conion) 3/0/3 (9/22-26/86) (Complete 9/24)
($20,000) 2.
Cable Bend Issues
- Cable Bend Questions to NRR TVA (Complete 8/29/86)
- TVA partial response to TVA Complette Cable Bend Ouestions-(10/31/86); Rest of response (12/8/86)
- Review Cable Bend Responses NRR (2/13/87) 3.
Sidewall Pressure Issues
- Sidewall Pressure Questions NRR to TVA (8/29/86)
- TVA partial response to TVA Corplete sidewall pressure questions (10/31/86); Rest of response (12/8/86)
- Review sidewall pressure NRR responses (2/13/87) 4.
Issue staff position regarding NRR(Holonich)
Complete cable inspections and modifications (1/16/87) 5.
TVA provide proposed inspection /
TVA test program to Sequoyah 2 restart and identify modifications schedule (
)
6.
Issue contractor report (2/27/87) NRR 1/0/0 7.
Issue draft staff SER (3/13/87)
NRR (Holonich) 2/0/0 8.
TVA conduct testing (3/87)
TVA I
-4 Resources Major Tasks Responsibility (Man W'eks) e 9.
TVA submit test report and TVA resranse to draft SER (4/87) 10.
)
12 Commission Paper Input (
)
NRR (Reinhart) j i
n
_ - _. _ _ _ _ _. _ _ - -. _. ~. _ - _ _ _ _. _ _ _ _ _., _. - _ -.
SEQUOYAH Subject Area: QTC Employee Concerns Dissolution of contract between QTC and TVA resulted in NRC copying and implementing program for evaluation of QTC employee concerns from Watts Bar that may be safety-related or of interest to the staff.
Several hundred of these concerns are expected to be applicable to Sequoyah. Resolution of many of these concerns will be re-quired prior to Segoyah restart.
Lead Responsibility: NRR - S. Richardson TVA - M. Martin Resources (Man Weeks)
Maior Tasks Responsibility NRR/IE/RII 1.
Staff evaluation of Sequoyah NRR/IE (TBD) packages that cannot be sanitized and sent to TVA. These will be integrated with employee concerns, allegations, and NSRS concerns review effort insofar as possible.
(
)
2.
Commission paper on sanitization IE(Peranich) 0/3/0 effort (Complete) 3.
Followup as required l
4.
SE000YAH Subject Area: Surveillance Activities As a result of NRC identified deficiencies in Sequoyah's Technical Specifications (TS) surveillance testing in March 1986 (Inspection Reports 50-327,328/86-20 and 86-26), TVA is undergoing a program to review the technical adequacy of Sequoyah's surveil-lance instructions.
Lead Responsibility: Region II - Barr TVA - G. Kirk Resources g
Major Tasks:
Responsibility (Man-Weeks) 1.
Issue Inspection Reports and RII (Carroll) 0/1/1 enforcement conference results (Completed 10/3/86) 2.
ASME Section XI pump and valve program review a.
TVA submittal of Section XI TVA complete changes te NRC (previous submittals 8/1/85 RHR to Adensam, 8/16/85 JAD to Adensam, 6/6/85 RLG to BJY)
(8/2/86) b.
TVA identify restart items TVA complete (complete) c.
NRC review (9/11/86)
NRR d.
Meeting with NRC to resolve NRR differences (9/12/86) e.
NRR complete f.
TVA Response to RAI complete 9
NRC review and approval (13 issues NRR important to restart) (12/14/86) h.
TVA requests relief for TVA complete additional issues (12/31/86) 1.
NRC review and approve (3/13/87)
NRR 3.
Snubbers review a.
NRC inspection (11/12-14/86)
RII (Blake) 0/0/3 b.
TVA infonns NRC of completion TVA of snubber evaluation (
)
c.
Followup inspection (
)
RII (Blake) _-____
(
Resources Major Tasks:
Responsibility (Man-Weeks) 4.
Inspect / evaluate Phase II of Region II Sequoyah's TS Surveillance (Shymlock)
Review Program, Operability "Look Back" Review, and Molded Case Circuit Breaker Testing.
a.
Surveillance Review
-TVA Submit program (2/27/87)
RII
- TVA 35 to 50% complete TVA (2/27/87)
- RII Inspection (3/8-15/87)
RII
- Issue SER (3/31/87)
RII
- TVA 100% Complete (4/4/87)
- RII Final Inspection (4/87)
RII b.
