Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) DCL-99-033, Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl1999-03-12012 March 1999 Forwards Change 16 to Rev 18 of Diablo Canyon Power Plant Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Safeguards Effectiveness of Plan.Without Encl DCL-99-010, Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld1999-01-26026 January 1999 Forwards Change 15 to Rev 18 of Dcnpp Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Plan.Encl Withheld ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled DCL-98-163, Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld1998-11-24024 November 1998 Forwards Change 14 to Rev 18 of Physical Security Plan. Changes Do Not Decrease Safeguards Effectiveness of Plan & Submitted Pursuant to 10CFR50.54(p).Encl Withheld ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy DCL-98-014, Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld1998-02-10010 February 1998 Forwards Change 12 to Rev 18 to Physical Security Plan,Per 10CFR50.54(p).Plan Withheld ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon DCL-97-187, Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld1997-11-19019 November 1997 Forwards Change 11,rev 18 to Physical Security Plan.Encl 1 Describes Proposed Revs to Physical Security Plan.Plan Withheld IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted DCL-97-156, Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld1997-09-16016 September 1997 Provides Change 10 to Rev 18 of Physcial Security Plan & Change 2 to Rev 3 of Safeguards Contingency Plan.Plans Withheld ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML16343A4801997-02-25025 February 1997 Forwards non-proprietary WCAP-14796 & Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. Proprietary Rept Withheld,Per 10CFR2.90 ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML16342D5291997-01-31031 January 1997 Transmits WCAPs Supporting NRCs Review of License Amend Request 96-10,rev of TSs to Support Extended Fuel Cycles to 24 months.WCAP-11082,rev 5,WCAP-11594,rev 2 & WCAP-14646,rev 1 Withheld ML16342D5331997-01-24024 January 1997 Requests Proprietary Version of WCAP-14646,rev 1, Instrumentation Calibration & Drift Evaluation for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1997 Be Withheld from Public Disclosure Per 10CFR2.790 ML16342D5311997-01-24024 January 1997 Requests That WCAP-11594,rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation Be Withheld from Public Disclosure,Per 10CFR2.790 ML16342D5321997-01-24024 January 1997 Requests WCAP-11082,rev 5, Westinghouse Setpoint Methodology for Protection Sys,Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation, Jan 1996 Be Withheld from Public Disclosure Per 10CFR2.790 ML20136C3521997-01-11011 January 1997 Discusses Japan Oil Spill & Np Intake & Possibilities of Such Event Occurring at SONGS or Dcnpp ML20133F8961997-01-0909 January 1997 Responds to NRC Ltr of 961206 Received on 961210 Which Requested Further Info Re Utils Violations of Conditions of Its Nuclear Licenses Designated to Promote & Protect Competition in Bulk Power Market in Northern & Central CA ML20133F8721997-01-0909 January 1997 Acks & Responds to NRC Ltr of 961206 Received by Undersigned on 961210 Requesting Further Info to Document Tancs Assertion,Per Filing on 960429 That Util Has Violated Terms & Conditions of Nuclear Power Project Licenses ML16342D5521996-12-18018 December 1996 Requests That Proprietary WCAP-14795, Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methology, Be Withheld (Ref 10CFR2.790(b)(4)) ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation NSD-NRC-96-4846, Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl1996-10-16016 October 1996 Transmits Proprietary & non-proprietary Versions of Preliminary Rept, Incomplete Rcca