ML20210V129

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 99900005/86-01 on 860818-20 & Notice of Nonconformance.Implementation of QA Program Failed to Meet Certain Requirements.Weaknesses Identified in Areas of Confirmed Traceability to Nbs.One Unresolved Item Noted
ML20210V129
Person / Time
Issue date: 10/08/1986
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Slember R
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20210V134 List:
References
REF-QA-99900005 NUDOCS 8610100527
Download: ML20210V129 (3)


Text

e kB IElgIg UNITED STATES

{

g NUCLEAR REGULATORY COMMISSION O

j WASHINGTON, D. C 20555

".....,o$

October 3, 1936 Docket No. 99900005/86-01 Westinghouse Electric Corporation Nuclear Fuel Division ATTN: Dr. Richard Slember General Manager Post Office Box 355 Pi ttsburgh, Pennsylvania 15230 Gentlemen:

This refers to the inspection conducted by Ms. C. Abbate and Messrs. J. Craig, D. Lynn, and P. Prescott of this office on August 18-20, 1986, of your facility in Blairsville, Pennsylvania and to the discussions of our findings with Mr. Ron Cost and members of your staff at the conclusion of the inspection.

The purpose of this inspection was to observe fuel tube manufacturing activities, review ultrasonic testing (UT), procurement, and equipment calibration activities, and follow-up on Westinghouse corrective action cor,cerning items identified during previous NRC inspections. Areas examined during the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.

During observatiun of your activities and review of your records, it.was found the implementation of your Quality Assurance (QA) program failed to meet certain requirements. Weaknesses were identified in the areas of confirmed traceability to the National Bureau of Standards (NBS) and serialization in the equipment calibration control system of the standard used for UT equipment to validate tube ovality, documentation of results of UT equipment calibration, and document control. Additionally, one utwsolved item was noted in the procedure used to verify tube ovality ultrasonically. While the procedure is technically accurate, it is unclear whether the requirement of Total Indicator Reading (TIR) is being met. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within 30 days from the date of this letter a written stater.ent containing:

1) a description of steps that have been or will be taken to correct these items; ?) a descripcion of steps that have been or will be taken to prevent recurrence; and 3) the dates your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.

l l

l o

f 8610100527 861oos 7

oog99EMvW l

Westinghouse Electric Corporation October 8, 1986 The responses requested by this letter are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, O

Q Robert F. Heishman, Chief Vendor Program Branch Division of Quality Assurance, Vendor and Technical Training Center Programs Office of Inspection and Enforcement

Enclosures:

1.

Appendix A-Notice of Nonconformance 2.

Appendix B-Inspection Report No. 99900005/86-01 3.

Appendix C-Inspection Data Sheets (4 pages) cc w/ enclosures:

Mr. Ron Cost Westinghouse Electric Corporation Nuclear Fuel Division Post Office Box 355 Pittsburgh, Pennsylvania 15230 Mr. D. J. Haymon Westinghouse Electric Corporation Nuclear Fuel Division Post Office Box 355 Pittsburgh, Pennsylvania 15230

i=

Westinghouse Electric Corporation (99900005/86-01)

October 8, 1986 DISTRIBUTION:

Ews:IE:0!Ld VPB Reading

.DQAVT. Reading RStarostecki BGrimes HMiller RHeishman JCraig

'JStone LParker CAbbate PPrescott DLynn, O'Donnell & Associates 1

0 kV

DQAVT AVT BC/VPB:DQAVT

\\

CA bate:tt JCraig RHeishman (O/ }/86 l

/86 g / /86

-