Operability "Look Back" Review
- TVA Perform Review (2/87)
- RII Inspect / Evaluate (3/8-15/87) RII
- Issue SER (3/31/87)
RII c.
Molded Case Circuit Breaker Testing (2/87)
- TVA Perform Testing (3/8-15/87)
- RII Review / Inspect RII d.
Issue Report (4/87)
RII 5.
Commission Paper Input NRR
(
)
(Reinhart)
SEOUYAH Subject Area: NSRS Concerns and Stone Webster (SWEC) Issues The NSRS reports contain information germaine to issues raised by the ERT program, allegations and H. Myers' concerns. There-fore, these reports are being reviewed to provide additional information for the review of the issues raised on TVA facilities.
SWEC raised issues as part of their review of TVA.
Lead Responsibility: NRR - B. K. Singh TVA - M. Martin Resources (Man-Weeks)
Major Tasks Responsibility NRR/IE/RII 1.
TVA provide study of generic TVA Complete applicability to Sequoyah and evaluate against NPP, Vol. 2 (Sequoyah). (11/26/86) 2.
TVA provide element reports:
- NSRS, 2 reports (12/23/87)
- SWEC, 57 reports (1/31/87) 3.
Conduct Corp. and site audits NRR/IE/RII 3/8/0 to evaluate NSRS/TVA resolution of selected items that are closed in NSRS reports, a.
Procurement IE Complete b.
Other (2/3/87)
NRR/IE/RII 4.
NSRS issues contained in Draft reports or not completed at time NMRG was created
- TVA provide sumary TVA Complete
- Staff evaluate (2/20/87)
NRR l
S.
SWEC Issues Review (2/27/87)
NRR/RII 6.
TVA provide correlation of TVA NSRS and SWEC reports to l
each issue area (
)
7.
Prepare SER input (4/17/87)
NRR (Singh) 3/2/0 8.
Prepare Commission Paper Input NRR (Youngblood) 1 l
SEQUOYAH Subject Area: Other Technical' Issues Technical issues have been raised by the staff or TVA and, in some cases, are addressed in the Nuclear Performance Plan.
These issues have not been specifically identified in other areas and are listed below.
Lead Responsibility: NRR - Joe Holonich TVA - M. Martin Resources NRR/IE/RII Major Tasks:
Responsibility (Man-Weeks) 1.
Sensing Line Slope NRR (Singh) a.
Element Report Submitted by TVA (Complete)
Review element report, TVA resp. to RAI, NPP Section 7.1, and prepare draft SER (2/27/87) b.
NRR (Holonich) c.
TVA (Martin) 2.
Compression Fittings #17304 RII (McCoy) a.
TVA submit results of TVA (Martin)
Complete evaluation b.
Review NPP Section 7.2 and Complete prepare draft SER (1/31/87) c.
Provide revised SER (
)
1 3.
Teflon Tape #30901 a.
TVA submit results of TVA(Martin)
Complete evaluation (11/24/86) b.
Prepare draft SER input on NPP RII (McCoy)
Complete Section 7.3. (12/1/86) c.
Prepare final SER on IE(Hooks)
Teflon Tape element report (
)
4.
Fire Protection / Appendix R RII(Conlon) a.
Review NPP Section 8.0 and prepare SER (11/21/86) l l
b.
Complete c.
Staff evaluate and revise RII Complete SER (12/86) 5.
Materials Traceability RII (Julian) a.
Final Element report No.40-703 submitted by TVA b.
Review element report, site inspection, and prepare SER (
) L
Resources (Man-weeksi Major Tasks:
Responsibility NRR/IE/RII 6.
Air Return Fan Design Problem a.
TVA proposes design change TVA (Burzynski)
(
)
b.
Complete modification TVA
(
)
c.
Inspect (
)
RII 7.
Piece Parts Procurement IE (Baker) a.
Staff Inspection IE Complete b.
Meet with TVA to discuss TVA corrective actions c.
TVA submit corrective action TVA plan (
)
d.
Staff review of corrective action (
)
NRR 8
Raychem Cable Splices NRR In Cable Trays a.
TVA Submittal (
)
TVA (Burzynski) b.
NRR Evaluate (
)
NRR c.
Region Inspect (
)
RII d.
Complete rework (3/24/87)
TVA (Kirk) e.
Close CAR (4/17/87)
TVA 9.
Hydrogen Analyzer Operability NRR (Tinker)
, Complete Review Issue and Determine Operability Requirements RTA 12/31/86 (1/27/87)