Insertion. W Authorization ltr,AW-96-1021 & Affidavit Requesting Info Be Withheld from Public Disclosure Encl ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright DCL-96-170, Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld1996-08-14014 August 1996 Forwards Change 1 to Rev 4 of Training & Qualification Plan, Per 10CFR50.54(p).Plan Withheld DCL-96-141, Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld1996-07-31031 July 1996 Submits Change 9 to Rev 18 of Physical Security Plan.Plan Withheld ML20116B8411996-07-22022 July 1996 Forwards Revisions to SR 95-03,SR 95-04 & SR 95-05 Re EDG 1-2 Valid Failures ML20117E6171996-05-24024 May 1996 Forwards Public Version of Rev 11 to EPIP EP R-7, Off-Site Transportation Accidents DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld1996-05-0606 May 1996 Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld DCL-96-096, Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 151996-04-16016 April 1996 Forwards Public Version of Rev 3 to Diablo Canyon Power Plant Units 1 & 2 Emergency Plan, Change 15 DCL-96-054, Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld1996-02-28028 February 1996 Forwards Change 7 to Rev 18 of Physical Security Plan & Change 1 to Rev 3 of Safeguards Contingency Plan.Encl Withheld 1999-09-13
[Table view] Category:NRC TO LEGAL/LAW FIRM
MONTHYEARDD-90-03, Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc1990-07-27027 July 1990 Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc ML20235W2621989-03-0101 March 1989 Final Response to FOIA Request for Transcripts Re Facility. Forwards App H Documents.App H Documents Also Available in Pdr.App I Documents Partially Withheld Per Sunshine Act IA-88-455, Final Response to FOIA Request for Documents.App a Documents Available in PDR1988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20155F8691988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20153H6121988-08-18018 August 1988 Final Response to FOIA Request.Forwards App E Documents.Apps D & E Documents Available in Pdr.Charges for Search, Duplication & Postage Listed ML20153H1821988-08-12012 August 1988 Responds to 880505 Appeal of Denial of Documents & Portions of Documents Identified on Encl Apps E & F in 880425 Response to FOIA 87-444.Documents or Portions of Documents Continue to Be Withheld (Ref FOIA Exemption 5) ML20151W7771988-07-21021 July 1988 Third Partial Response to FOIA Request for Documents.App C Documents Encl & Available in Pdr.Addl Records Referred to Dept of Commerce & Doi for Review & Direct Response ML20195C9571988-06-15015 June 1988 Second Partial Response to FOIA Request for Documents.App B Documents Encl & Available in PDR ML20154C3671988-05-10010 May 1988 First Partial Response to FOIA Request for Documents.App a Documents Encl.Addl Records Re Request Contained in FOIA-87-214 Under Name of Conner ML20151Y9641988-04-18018 April 1988 Final Response to FOIA Request for Documents.Apps C & D Documents Available in Pdr.Deleted Portions of Documents in App D,Item 77 Outside Scope of Request.Apps E & F Documents Withheld (Ref FOIA Exemption 5) ML20147D1391988-02-29029 February 1988 Responds to FOIA Request for Transcript of 871103 Meeting Re Plant.Encl Transcript Partially Withheld Per Exemption 10 of Govt Sunshine Act ML20196B6851988-02-0909 February 1988 Partial Response to FOIA Request for Documents Re Potential Generic or site-specific Backfits Under Consideration by NRC Since Sept 1985.App D Documents Available in Pdr.App E Documents Withheld (Ref FOIA Exemption 5) ML20236K0691987-11-0404 November 1987 Final Response to FOIA Request for Documents.App a Documents Available in Pdr.No Records Located Re Item 1 of Request ML20235T7201987-10-0707 October 1987 Partial Response to FOIA Request for Indices of Former Commissioners Records Re Plant.App a Documents Available