ML20210U599

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 860414-18
ML20210U599
Person / Time
Site: Oyster Creek
Issue date: 05/27/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20210U596 List:
References
50-219-86-11, NUDOCS 8606030029
Download: ML20210U599 (1)


Text

o APPENDIX A NOTICE OF VIOLATION GPU Nuclear Corporation Docket No.

50-219 Forked River, New Jersey 08731 License No. DPR-16 During an inspection conducted on April 14 - 18, 1986, the following violation of NRC requirements was identified.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is set forth below:

Section XVI of Appendix B to 10 CFR 50 requires that non-conformances are identified and corrected promptly.

Contrary to the above, as of' April 16, 1986 a non-conformance identified 18 months earlier in technical specification audit S-0C-84-19 has not been corrected promptly.

The non-conformance is a 5 foot long crack in the fire wall of the Turbine Building south stairwell.

This is a Severity Level V Violation. (Supplement 1)

Pursuant to the provisions of 10 CFR 2.201, GPU Nuclear Corporation is

-hereby required to submit to this office within thirty days of the date of the letter which transmitted this Notice, a written statement or explana-tion in reply,. including: (1) the corrective steps which have been _taken and the results achieved; (2) corrective steps which will be taken to avoid further. violations; and (3) the date when full compliance will be achieved.

Where good cause is shown, consideration will be given to extending this response time.

DR ADO K O O D

G OFFICIAL RECORD COPY IR OYC 86 0004.0.0 05/23/86