Forwards Request for Addl Info to Continue Review of 870122 Submittal Re Cycle 11 Reload Evaluation.Response Requested by 870227
ML20211B264
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/09/1987
From: Paulson W
Office of Nuclear Reactor Regulation
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
References
NUDOCS 8702190363
Download: ML20211B264 (3)


Text

,

W B OlG FEB. 91987

=

Docket No. 50-285 Mr. R. L. Andrews Division Manager - Nuclear Production Omaha Public Power District-1623 Harney Street Omaha, Nebraska 68102

Dear Mr. Andrews:

SUBJECT:

CYCLE 11 RELOAD EVALUATION Re:

Fort Calhoun Station, Unit No. 1 The staff is continuing its review of your submittal dated January 22, 1987 regarding your Cycle 11 reload evaluation.

As a result of this review, the staff has determined that the information provided did not provide sufficient detail to complete the review.

The additional information required is identified in the enclosure to this letter and it was also telecopied to Mr. Kevin Holthaus of your staff on January 29, 1987.

In order to complete this review in a timely manner consistent with your schedule for Cycle 11 reload, it is requested that you provide the requested information by February 27, 1987.

The request for information contained in this letter affects fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

.Originai signed by Walter A. Paulson, Project Manager PWR Project Directorate #8 Division of PWR Licensing-B

Enclosure:

Request for Additional Information cc w/ enclosure:

See next page STRIRllTTnti ACRS-10 ocket File '

BGrimes NRC PDR JPartlow 8702190363 870209 L PDR WPaulson ADOCK05000$05 PBD-8 Rdg PKreutzer PDR n

P FMiraglia Gray File OGC-Bethesda NThompson EJordan

[

PBD#8 P

PBD#

P edtzer WP son;cf ATh dani 2

}87 2&(I/87 2

/87

s Mr. R. L. Andrews Fort Calhoun Station Omaha Public Power District Unit No. 1 cc:

Harry H. Voigt, Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C.

20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 Mr. Phillip Harrell, Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations C-E Power Systems 7910 Woodmont Avenue Bethesda, Maryland 20814 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509 i

e

s REQUEST FOR ADDITIONAL INFORMATION FORT CALHOUN STATION, UNIT NO. 1 CYCLE 11 RELOAD EVALUATION 1.

Batch K fuel assemblies will achieve average burnups greater than 40,000 MWD /MTU during Cycle 11.

Please provide verification that appropriate fuel design criteria are still met.

Include evaluations of cladding collapse, irradiation induced dimensional changes, cladding strain and fatigue, and maximum fuel rod internal pressure.