Advises That Michigan Bell Co Will Replace Current Circuitry on Health Physics Network for Technical Support Ctr & Emergency Offsite Facility.Nrc Should Be Notified When Work Completed
ML20211A521
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/30/1986
From: Rotella T
Office of Nuclear Reactor Regulation
To: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
TAC-61502, NUDOCS 8606110183
Download: ML20211A521 (2)


Text

7 l

.-

  • May 30,1986 Docket No. 50-155 DISTRIBUII -

dcket File Mr. Kenneth W. Berry P RBernero Director, Nuclear Licensing Local PDR JZwolinski Consumers Power Company PD#1 Rdg EJordan 1945 West Parnall Road JPartlow BGrimes Jackson, Michigan 49201 CJainerson ACRS (10)

TRotella KPerkins

Dear Mr. Berry:

0 ELD

SUBJECT:

EMERGENCY COMMUNICATION SYSTEM AT LICENSEE PLANT SITES (TAC 61502)

Re: Big Rock Point Plant This letter is to inform you about NRC directed work to be done to the Health Physics Network (HPN) circuitry for the Technical Support Center (TSC) and Emergency Offsite Facility (E0F). This work does not require any action on your part except to allow the phone company to do the work at the TSC and E0F.

The HPN and the Emergency Notification System (ENS) are the emergency communication system between the licensees and the NRC. The NRC has decided that the HPN currently installed does not provide acceptable service. NRC is in the process of having the phone companies replacd the current circuitry with commercial service. This will be for only an interim period until a more dedicated service is available. The existing HPN service is currently in the TSC and E0F and may be in your Health Physics office and Resident's Inspector's office. The new HPN service will be located only in the TSC and E0F and the existing service will be removed from the other areas. This is being done for all plants including Big Rock Point; however, there is no schedule at present for when this work will be completed.

You will be notified that this work is to be done by the Michigan Bell Company. You are requested to have the company complete the work as soon as possible. If this work results in changes to the Site Emergency Plan and/or its implementing procedures, ensure the appropriate changes are made within a month of when the current HPN is replaced. Immediate pen and ink changes should be made to the Plan and procedures at the TSC and EOF. You are also requested to notify the NRC Operations Center when this work is scheduled to be done, when it is being done and when it is completed. The phone company contact is Don Morrison (616-347-4987), the Region I coordinator is Monte P.

Phillips (312-790-5530) and the Big Rock Point site coordinator is Linda 00stemyer.

Sincerely,

/S/

Thomas S. Rotella, Project Manager BWR Project Directorate #1 Division of BWR Licensing

[

cc: See Next Page f PD#1: DBL PD#1:DBLJ PD#1: L CJamerson/dn TRotella JZwolinski l S/ /86 5/4./86 5/f-/86 6110103 860530 F ADOCK 05000155 i PDR

[

L

Mr. Kenneth W. Rerry Consuners Power Company Rig Rock Point Plant cc:

Mr. Thomas A. McNish, Secretarv Consumers ' Power Company 912 West Michiaan Avenue

.lackson, Michioan 49201 iudd l L. Bacon, Escuire Consumers pnwar Companv 212 West Michican Avenue

.lackson, Michioan 49201 Rio Rock Doint Plant ATTN: Mr. David P. Hoffman Plant Superintendent Route 3 -

Post Office Rox 591 Charlevoix, Michinan 44720 Mr. I. Lee Moerland Chairman, Roard of Commissioners P. O. Rox 218 ,

Charlevoix, Michiaan 49720 Office of the Governor Room 1 - Caoitol Ruildina Lansing, Michinan 48913 Renional Administrator Nuclear Reculatory Commission, Reaion III 799 Roosevelt Road Glen E11vn, Illinois 60137 Nuclear Facilities and Environmental 3

Monitorina Section Office Division of Radiolo91cal Health P. O. Rox 30035 Lansing, Michigan 48909 Resident Inspector Big Rock Point Plant i c/o 11.S. NRC RR #3, Box 600 Charlevoix, Michigan 49720 nf I