Forwards Insp Repts 50-445/86-21 & 50-446/86-18 on 860701-31.No Violations or Deviations Noted.Actions Taken to Correct Violations Noted During Previous Insps Examined
ML20210V270
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/30/1986
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20210V274 List:
References
NUDOCS 8610100633
Download: ML20210V270 (3)


See also: IR 05000445/1986021

Text

- .

4 ,I I

In Reply Refer To:

Dockets: 50-445/86-21

50-446/86-18 9 30 W

Texas Utilities Generating Company

ATTN: Mr. W. G._Counsil

Executive Vice President

400 North Olive Street, Lock Box 81

Dallas, Texas 75201

,

Gentlemen:

This refers to the inspection conducted by Mr. D. L. Kelley of this office

during the period July 1-31, 1986, of activities authorized by NRC

Construction Permits CPPR-126 and CPPR-127 for the Comanche Peak Steam Electric

Station, Units 1 and 2, and to the respective discussions of our findings with

Mr. A. B. Scott and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included: (1)applicantactionson

previous inspection. findings, (2) calibration source recovery, (3) Unit 2

preoperational test procedure review, (4) plant tours, and (5) plant status.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the inspectors. The inspection findings are documented in the

enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

'

Odginal Sigded By.

E. H. Johnson

'

'

E. H. Johnson, Director

Division of Reactor Safety and

Projects ,

_

s

'

Enclosures: (seenextpage)

RIV: SRI CPG RSB % DRSP NRR . IE

DLKepey:lc IBarnes TFwesterman EHJohnYon VNoonan RLSpessard

h/s6/86 7/n/86 1/e/86 g /p/86 -

f/)yj86 f /gg86

4

.:::r=S

-/

8610100633 860930"

FDR ADOCK 05000445

[ 1

3

O

O PDR

-

_ _ _.._____ __.. __. _

_ _, . _ .

t. c

Texas Utilities Generating Co. -2-

Enclosure:

Appendix - NRC Inspection Report

50-445/86-21

50-446/86-18

cc w/ enclosure:

Texas Utilities Electric Company

ATTN: G. S. Keeley, Manager

Licensing

Skyway Tower

400 North Olive Street

Lock Box 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

Renea Hicks

Assistant Attorney General

Environmental Protection Division

P. O. Box 12548

Austin, Texas 78711 - 2548

Administrative Judge Peter Bloch

U. S. Nuclear Regulatory Commission

Washington, D. C. 20555

Elizabeth B. Johnson

Administrative Judge

Oak Ridge National Laboratory

P. O. Box X, Building 3500

Oak Ridge, Tennessee 37830

Dr. Kenneth A. McCollom

1107 West Knapp

Stillwater, Oklahoma 74075

Dr. Walter H. Jordan

881 Outer Drive

Oak Ridge, Tennessee 37830

Anthony Roisman, Esq.

Executive Director

Trial Lawyers for Public Justice

2000 P. Street, N.W., Suite 611

Washington, D. C. 20036

Texas Radiation Control Program Director

l

. , . _ . - , , ,

= - -

- - - -- - -- - - - - - - - - - - - - - - - -

4 -

DISTRIBUTION:

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB * MIS System
  • RRI-OPS *RSTS Operator

"

  • RRI-CONST *R&SPB
  • T. F. Westerman, RSB DRSP

V. Noonan, NRR R. Martin, RA

S. TreSy, ELD *RSB

  • RIV File J. Taylor, IE
  • D. Weiss,LFMB(AR-2015) J. Konklin, IE
  • I. Barnes, CPTG
  • w/766

,

4

i

,

. . , - - . . _ . , , . , . _ _ , , . . , , . , . . . , . . , . - = - - - . -- . . . , , -.. , - - - .- .--