Forwards Safety Insp Repts 50-277/86-18 & 50-278/86-19 on 860908-12 & Notice of Violation.Enforcement Conference Will Be Scheduled to Address Program Weaknesses & Corrective Actions
ML20210V381
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/01/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20210V387 List:
References
NUDOCS 8610100685
Download: ML20210V381 (2)


See also: IR 05000277/1986018

Text

{{#Wiki_filter:.

 .
                                       OCT 011986
    Docket Nos. 50-277
                  50-278
    Philadelphia Electric Company
    ATTN: Mr. S. L. Daltroff
            Vice President
            Electric Production
    2301 Market Street
    Philadelphia, Pennsylvania 19101
    Gentlemen:
    Subject: Combined Inspection Report Nos. 50-277/86-18 and 50-278/86-19
    A routine radiation safety inspection was conducted by Mr. T. Dragoun ar.d
    Mr. A. Weadock of this office on September 8-12, 1986 at the Peach Bottom
    Station.
    Areas examined included organization and staffing, routine radiological
    surveys, fuel pool diving cperations, and follow-up on an allegation concerning
    an altercation between personnel in a radiation area.
    As a result of this inspection one violation was identified - failure to
    follow station procedures relative to reporting and investigating the
    altercation. You are required to respond to the violation in enclosure
    Appendix A by following the instructions included in Appendix A.
    When you have reviewed the attached report and the NRC Investigation Report
    50-278/85-019 transmitted to you by letter dated September 22, 1986, and are
    prepared to discuss their findings, please contact us for the purpose of
    scheduling an enforcement conference. During this meeting, it is expected that
    you will be prepared to address program weaknesses associated with the imple-
    mentation of station procedures (A-86) and your corrective actions to improve
    your program for self identification, correction, and preventing recurrence of
    radiological control problems.
    As discussed in Section 4 of the attached inspection report, our inspectors
    identified several problems in your routine radiological surveys program.

t Your staff had identified and initiated corrective actions on these problems.

    To encourage and support licensee's initiative for self-identification and
    correction of problems, and in accordance with the NRC enforcement policy in
    10 CFR 2 Appendix C, no violations relative to your routine radiological
    survey program will be issued at this time.
                                  golo0685861001           -
                                  G      ADOCK 05000277
                                                    PDR      ,
                               OFFICIAL RECORD COPY     CIR PB 86-18/19 - 0001.0.0
                                                        09/30/86
                                                                                    %
   .
 .
     Philadelphia Electric Company              2
     Your cooperation with us in this matter is appreciated.
                                                Sincerely,
                                                 [{[[K.A1
                                                Thomas T. Martin, Director
                                                Division of Radiation Safety
                                                   and Safeguards
     Enclosures:                                                                     -
     1.    Appendix A, Notice of Violation
     2.    NRC Region I Combined Inspection Report No. 50-277/86-18 and 50-278/86-19
     cc w/encls:
     R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station
     John S. Kemper, Vice President, Engineering and Research
     Troy B. Conner, Jr. , Esquire
     W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric
     G. Leitch, Superintendent Nuclear Generation Division
     Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
     Raymond L. Hovis, Esquire
     Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)
     W. M. Alden, Engineer in Charge, Licensing Section
     Public Document Room (PDR)
     Local Public Document Room (LPDR)
     Nuclear Safety Information Center (NSIC)
     NRC Resident Inspector
     Commonwealth of Pennsylvania
     bec w/encls:
     Region I Docket Room (with concurrences)
     Management Assistant, DRMA (w/o enc 1)
     Section Chief, DRP
     Robert J. Beres, DRSS
     RI:DRSS$Wh            RI:DRSS         RI:DRSS               . RP RI:DRSS  RI RSS
     Dragoun/mlb'geb
                  /        Weadock         Sha             Gal o      Bellamy  Martin
     9/30/86               9/30/86         9/3#86          9 @ /86    9/g3/86  9/JW86
                                0FFICIAL RECORD COPY       CIR PB 86-18/19 - 0002.0.0
                                                           09/30/86

>

                                             -        -
                                                             --e                       , -

}}