in Pdr.Forwards App B Document Which Will Be Available in PDR ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20235T7071987-05-19019 May 1987 Responds to FOIA Request for Records Re Plant from 660101-860331.Request Fails to Meet Threshold Requirements of 5 U.S.C. 552(a)(3) IA-87-174, Responds to FOIA Request for Records Re Plant from 660101-860331.Request Fails to Meet Threshold Requirements of 5 U.S.C. 552(a)(3)1987-05-19019 May 1987 Responds to FOIA Request for Records Re Plant from 660101-860331.Request Fails to Meet Threshold Requirements of 5 U.S.C. 552(a)(3) ML20210B8891987-04-30030 April 1987 Responds to & Stated Concerns Re Status of Staff Review of Byron Amend Re Instant Reracking Proceeding.Staff Did Not Make Determination Re Significant Hazards Considerations.Related Correspondence ML20212P2871987-03-10010 March 1987 Responds to Requesting Interviews W/Degrassi & Philippacopoulos of BNL & Availability for Upcoming Hearing Re Spent Fuel Pool Rerack Application.Degrassi Will Be Presented at Hearing as Witness.Related Correspondence ML20211A0391987-02-12012 February 1987 Forwards H Ashar 870127 Memo Re Analysis of Facility High Density Spent Fuel Racks & Two Proposals from Sargent & Lundy & 13.Related Correspondence ML20210S4131986-09-26026 September 1986 Further Response to FOIA Request for 16 Categories of Records Re Facilities.Forwards App D & E Documents.Documents Also Available in PDR ML20136B0861985-11-25025 November 1985 Further Response to Request for All Info Re Ford Amend Study.Encl Apps O & P Documents Also Available in Pdr.App Q Document Withheld (Ref FOIA Exemption 5) ML20207Q7241982-04-23023 April 1982 Informs That ACRS Subcommittee on Diablo Canyon Has Not Held Any Meetings Re Deficiencies,In Response to . Recipient Will Be Informed in Advance of Subcommittee Meetings ML20207Q7221982-04-0707 April 1982 Informs That Review of Plant Seismic Design Deficiencies Referred to Cognizant Subcommittee,In Response to Recipient .Subcommittee Findings Will Also Address Basis for Changes in ACRS Position Re Operation of Plant ML20062E8711978-11-21021 November 1978 Forwards List of Publications & Rev Qualifications Sheet Omitted from 780927 Staff'S Response to Intervenor'S Interrog ML20236B0671977-06-0101 June 1977 Advises That Technical Consultants May Observe But Not Participate in NRC Seismic Audit of Plant,Per 770429 Request.Nrc Will Be Willing to Discuss Audit Findings & Conclusions ML20236B3451976-12-27027 December 1976 Responds to Request to Inspect Documents & Records Re Geology & Seismicity in Vicinity of Plant.List of Documents Available for Inspection at PDR or Lpdr Encl 1990-07-27
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212B1681999-09-13013 September 1999 Forwards Insp Repts 50-275/99-12 & 50-323/99-12 on 990711- 08-21.Four Violations Being Treated as Noncited Violations ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H6181999-07-27027 July 1999 Forwards Insp Repts 50-275/99-07 & 50-323/99-07 on 990503- 0714.Apparent Violations Being Considered for Escalated Enforcement Action ML20205J3381999-04-0808 April 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision Expired. Commission Declined Any Review & Became Final Agency Action on 990406.With Certificate of Svc.Served on 990409 IR 05000275/19980121999-01-13013 January 1999 Informs That Insp Repts 50-275/98-12 & 50-323/98-12 Have Been Canceled ML20195G5161998-11-16016 November 1998 Forwards Insp Repts 50-275/98-16 & 50-323/98-16 on 980913- 1024.No Violations Noted ML20155F7951998-11-0303 November 1998 Second Partial Response to FOIA Request for Documents. Records Subj to Request Encl & Identified in App C ML20236T2931998-07-24024 July 1998 Forwards Order Prohibiting Involvement in NRC Licensed Activities for 5 Yrs.Order Being Issued Due to Falsification of Info