d y

o

-*2e FEB 101987 Geprgia Power Company 24TTN: Mr. James P. O'Reilly Senior Vice President-Nuclear

.0perations-P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

V0GTLI ELECTRIC GENERATING PLANT - MISCELLANE0US ELECTRICAL AND INSTRUMENTATION CONCERNS - RII-87-A-0018 The-enclosure to this letter documents concerns received from an anonymous caller. No additional information was provided by the alleger.

Please review these concerns and take action as appropriate, and provide the results of your investigation to this office within 20 days of the date of this letter.

If you have any questions regarding this matter, please feel free to contact me or Mr. Oscar DeMiranda, Regional Allegation Coordinator at 404/331-4193.

Sincerely, ORIGINAL GlCNED BY VIRGIL L EROVINLEE Virgil L. Brownlee, Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosure:

Statement of Concern cr w/ encl:

f br. E. Conway, Senior Vice President &

Project Director Z Whitney, General Manager Project jiupport W. D. Rice, Vice President, Project

,_Jngineering T. H. Pinson, Vice President, Project Construction y W. Hayes,-Vogtle Quality Assurance Manager (cc w/enci cont'd - see page 2) 0702180734 B70210 DR ADOCK 05000424 PDR EDI

.o Georgia Power Company 2

FEB 101987 (c w/ encl cont'd)

. B. Bockhold, General Manager, Nuclear Operations s[J(Gucwa, Manager,NuclearSafety

-l and Licensing l,

M. Bailey, Project Licensing Manager i

LJV V. Churchill, Esq., Shaw, j

Pittman, Potts and Trowbridge p k E. Joiner, Troutman, Sanders, Lockerman and Ashmore l>M G. Ledbetter, Commissioner,

(

Department of Human Resources LC( H. Badger, Office of Planning

._ Jnd Budget W. Kirkland, III, Counsel, Office of the Consumer's Utility Jouncil Lfr. Feig, Georgians Against Nuclear Energy

/,E B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board Panel UV. O. H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel g A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel

.bgc w/ encl:

(E. Reis, OGC (W. M. Hill, IE LM' Miller, NRR tr. Brach, ED0 M. Sinkule, RII E. Christnot, RII IMO Resident Inspector Document Control Desk State of Georgia RII RI RII l

MSinkule:Jw ODeMiranda GJen ns i

2/ef,/87 2/of/87 2/g 87 Il

[

3 ENCLOSURE Statement of Concerns RII-87-A-0018 287001801 GPC has not met the 6 inch electrical separation criteria at the field cable and internal wire junction.of data module cabinet 1RE003.

The cabinet contains safety related wiring and the connecting field wiring is non-safety.related. The communications link to the Control Room is non-safety related and does not have the required 6 inch separation.

287001802 After installation of the Main Control Board,' GPC has added some non-safety communications installations such as pager phones, etc.

This wiring was installed in the Train A safety related wireways.

GPC may also have added some non-safety fire protection wiring to.

the Main Control Board, 287001803 The alleger heard from another party that-GPC performed a hydrostatic test on the Reactor Vessel leak-off line and used an improperly calibrated gauge..Therefore, the hydrostatic pressure requirements were not met.

287001804 There is no control or protection to Unit 1 Plant Effluent Radiation Monitoring System (PERMS) module #ARE2532 that is located in Unit 2.