ML20211A182

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/86-63 & 50-328/86-63.Response Meets Requirements of 10CFR2.201
ML20211A182
Person / Time
Site: Sequoyah  
Issue date: 02/04/1987
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8702190108
Download: ML20211A182 (2)


See also: IR 05000327/1986063

Text

-,

e

o

FEB 0 41987

Tennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT: REPORT NOS. 50-327/86-63 AND 50-328/86-63

Thank you for your response of January 9,1987, to our Notice of Violation issued

on December 9,1986, concerning activities conducted at your Sequoyah facility.

We have evaluated your response and found that it meets the requirements of

10 CFR 2.201.

We will examine the implementation of your corrective actions

during future inspections.

We appreciate your cooperation in this matter.

Sincerely,

Gary G. Zech, Director

Division of TVA Projects

cc:

H. L. Abercrombie, Site Director

Sequoyah Nuclear Plant

L. M. Nobles, Acting Plant Manager

R. W. Cantrell, Acting Director

Nuclear Engineering

R. L. Gridley, Director

Nuclear Safety and Licensing

M. R. Harding, Site Licensing

Manager

bec:

(See page 2)

pW[oh

P

~

G

'

IE0f

s.

.,

Tennessee Valley Authority

2

FEB 0 41987

bec:

J. N. Grace, RII

H. R. Denton, NRR

H. L. Thompson, NRR

J. M. Taylor, IE

B. B. Hayes, OI

S. R. Connelly, OIA

K. P. Barr, RII

NRC Resident Inspector

NRC Document Control Desk

State of Tennessee

RII

RII

RII

I.

JBb

EM

ne

SN

r

01/23/87

01/6 /87

01/79/87

010 , 87

'

gStohr

"k

&

FMc oy

K

r

01/g87

01/3o/87

0Ff/87