on Application to Obtain Unescorted Access to PG&E Plant ML20236T3431998-07-22022 July 1998 Forwards Insp Repts 50-275/98-11 & 50-323/98-11 on 980526-28.Apparent Violations Identified & Being Considered for Escalated Enforcement Action ML20236J2251998-07-0101 July 1998 Ltr Contract,Task Order 232 Entitled, Review of Callaway, Comanche,Diablo Canyon & Wolf Creek Applications for Conversion to Improved TS Based on Standard TS, Under Contract NRC-03-95-026 IR 05000275/19980051998-04-17017 April 1998 Forwards Insp Repts 50-275/98-05 & 50-323/98-05 on 980202-06 & 23-27 & 0302-18.No Violations Noted.Insp Focused on Resolution of Previous NRC Insp Findings & Included Review of Issues Identified During Architect/Engineering Insp Rept ML20203G0371998-02-25025 February 1998 Forwards Revised Copy of NRC Form 398, Personal Qualification Statement - Licensee, (10/97) Encl 1,which Has Been Revised to Reflect Current Operator Licensing Policy ML20199H6691998-02-0202 February 1998 Ack Receipt of ,Transmitting Rev 18,change 11, to Plant Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p).Role of Video Capture Audible Alarm Sys Needs to Be Addressed in Security Plan,Per 980123 Telcon IR 05000275/19970181997-10-31031 October 1997 Forwards Insp Repts 50-275/97-18 & 50-323/97-18 on 971006- 10.Insp Verified That Liquid & Gaseous Radioactive Waste Effluent Mgt Program Was Properly Implemented.No Violations Noted ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities ML20134H6271997-02-10010 February 1997 Fifth Partial Response to FOIA Request for Documents.Records in App I Encl & Available in Pdr.App J Records Withheld in Part (Ref FOIA Exemption 5) & App K Records Completely Withheld (Ref FOIA Exemption 5) ML20134K3421997-02-0606 February 1997 Conveys Results & Conclusions of Operational Safeguards Response Evaluation Conducted by NRR at Plant,Units 1 & 2, on 960909-12.W/o Encl ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation ML20129G6121996-09-24024 September 1996 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App C,E,F & G.Documents Available in Pdr.App E,F & G Documents Partially Withheld Ref FOIA Exemptions 4 & 6.App D Record Listed as Copyright ML20149H8171994-12-23023 December 1994 Advises That 941010 & 1102 Changes 4 & 5 to Rev 18 of Physical Security Plan,Respectively Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20059L5031994-01-28028 January 1994 Extends Invitation to Participate in Workshop Re Emergency Preparedness & Incident Response on 940222 in Arlington,Tx ML20058A1211993-11-16016 November 1993 Forwards Safeguards Info Referenced in Preliminary Draft Guide Re Proposed Rule for Protection Against Manevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld IR 05000275/19930211993-08-27027 August 1993 Forwards Insp Repts 50-275/93-21 & 50-323/93-21 on 930726-30.Non-cited Violations Identified.Insp Repts Withheld in Entirety Ref 10CFR73.21 ML20057B3241993-05-0404 May 1993 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App Q Which Are Being Made Available at Pdr.Documents Listed in App R Are Partially Withheld (Ref FOIA Exemption 5) ML20058M0361993-04-12012 April 1993 Partial Response to FOIA Request for Documents.Forwards Records in App L Which Are Being Withheld Partially for Listed Reasons,(Ref FOIA Exemptions 5) ML20056C2811993-01-29029 January 1993 Ltr Contract,Mod 1 to Task Order 5,providing Incremental Funding of Listed Amount,To IPE Reviews,Internal Events Back-End-Only ML20127F1091993-01-13013 January 1993 Extends Invitation to Participate as Breakout Session Facilitator on 930217-18 at Workshop Hosted by Regions IV & V in Arlington,Tx to Discuss Operability/Degraded Equipment as Specified in GL 91-18.Record Copy IR 05000275/19920321992-12-11011 December 1992 Forwards Insp Repts 50-275/92-32 & 50-323/92-32 on 921116-19 & Notice of Violation.Violation Noted Re Failure to Withdraw Security Safeguards Access List.Encls Withheld (Ref 10CFR73.21) IR 05000275/19920281992-12-0202 December 1992 Forwards Insp Repts 50-275/92-28 & 50-323/92-28 on 921005-09.No Violations Noted.Encl Withheld (Ref 10CFR73.21) ML20058B5331990-10-22022 October 1990 Forwards Partially Withheld Safeguards Insp Repts 50-275/90-17 & 50-323/90-17 on 900924-28.Licensee Identified Violations Reviewed But Not Cited ML20058N8501990-08-10010 August 1990 Responds to Forwarding Correspondence from Bl Boxer & Le Panetta Re Seismic Safety of Plant.Nrc Will Complete Review of Plant Seismic Reevaluation Program & Will Document Findings in SER DD-90-03, Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc1990-07-27027 July 1990 Advises That Time for Commission to Review Director'S Decision DD-90-03 Expired.Commission Declined Review. Decision Became Final Agency Action on 900724.Served on 900731.W/Certificate of Svc ML20059M9781990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20246K4721989-08-28028 August 1989 Advises That 880419 Rev 2 to Guard Training & Qualification Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20246E5321989-08-22022 August 1989 Forward Summary of Sys Engineering/Design Engineering Initiatives & ...Quarterly Sys Status Rept,2nd Quarter 1989.... Rept Demonstrates Depth,Scope & Usefulness of Walkdown as Tool for Assessing Sys Status,Problems & Trends IR 05000275/19890201989-07-31031 July 1989 Forwards Safeguards Insp Repts 50-275/89-20 & 50-323/89-20 on 890710-14.No Violations Noted ML20245D9431989-04-18018 April 1989 Forwards Insp Repts 50-275/89-12 & 50-323/89-12 on 890403-07.No Violations or Deficiencies Noted IR 05000275/19890071989-03-24024 March 1989 Forwards Safeguards Insp Repts 50-275/89-07 & 50-323/89-07 on 890227-0303.No Violations Noted.Repts Withheld (Ref 10CFR2.790(d) & 73.21) ML20235W2621989-03-0101 March 1989 Final Response to FOIA Request for Transcripts Re Facility. Forwards App H Documents.App H Documents Also Available in Pdr.App I Documents Partially Withheld Per Sunshine Act ML20205R1641988-10-18018 October 1988 Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5) IA-88-102, Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5)1988-10-18018 October 1988 Final Response to FOIA Request for Documents.Informs That App a & B Documents Available in Pdr.Forwards Partially Deleted App B & C Documents (Ref FOIA Exemption 5) ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR IA-88-455, Final Response to FOIA Request for Documents.App a Documents Available in PDR1988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20155F8691988-09-0808 September 1988 Final Response to FOIA Request for Documents.App a Documents Available in PDR ML20153H6121988-08-18018 August 1988 Final Response to FOIA Request.Forwards App E Documents.Apps D & E Documents Available in Pdr.Charges for Search, Duplication & Postage Listed ML20151X2161988-08-18018 August 1988 Ack Receipt of Transmitting Scenario for Util 1988 Annual Emergency Preparedness Exercise ML20153G9331988-08-15015 August 1988 Partial Response to FOIA Request for Documents.Forwards App C Document.Documents Available in PDR ML20153H1821988-08-12012 August 1988 Responds to 880505 Appeal of Denial of Documents & Portions of Documents Identified on Encl Apps E & F in 880425 Response to FOIA 87-444.Documents or Portions of Documents Continue to Be Withheld (Ref FOIA Exemption 5) ML20151U3741988-08-11011 August 1988 Informs of NRC Interpretation of 10CFR50.74(a) Re Changes in Operator or Senior Operator Status 1999-09-13
[Table view] |
Text
3 (ELATED COftHESPONDEfiQs pan:
+ UNITED STATES v g NUCLEAR REGULATORY COMMISSION
[
g ;E WASHINGTON. D. C. 20566 DOCHETED
($,N R('
\**'**/ '
87 FEB 17 P3 :24 February 12, 1987
[CCNTI'tWn:;m Edwin F. Lowry, Esq.
Dian M. Grueneich, Esq.
Grueneich & Lowry '
345 Franklin Street San Francisco, CA 94102 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Nuclear Power Plant, Units 1 and 2)
Docket Nos. 50-275 OLA and 50-323 OLA (Spent Fu_el Pool)
Dear Mr. Lowry:
As I indicated in our telephone conference on February 10, 1987 con-cerning information in the Byron Station docket ' regarding multi-rack impact analyses , enclosed please find a copy of an NRC Staff Memorandum dated January 27, 1987, from Hans Ashar, Structural and Civil Engineering Section to Lenny Olshan, Senior Project Manager, as well as copies of two proposals from Sargent & Lundy, one dated January 6,1987 and one dated January 13, 1987, Sincerely, f >
e '
. McGurren Cou 'l for NRC Staff
Enclosures:
As Stated cc w/ enclosures: Service List 87021riOO78 870212 5 1
PDR ADOCK 0500 50
.g, G'fi m2mewe e r . -
1
. D fa ats UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
.. g g
,, # JAN 3 71937 w , ,,,, #
MEMORANDUM F0'R: Lenny 01shan, Sr. Project Manager PWR Project Directorate No. 5 Division of PWR Licensing-A THRU: David Jeng, Section Leader Structural and Civil Engineerino Section Division of PWR Licensing-A FROM: Hans Ashar Structural and Civil Engineering Section Division of PWR Licensing-A
SUBJECT:
HIGH DENSITY SPENT FUEL RACKS, BYRON UNITS 1 AND 2, COMMENTS ON THE PROPOSED ADDITONAL ANALYSIS We have reviewed the proposed additional analysis f sent to us by Sargent &
Lundy on January 13, 1987) to resolve the concerns regarding multi-rack impact and effects of variation in gap sizes between racks, in consultation with the Brookhaven National Laboratory. The following are our comments:
- 1. The proposed approach could be acceptable if it can be shown that seismic acceleration levels are below the threshold necessary for large sliding motion and the results of additional analysis demonstrate significant safety margins.
- 2. The statement that the maximum displacement of an isolated rack is only 0.122 inches appears inconsistent with previous results which had shown maximum displacements of 0.1722 inch for the 12X14 rack, and 0.801?
inch for 8X14 rack. Explain the discrepancy. How will fluid coupling be treated in the isolated rack model?
- 3. If the proposed additional analysis is performed:
al The 8X14 rack should also be analyzed since previous analyses showed that this rack experienced both - maximum displacements and maximum impact loads.
b) The zero initial gap conditions should also be analyzed since it is the ncminal condition.
4 Provide a list of additional cases proposed to be analyzed. Will both interior and edge racks be analyzed? For edge racks, will gaps to the pool wall be reduced as gaps between racks increase?
l
elan 2 71987 4
- 5. Provide the minimum safety margins including the margins on girdle bar impact. 1 AvtA Hans Ashar Structural & Civil Engineering Section Engineering Branch Division of PWR Licensing-A cc: C.E. Rossi V. Noonan R.L. Ballard D. Jeng G. Degrassi, BNL DISTRIBllTION:
Docket Files PAEB Reading File PAEB Plant File HAshar l
~ . _ _ _ - .
-L 1
S. Putman - January 6, 1987 i 3
N. ,
y Proposed Response to NRC Question on Multirack Behavior During l
- a Seismic Event Question #4 How was the conservatism of the single rack model demonstrated?
l The model appears to limit the amount of sliding and tilting of the rack between small gaps. This would not account for potential pileup of racks against the pool wall. Has this possibility been investigated?
Response
Additional analysis designed to obtain enveloping rack responses in terms of impact force between racks and the liner is proposed to respond to this question. Multiple single rack analysis i may be used to maximize the impact force between racks. The boundary conditions in single rack analysis simulate the condition where
$ the racks are out of phase. The rigid stop springs at the end of 4
4 the gap stop the rack and allow little energy to be absorbed by 4
the boundary and maximizes impact force. In reality the adjacent rack will not be exactly out of phase and will absorb some energy tending to reduce impact force. The impacts between adjacent racks may tend to separate the racks thus increasing rack to rack spacing.
This condition may be simulated through analysis considering larger ;
gaps than previously assumed so that the single rack analysis impact ;
force bound the impacts which may occur in the pool.
If the racks spread apart in the pool they may come in contact with the pool wall liner. The pool liner is backed by concrete and is stronger than the rack structure and thus is capable of 1
resisting blows larger than the rack can deliver.
~ _ _ _
d..
Accordingly, the rack which produces the highest impact force (12x14) will be reana.1.yzed considering an increase.in gap size. The gap size will be varied in 1/4" increments starting at 1/4" until racks do not impact. In order to maximize rack response the fully loaded rack case and the eccentric half loaded rack case will be analyzed.
The above analyses will be carried out for the limiting coefficients of friction; pv = 0.2 and 0.9. The above set of parameters will yield an upper bound on impact force. The maximized impact force j will be used to evaluate the racks and pool wall liner.
H. Asher - NRC telecopy K. Singh - Holtee telecopy K. Ainger - 34FNE S. Gubin - 35FNW T. J. Ryan - 28 R. Salsbury - 22 l
, Sa putman - January 13, 1987
, proposed Response to NRC Question on Multf rack Behavior During a Seismic Event l Question #4 How was the conservatism of the single rack model demonstrated? The model appears to limit the amount of sliding and tilting of the rack between small gaps. This would not account for potential ileup of racks against the pool i wall. Has this possibility been investigate ?
Response
l
' C 4
Rack pile up will not occur because seismic acceleration levels are below the threshold necessary for the large sliding motion of the racks necessary for that pfle up. It may be seen from the analysis of an individual isolated rack that the input acceleration levels are low enough so that sufficient !;
- displacement does not occur to obtain the free sIfding behavior necessary to produce such a pileup. The maximum displacement, including sliding and '.
tilting of an isolated rack, is 0.122 inches. However, multiple rack behavior may tend to separate the racks.
l This condition may be simulated through analysis considering larger gaps than
! previously assumed so that the sin 111e rack analysis impact force bound the impacts which may occur in the poo' .
! Additional analysis designed to obtain enveloping rack responses in terms of
! tmpact force between racks and the liner is proposed to respond to this j question. Multiple single rack analysis may be used to maximize the impact force between racks. The boundary conditions in single rack analysis simulate I the condition where the racks are out of phase. The rigid stop springs at the l- end of the gap stop the rack and allow little energy to be absorbed by the boundary and maximizes impact force. In reality, the adjacent rack will not i
be exactly out of phase and will absorb some energy tending to reduce impact i force.
i If the racks s> read apart in the pool, they may come in contact with the pool i wall liner. Tie pool Ifner is backed by concrete and is stronger than the
! rack structure and thus is capable of resisting blows larger than the rack can i deliver.
0 /
Accordingly, the rack which produces the highest impact force (12 x 14) will
,' be reanalyzed constdering an increase in gap size. The gap size will be varied in 1/4" increments starting at 1/4 until racks do non impact. In order to maximize rack response, the fully loaded rack case and the eccentric
- half loaded rack case will be analyzed. The above analyses will be carried j out for the 11mitin coefficients of friction;p= 0.1 and 0.8. The above set 4
of parameters will teld an upper bound on impact force. The 'naximized impact i force will be used to evaluate the racks and pool wall liner.
SP:atk Copies:
2 H. Ehe * - NRC telecony 5. Gubin - Ctco 35 FNW
. K. S' ngi - Holtee telecopy T. Ryan - 28 j K. Aniger - CECO 34 FNE R. Salsbury - 22 i
i l